Legal Status
Legal Status
Notice
Stainless Steel Bar From India: Extension of Time Limit for the Final Results of the 2009-2010 Antidumping Duty Administrative Review
A Notice by the International Trade Administration on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 04/14/2011
- Agencies:
- International Trade Administration
- Document Type:
- Notice
- Document Citation:
- 76 FR 20950
- Page:
- 20950 (1 page)
- Agency/Docket Number:
- A-533-810
- Document Number:
- 2011-9115
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/2011-9115 https://www.federalregister.gov/d/2011-9115
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
DATES:
Effective Date: April 14, 2011.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Scott Holland or Yasmin Nair, AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone (202) 482-1279 and (202) 482-3813, respectively.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Background
On March 4, 2011, the Department of Commerce (“Department”) published its preliminary results of the 2009-2010 antidumping duty administrative review. See Stainless Steel Bar From India: Preliminary Results of, and Partial Rescission of, the Antidumping Duty Administrative Review, and Intent Not To Revoke the Order, in Part, 76 FR 12044 (March 4, 2011) (“Preliminary Results”). The final results for this review are currently due no later than July 2, 2011.
Extension of Time Limit for Final Results
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“Act”), requires that the Department issue the final results of an administrative review within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within this time period, section 751(a)(3)(A) of the Act allows the Department to extend the deadline for the final results to a maximum of 180 days after the date on which the preliminary results are published.
The Department has determined that it requires additional time to complete this review. After publishing the Preliminary Results, the Department conducted a verification of the cost of production responses for Venus Wire Industries Pvt. Ltd. and its affiliate, Sieves Manufacturers (India) Private Limited. The Department intends to issue a comprehensive report of the results of this verification. Further, the Department needs to allow time for parties to review this verification report, which further delays the briefing schedule. Thus, it is not practicable to complete this review by July 2, 2011, and the Department is extending the time limit for completion of the final results by an additional 60 days to August 31, 2011.
This notice is published pursuant to sections 751(a) and 777(i) of the Act.
Start SignatureDated: April 7, 2011.
Christian Marsh,
Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.
[FR Doc. 2011-9115 Filed 4-13-11; 8:45 am]
BILLING CODE 3510-DS-P