Skip to Content

Notice

Certain Frozen Warmwater Shrimp from Ecuador: Notice of Extension of Time Limit for the Final Results of the Third Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

June 12, 2009.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Gemal Brangman at (202) 482-3773, or David Goldberger at (202) 482-4136, AD/CVD Operations, Office 2, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On March 9, 2009, the Department of Commerce (the Department) published a notice for the preliminary results of the administrative review of the antidumping duty order on certain frozen warmwater shrimp from Ecuador covering the period February 1, 2007, through August 14, 2007. See Certain Frozen Warmwater Shrimp from Ecuador: Preliminary Results of Antidumping Duty Administrative Review, 74 FR 9983 (March 9, 2009). The final results for this administrative review are currently due no later than July 7, 2009, 120 days from the date of publication of the preliminary results of review.

Extension of Time Limit for the Final Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to issue the final results of an administrative review within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within that time period, section 751(a)(3)(A) of the Act allows the Department to extend the deadline for the final results to a maximum of 180 days after the date on which the preliminary results are published.

The Department determines that completion of the final results of the review within the original time limit is not practicable. Due to the complexity of the issues raised in this review, the Department requires additional time to review and analyze them in order to complete this review. Therefore, the Department is extending the time limit for completion of the final results of this review by 60 days, in accordance with section 751(a)(3)(A) of the Act. The final results are now due no later than September 8, 2009.

We are issuing and publishing this notice in accordance with sections 751(a)(1) and 777(i)(1) of the Act.

Start Signature

Dated: June 8, 2009.

John M. Andersen,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. E9-13875 Filed 6-11-09; 8:45 am]

BILLING CODE 3510-DS-S