Notice
Nevada Irrigation District; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
A Notice by the Federal Energy Regulatory Commission on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 05/02/2011
- Agencies:
- Federal Energy Regulatory Commission
- Document Type:
- Notice
- Document Citation:
- 76 FR 24466
- Page:
- 24466-24467 (2 pages)
- Agency/Docket Number:
- Project No. 2266-102
- Document Number:
- 2011-10536
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
There is no table of contents available for this document.Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/2011-10536 https://www.federalregister.gov/d/2011-10536
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2266-102.
c. Date Filed: April 15, 2011.
d. Applicant: Nevada Irrigation District.
e. Name of Project: Yuba-Bear Project.
f. Location: The Yuba-Bear Project is located on the west slope of the Sierra Nevada on the Middle Yuba River, Canyon Creek, Fall Creek, Rucker Creek, and Bear River, in Nevada, Placer and Sierra Counties, California. A large portion of the project is located on the Tahoe National Forest. Some of the project is located on federally-owned land managed by the Bureau of Land Management as part of the Sierra Resource Management Area.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ron Nelson, General Manager, Nevada Irrigation District, 1036 West Main Street, Grass Valley, CA 95945, (530) 271-6824 or e-mail nelson@nid.dst.ca.us.
i. FERC Contact: Alan Mitchnick, (202) 502-6074 or alan.mitchnick@ferc.gov.
j. This application is not ready for environmental analysis at this time.
k. Project Description: The project consists of four developments—Bowman, Dutch Flat, Chicago Park, and Rollins—which, in total, include: 13 main dams with a combined gross storage capacity of 207,865 acre-feet of water; four water conduits; five diversion dams; four powerhouses with a combined installed capacity of 79.32 megawatts; one 9.0-mile-long, 60-kilovolt transmission line; and appurtenant facilities and structures, including recreation facilities.
l. Locations of the Application: A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.
m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Procedural Schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate.
Milestone | Target date |
---|---|
Notice of Acceptance/Notice of Ready for Environmental Analysis | June 2011. |
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions | August 2011. |
Commission issues Draft EIS | February 2012. |
Comments on Draft EIS | March 2012. |
Modified Terms and Conditions | May 2012. |
Commission Issues Final EIS | September 2012. |
o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.
Start SignatureDated: April 26, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-10536 Filed 4-29-11; 8:45 am]
BILLING CODE 6717-01-P