Skip to Content

Notice

Central Utah Project Completion Act

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Department of the Interior, Office of the Assistant Secretary—Water and Science.

ACTION:

Notice of availability of the Finding of No Significant Impact (FONSI) and associated Final Environmental Assessment (EA)—Realignment of a Portion of the Utah Lake Drainage Basin Water Delivery System.

SUMMARY:

On November 15, 2010, the Department of the Interior (Interior), signed a FONSI associated with the Final EA—Realignment of a Portion of the Utah Lake Drainage Basin Water Delivery System. Interior has determined that the proposed action as detailed in the FONSI will not have a significant impact on the quality of the human environment, and that an environmental impact statement is not required.

ADDRESSES:

Copies of the EA and FONSI are available for inspection at:

  • Central Utah Water Conservancy District, 355 West University Parkway, Orem, Utah 84058-7303.
  • Department of the Interior, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606.

The documents are also available at http://www.cuwcd.com and http://www.cupcao.gov.

Start Further Info

FOR FURTHER INFORMATION:

Contact Mr. Lee Baxter, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606; (801) 379-1174; e-mail at lbaxter@uc.usbr.gov.

Start Signature

Date: November 17, 2010.

Reed R. Murray,

Program Director, Central Utah Project Completion Act, Department of the Interior.

End Signature End Further Info End Preamble

[FR Doc. 2010-29582 Filed 11-23-10; 8:45 am]

BILLING CODE 4310-RK-P