This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
30
as of
11/15/2026 at 4:15 pm EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2012-1811 as it appeared on Public Inspection on
01/26/2012 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2012-1811 (77 FR 4278)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
DATES:
Effective Date:
January 27, 2012.
FOR FURTHER INFORMATION CONTACT:
Mark Flessner or Robert James, AD/CVD Enforcement Office 7, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW., Washington, DC 20230; telephone: (202) 482-6312 and (202) 482-0649, respectively.
SUPPLEMENTARY INFORMATION:
Background
On June 28, 2011, the Department published a notice of initiation of an antidumping duty administrative review for,
inter alia,
light-walled rectangular pipe and tube from Turkey for the May 1, 2010, through April 30, 2011, period of review (POR).
See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part,76 FR 37781 (June 28, 2011) (
Initiation Notice). This review covers Noksel Celik Boru Sanayi A.S. (Noksel). The preliminary results for this administrative review are due no later than January 31, 2012.
Extension of Time Limit for Preliminary Results
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to complete the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested. However, if it is not practicable to complete the review within this time period, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary results to a maximum of 365 days after the last day of the anniversary month of an order for which a review is requested.
The Department has determined it is not practicable to complete this review within the statutory time limit because of significant issues that require additional time to evaluate. These include complicated issues involving Noksel's sales terms, use of multiple currencies in both markets, duty drawback claims, and certain movement expenses. The Department requires additional time to analyze sufficiently information submitted by the respondent in this administrative review. Accordingly, the Department is extending the time limit for completion of the preliminary results of this administrative review until no later than May 30, 2012, which is 120 days from the January 31, 2012, deadline and less than 365 days after the last day of the anniversary month of the order for which this review was requested. The final results continue to be due 120 days after publication of the preliminary results.
This notice is issued and published in accordance with section 351.213(d)(4) of the Department's regulations and
( printed page 4279)
sections 751(a)(3)(A) and 777(i)(1) of the Act.
Dated: January 20, 2012.
Christian Marsh,
Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.