Skip to Content

Notice

Placer County Water Agency; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a. Type of Application: Conduit Exemption.

b. Project No.: 14297-000.

c. Date filed: September 29, 2011.

d. Applicant: Placer County Water Agency.

e. Name of Project: Gold Run Pipeline Small Hydroelectric Project.

f. Location: The proposed Gold Run Pipeline Small Hydroelectric Project would be located along the Placer County Water Agency's (PCWA) Boardman Canal, near the Towns of Gold Run and Auburn, Placer County, California. The land on which all the project structures are located is owned by the applicant.

g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.

h. Applicant Contact: Mr. Brian C. Martin, Director of Technical Services, Placer County Water Agency, P.O. Box 6570, Auburn, CA 95604, phone (530) 823-4886.

i. FERC Contact: Linda Jemison, (202) 502-6363, linda.jemison@ferc.gov

j. Status of Environmental Analysis: This application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions.

k. Deadline for filing responsive documents: Due to the small size of the proposed project, as well as the resource agency consultation letters filed with the application, the 60-day timeframe specified in 18 CFR 4.34(b) for filing all comments, motions to intervene, protests, recommendations, terms and conditions, and prescriptions is shortened to 30 days from the issuance date of this notice. All reply comments filed in response to comments submitted by any resource agency, Indian tribe, or person, must be filed with the Commission within 45 days from the issuance date of this notice.

Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 Start Printed Page 67718CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site under the http://www.ferc.gov/​docs-filing/​efiling.asp. The Commission strongly encourages electronic filings.

The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

l. Description of Project: The proposed Gold Run Pipeline Small Hydroelectric Project would consist of a proposed powerhouse containing one proposed generating unit with an installed capacity of 300 kilowatts. The applicant estimates the project would have an average annual generation of 1,062 MWh per year.

m. This filing is available for review and reproduction at the Commission in the Public Reference Room, Room 2A, 888 First Street, NE., Washington, DC 20426. The filing may also be viewed on the web at http://www.ferc.gov/​docs-filing/​elibrary.asp using the “eLibrary” link. Enter the docket number, here P-14297, in the docket number field to access the document. For assistance, call toll-free 1-(866)-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is also available for review and reproduction at the address in item h above.

n. Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice.

o. Notice of Intent— A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit a competing development application. A notice of intent must be served on the applicant(s) named in this public notice.

p. Protests or Motions to Intervene—Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.

q. All filings must (1) bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “NOTICE OF INTENT TO FILE COMPETING APPLICATION”, “COMPETING APPLICATION”, “COMMENTS”, “REPLY COMMENTS,” “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and seven copies to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

r. Waiver of Pre-filing Consultation: On July 27, 2011, the applicant informed agencies and affected Indian Tribes of its request to waive the Commission's consultation requirements under 18 CFR 4.38(c). The following agencies and Indian Tribes support the waiver request: (1) Shingle Springs Rancheria and (2) United Auburn Indian Community. On July 13, 2011, Placer County Water Agency held a joint meeting with the pertinent agencies to which the public was invited to attend. No other comments were received. Therefore, we intend to accept the consultation that has occurred on this project during the pre-filing period and we intend to waive pre-filing consultation under section 4.38(c), which requires, among other things, conducting studies requested by resource agencies, and distributing and consulting on a draft exemption application.

Start Signature

Dated: October 27, 2011.

Kimberly D. Bose,

Secretary.

End Signature End Preamble

[FR Doc. 2011-28397 Filed 11-1-11; 8:45 am]

BILLING CODE 6717-01-P