This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of Extension of Time Limit for Final Results of 1998- 1999 Antidumping Duty Administrative Review and New Shipper Review of Stainless Steel Bar From India.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
30
as of
11/16/2026 at 2:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
DATES:
Effective Date:
October 25, 2010.
FOR FURTHER INFORMATION CONTACT:
Austin Redington, AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone (202) 482-1664.
SUPPLEMENTARY INFORMATION:
Background
On March 30, 2010, the Department of Commerce (“Department”) published a notice of initiation of an administrative review of the antidumping duty order on stainless steel bar from India covering the period February 1, 2009, through January 31, 2010.
See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part,75 FR 15679 (March 30, 2010). The preliminary results for this administrative review are currently due no later than October 31, 2010.
Extension of Time Limits for Preliminary Results
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to issue the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an antidumping duty order for which a review is requested and issue the final results within 120 days after the date on which the preliminary results are published. However, if it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend these deadlines to a maximum of 365 days and 180 days, respectively.
Due to the complexity of the issues in this case, the Department requires additional time to review and analyze the respondent's sales and cost information and to issue supplemental questionnaires. In addition, pursuant to 19 CFR 351.307(b)(1)(iii), the Department plans to conduct verification in response to Venus Wire Industries Pvt. Ltd.'s (“Venus”) request for revocation.[1]
The Department will require time to conduct the verification and to write its verification report, prior to publishing the preliminary results. Thus, it is not practicable to complete the preliminary results of this review within the original time limit (
i.e.,
October 31, 2010). Therefore, the Department is extending the time limit for completion of the preliminary results to no later than February 28, 2011, in accordance with section 751(a)(3)(A) of the Act.
We are issuing and publishing this notice in accordance with sections 751(a)(3)(A) and 777(i)(1) of the Act.
( printed page 65450)
Dated: October 18, 2010.
Ronald K. Lorentzen,
Deputy Assistant Secretary for Import Administration.