Legal Status
Legal Status
Notice
Certain Welded Carbon Steel Pipe and Tube from Turkey: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review
A Notice by the International Trade Administration on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 01/25/2010
- Agencies:
- International Trade Administration
- Document Type:
- Notice
- Document Citation:
- 75 FR 3896
- Page:
- 3896-3897 (2 pages)
- Agency/Docket Number:
- A-489-501
- Document Number:
- 2010-1343
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/2010-1343 https://www.federalregister.gov/d/2010-1343
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Joy Zhang, or Christopher Hargett, AD/CVD Operations, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, Room 4014, 14th Street and Constitution Ave., NW, Washington, DC Start Printed Page 389720230, telephone: (202) 482-1168 or (202) 482-4161, respectively.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Background
On June 24, 2009, the U.S. Department of Commerce (“the Department”) published a notice of initiation of the administrative review of the antidumping duty order on certain welded carbon steel pipe and tube from Turkey covering the period May 1, 2008, through April 30, 2009. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 74 FR 30052 (June 24, 2009). The preliminary results are currently due no later than January 31, 2010.
Extension of Time Limit for Preliminary Results
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested. Section 751(a)(3)(A) of the Act further states that if it is not practicable to complete the review within the time period specified, the administering authority may extend the 245-day period to issue its preliminary results to up to 120 days.
We determine that completion of the preliminary results of this review within the 245-day period is not practicable for the following reason. The respondent claimed that during the period of review, there were significant changes in the total cost of manufacturing due to significant changes in the cost of the primary raw material, hot-rolled sheet. This requires the Department to gather and analyze a significant amount of information pertaining to the company's sales practices and manufacturing costs. Given the complexity of this issue, and in accordance with section 751(a)(3)(A) of the Act, we are extending the time period for issuing the preliminary results of the review by 120 days. The preliminary results are now due no later than May 31, 2010. The final results continue to be due 120 days after publication of the preliminary results.
This notice is issued and published in accordance with section 751(a)(3)(A) of the Act.
Start SignatureDated: January 19, 2010.
John M. Andersen,
Acting Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.
[FR Doc. 2010-1343 Filed 1-22-10; 8:45 am]
BILLING CODE 3510-DS-S