Skip to Content

Notice

Certain Cased Pencils From the People's Republic of China: Extension of Time Limit for Preliminary Results of the Antidumping Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 36164

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Joseph Shuler at (202) 482-1293 or Yasmin Nair at (202) 482-3813; AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On February 2, 2009, the Department published a notice of initiation of administrative review of the antidumping duty order on certain cased pencils from the People's Republic of China, covering the period December 1, 2007 through November 30, 2008. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 74 FR 5821 (February 2, 2009). The current deadline for the preliminary results of this administrative review is September 2, 2009.

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department of Commerce (“the Department”) to issue the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results of review within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend these deadlines to a maximum of 365 days and 180 days, respectively.

Extension of Time Limit for Preliminary Results

The Department requires additional time to review and analyze the sales and cost responses in this administrative review. The Department has also found the need to issue additional supplemental questionnaires to respondents in this review. Moreover, the Department requires additional time to analyze complex issues related to surrogate value selections. Thus, it is not practicable to complete this review within the originally anticipated time limit (i.e., by September 2, 2009). Therefore, the Department is extending the time limit for completion of the preliminary results by 104 days to not later than December 15, 2009, in accordance with section 751(a)(3)(A) of the Act.

We are issuing and publishing this notice in accordance with sections 751(a)(1) and 777(i)(1) of the Act.

Start Signature

Dated: July 14, 2009.

John M. Andersen,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. E9-17424 Filed 7-21-09; 8:45 am]

BILLING CODE 3510-DS-P