Skip to Content

Notice

Carbazole Violet Pigment 23 from India: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Sean Carey or Dana Mermelstein, AD/CVD Operations, Office 6, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington DC 20230; telephone: (202) (202) 482-3964 and (202) 482-1391, respectively.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On January 27, 2009, in response to a timely request from Alpanil Industries, Ltd. (Alpanil) the Department of Commerce (the Department) initiated an administrative review of the countervailing duty order on carbazole violet pigment 23 (CVP-23) from India. See Initiation of Antidumping and Countervailing Duty Administrative Reviews, 74 FR 5821 (February 2, 2009). This administrative review covers the period January 1, 2007 through December 31, 2007. The preliminary results of this administrative review are currently due no later than September 2, 2009.Start Printed Page 41865

Extension of Time Limit for Preliminary Results

Pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), and 19 CFR 351.213(h)(1), the Department shall issue preliminary results in an administrative review of a countervailing duty order within 245 days after the last day of the anniversary month of the order for which the administrative review was requested. However, if the Department determines that it is not practicable to complete the review within the aforementioned specified time limits, section

751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2) allow the Department to extend the 245-day period to 365 days.

Pursuant to section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(2), we determine that it is not practicable to complete the results of this review within the original time limit. The Department needs additional time to analyze the supplemental questionnaire responses, which were recently submitted, and to determine whether any additional information is required. In accordance with section 751(a)(3)(A) of the Act, the Department has decided to extend the time limit for the preliminary results from 245 days to 365 days; the preliminary results will now be due no later than December 31, 2009. Unless extended, the final results continue to be due 120 days after the publication of the preliminary results, pursuant to section 751(a)(3)(A) of the Act and 19 CFR 351.213(h)(1) of the Department's regulations.

This notice is issued and published in accordance with sections 751(a)(3)(A) and 777(i)(1) of the Act.

Start Signature

Dated: August 10, 2009.

John M. Andersen,

Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

End Signature End Supplemental Information

[FR Doc. E9-19923 Filed 8-18-09; 8:45 am]

BILLING CODE 3510-DS-S