Skip to Content

Proposed Rule

Floodplain Management and Protection of Wetlands

This document is a correction of an document that was published on 12/12/2011. View Uncorrected Document

Document Details

Information about this document as published in the Federal Register.

Enhanced Content

Relevant information about this document from Regulations.gov provides additional context. This information is not part of the official Federal Register document.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 79145

Correction

In proposed rule document 2011-31629 appearing on pages 77162-77175 in the issue of December 12, 2011, make the following correction:

[Corrected]

The table on page 77171 is corrected to read as set forth below:

Table 1

Type of proposed action (new reviewable action or an amendment) 1Type of proposed action
FloodwaysCoastal high hazard areasWetlands or 100-year floodplain outside coastal high hazard area and floodwaysNon-wetlands area outside of the 100-year and within the 500-year floodplain
Critical Actions as defined in § 55.12(b)(2)Critical actions not allowed.Critical actions not allowed.Allowed if the proposed critical action is processed under § 55.20.2Allowed if the proposed critical action is processed under § 55.20.2
Non-critical actions not excluded under § 55.12(b) or (c)Allowed only if the proposed non-critical action is a functionally dependent use and processed under § 55.20.2Allowed only if the proposed non-critical action: (A)(1) Is either (a) reconstruction of a structure destroyed by a disaster, or (b) an improvement of an existing structure; (2) is designed for a Coastal High Hazard Area under § 55.1(c)(3); and (3) is processed under § 55.20; 2 or (B) Is a functionally dependent use processed under § 55.20.Allowed if proposed non-critical action is processed under § 55.20.2Any non-critical action is allowed without processing under this part.
1 Under E.O. 11990, the decision making process in § 55.20 only applies to Federal assistance for new construction in wetlands locations.
2 Or those paragraphs of § 55.20 that are applicable to an action listed in § 55.12(a).
End Preamble

[FR Doc. C1-2011-31629 Filed 12-20-11; 8:45 am]

BILLING CODE 1505-01-D