The Commission has received two preliminary permit applications deemed filed on February 1, 2011, at 8:30 a.m.,[]
for proposed projects to be located on the Mississippi River, in St. James Parish, Louisiana. The applications were filed by FFP Project 18, LLC for Project No. 12857-002, and Northland Power Mississippi River LLC for Project No. 14073-000.
On January 17, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations.[]
The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application.
The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing.
Dated: January 10, 2012.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2012-695 Filed 1-13-12; 8:45 am]