This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
To ensure comments will be considered, the BLM must receive written comments on the Silver State Solar Project Draft EIS within 45 days following the date the Environmental Protection Agency publishes its Notice of Availability of this Draft EIS in the Federal Register. The BLM will announce future meetings or hearings and any other public involvement activities at least 15 days in advance through public notices, local news media, and the BLM Web site at: http://www.blm.gov/ nv/st/en/fo/lvfo.html.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Classification for Lease and Subsequent Conveyance for Recreation and Public Purposes of Public Lands (N-94234) for a Park in the Southwest Portion of the Las Vegas Valley, Clark County, NV
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
28
as of
11/10/2026 at 4:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Bureau of Land Management, Interior.
ACTION:
Notice of availability.
SUMMARY:
In accordance with the National Environmental Policy Act of 1969, (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement (EIS) for the Silver State Solar Project, Primm, Nevada, and by this Notice is announcing the opening of the comment period.
DATES:
To ensure comments will be considered, the BLM must receive written comments on the Silver State Solar Project Draft EIS within 45 days
( printed page 19991)
following the date the Environmental Protection Agency publishes its Notice of Availability of this Draft EIS in the
Federal Register.
The BLM will announce future meetings or hearings and any other public involvement activities at least 15 days in advance through public notices, local news media, and the BLM Web site at:
http://www.blm.gov/nv/st/en/fo/lvfo.html.
ADDRESSES:
You may submit comments by any of the following methods:
NextLight Renewable Power, LLC applied to the BLM for a right-of-way on public lands to construct a solar photovoltaic (PV) plant facility approximately two miles southeast of Primm, Clark County, Nevada. The facility is expected to operate for approximately 50 years. The proposed project would produce 400 megawatts (MW) of renewable energy.
The solar field and infrastructure would consist of single-axis tracker systems or fixed panels, an underground and overhead electrical power collection system, two step-up transformers, 230 kilovolt (kV) and 220 kV transmission lines, an operation and maintenance area, a switchyard, paved access and maintenance roads, flood and drainage controls, and a fire break.
The Draft EIS describes and analyzes site-specific impacts of the proposed project on air quality; biological, cultural, water, soil, visual, paleontological, and geological resources; recreation; land use; noise; public health; socioeconomics; and traffic and transportation. The Draft EIS also addresses hazardous materials handling, waste management, worker safety, fire protection, facility design engineering, efficiency, reliability, transmission system engineering, transmission line safety, and nuisance.
The EIS analyzes three alternatives, including the no action alternative (Alternative 1) and two action alternatives. Alternative 2—the proposed action—would disturb up to 2,996 acres of land and would include the use of berms to reduce erosion. Alternative 3 would disturb up to 3,669 acres of land and would employ an alternate drainage and flood control design to control erosion. Both action alternatives would use solar PV technology, although the specific types of arrays and trackers have not been determined at this time. The Draft EIS describes the different types of solar arrays and trackers and their respective impacts.
Formal scoping for the project occurred from June 30, 2009 to July 31, 2009 (74 FR 31306). On September 17, 2009, the reopening of the comment period published with a new closing date of October 19, 2009 (74 FR 47820). A total of 33 comments were submitted during the scoping period. The comments identified concerns in a broad range of categories: surface water/storm runoff; off-highway vehicle access for recreation; federally-listed species and their habitat, including desert tortoise habitat and rare plants; alternatives for analysis.
Maps of the proposed project area and the alternatives being analyzed in the Draft EIS are available at the BLM Southern Nevada District Office.
Before including your address, phone number, e-mail address, or other personal identifying information in your comment, you should be aware that your entire comment—including your personal identifying information—may be made publicly available at any time; therefore, personal identifying information such as addresses, phone numbers, and e-mail address, may be withheld.