Skip to Content

Notice

Published Document: 2012-3787 (77 FR 9623)

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

DATES:

February 17, 2012.

FOR FURTHER INFORMATION CONTACT:

Rebecca Pandolph, AD/CVD Operations, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue NW., Washington, DC 20230, telephone: (202) 482-3627.

SUPPLEMENTARY INFORMATION:

On February 28, 2011, the Department of Commerce (“Department”) published a notice of initiation of an administrative review of the antidumping duty order on wooden bedroom furniture from the People's Republic of China covering the period January 1, 2010, through December 31, 2010.[1] On October 24, 2011, the Department published its preliminary results of the administrative review.[2] The final results of the administrative review are currently due no later than February 21, 2012.

Statutory Time Limits

In antidumping duty administrative reviews, section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to make a final determination in an administrative review of an antidumping duty order within 120 days after the date on which the preliminary results are published. However, if it is not practicable to complete the review within this time period, section 751(a)(3)(A) of the Act allows the Department to extend the 120-day period to 180 days after publication of the preliminary results (or 300 days if the Department has not extended the time limit for the preliminary results).

Extension of Time Limit for Final Results

The Department has determined that it is not practicable to complete the review within the 120-day time period because it requires additional time to evaluate the arguments and submissions made by interested parties following the Preliminary Results. Therefore, in accordance with section 751(a)(3)(A) of the Act, the Department is extending the time period for completing the final results of the instant administrative review by 30 days until March 22, 2012.

This notice is published pursuant to sections 751(a)(3)(A) and 777(i) of the Act.

( printed page 9624)

Dated: February 10, 2012.

Christian Marsh,

Deputy Assistant Secretary for Antidumping and Countervailing Duty Operations.

Footnotes

1.   See Initiation of Administrative Review of the Antidumping Duty Order on Wooden Bedroom Furniture From the People's Republic of China,76 FR 10880 (February 28, 2011).

Back to Citation

2.   See Wooden Bedroom Furniture From the People's Republic of China: Preliminary Results of Antidumping Duty Administrative Review and Intent To Rescind Review in Part,76 FR 65684 (October 24, 2011) (“ Preliminary Results ”).

Back to Citation

[FR Doc. 2012-3787 Filed 2-16-12; 8:45 am]

BILLING CODE 3510-DS-P