This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Florida Power Corporation, Crystal River Unit 3 Nuclear Generating Plant; Notice of Availability of Draft Supplement 44 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Crystal River Unit 3 Nuclear Generating Plant
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
There is no table of contents available for this document.
Related Documents
Enhanced Content - Related Documents
FederalRegister.gov uses the agency dockets published with the document to display related documents.
Florida Power Corporation, Crystal River Unit 3 Nuclear Generating Plant; Notice of Availability of Draft Supplement 44 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of Crystal River Unit 3 Nuclear Generating Plant
Comments are no longer being accepted.
See DATES for details.
12 comments have
been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold,
certain submissions (or portions thereof). Submitted comments may not be
available to be read until the agency has approved them.
Docket Title
Document ID
Comments
Application for Renewal: Florida Power Corporation; Crystal River Unit 3 Nuclear Generating Plant
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Application for Renewal: Florida Power Corporation; Crystal River Unit 3 Nuclear Generating Plant
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
89
as of
09/08/2026 at 4:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has published a draft plant-specific supplement to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS), NUREG-1437, regarding the renewal of operating license DPR-72 for an additional 20 years of operation for Crystal River Unit 3 Nuclear Generating Plant. Crystal River Unit 3 Nuclear Generating Plant is located in Crystal River, Florida, approximately 80 miles north of Tampa, Florida. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources.
Any interested party may submit comments on the draft supplement to the GEIS for consideration by the NRC staff. To be considered, comments on the draft supplement to the GEIS and the proposed action must be received by July 25, 2011. The NRC staff is able to ensure consideration only for comments received on or before this date.
Addresses:
Please include Docket ID NRC-2009-0039 in the subject line of your comments. Comments submitted in writing or in electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site,
http://www.regulations.gov.
Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. The NRC requests that any party soliciting or aggregating comments received from other persons for
( printed page 32238)
submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and, therefore, they should not include any information in their comments that they do not want publicly disclosed.
Federal rulemaking Web site:
Go to
http://www.regulations.gov
and search for documents filed under Docket ID NRC-2009-0039. Address questions about NRC dockets to Carol Gallagher at 301-492-3668 or by e-mail at
Carol.Gallagher@nrc.gov.
Mail comments to:
Cindy Bladey, Chief, Rules, Announcements, and Directives Branch (RADB), Office of Administration,
Mail Stop:
TWB-05-B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
Fax comments to:
RADB at 301-492-3446.
You can access publicly available documents related to this notice using the following methods:
NRC's Public Document Room (PDR):
The public may examine and have copied, for a fee, publicly available documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
NRC's Agencywide Documents Access and Management System (ADAMS):
Publicly available documents created or received at the NRC are available online in the NRC Library at
http://www.nrc.gov/reading-rm/adams.html.
From this page, the public can gain entry into ADAMS, which provides text and image files of NRC's public documents. If you do not have access to ADAMS or if there are problems in accessing the documents located in ADAMS, contact the NRC's PDR reference staff at 1-800-397-4209, 301-415-4737, or by e-mail at
pdr.resource@nrc.gov.
The Accession Number for draft Supplement 44 to the GEIS is ML11139A153.
Federal rulemaking Web site:
Public comments and supporting materials related to this notice can be found at
http://www.regulations.gov
by searching for Docket ID NRC-2009-0039.
In addition, a copy of the draft supplement to the GEIS is available to local residents near the site at the Central Ridge Library located at 425 West Roosevelt Boulevard, Beverly Hills, Florida 34465, and at the Coastal Region Library located at 8619 West Crystal Street, Crystal River, Florida 34428.
All comments received by the NRC, including those made by Federal, State, and local agencies; Native American Tribes; or other interested persons, will be made available electronically at the NRC's PDR in Rockville, Maryland, and through ADAMS. Comments received after the due date will be considered only if it is practical to do so.
The NRC staff will hold public meetings prior to the close of the public comment period to present an overview of the draft plant-specific supplement to the GEIS and to accept public comments on the document. Two meetings will be held at the Plantation Inn, 9301 W. Fort Island Trl, Crystal River, FL 34429, on Tuesday, June 28, 2011. The first session will convene at 2 p.m. and will continue until 5 p.m., as necessary. The second session will convene at 7 p.m. and will continue until 10 p.m., as necessary. The meetings will be transcribed and will include: (1) A presentation of the contents of the draft plant-specific supplement to the GEIS and (2) the opportunity for interested government agencies, organizations, and individuals to provide comments on the draft report. Additionally, the NRC staff will host informal discussions one hour prior to the start of each session at the same location. No comments on the draft supplement to the GEIS will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meeting or in writing. Persons may pre-register to attend or present oral comments at the meeting by contacting Mr. Daniel Doyle, the NRC Environmental Project Manager, at 1-800-368-5642, extension 3748, or by e-mail at
Daniel.Doyle@nrc.gov
no later than Thursday, June 23, 2011. Members of the public may also register to provide oral comments within 15 minutes of the start of each session. Individual oral comments may be limited by the time available, depending on the number of persons who register. If special equipment or accommodations are needed to attend or present information at the public meeting, the need should be brought to Mr. Doyle's attention no later than Thursday, June 23, 2011, to provide the NRC staff adequate notice to determine whether the request can be accommodated.
For Further Information Contact:
Mr. Daniel Doyle, Division of License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Mail Stop O-11F1, Washington, DC 20555-0001. Mr. Doyle may be contacted at the aforementioned telephone number or e-mail address.
Dated at Rockville, Maryland, this 26th day of May 2011.
For the Nuclear Regulatory Commission.
David J. Wrona,
Projects Branch 2, Division of License Renewal, Office of Nuclear Reactor Regulation.
12 comments have been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold, certain submissions (or portions thereof). Submitted comments may not be available to be read until the agency has approved them.