This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
913
as of
09/08/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2012-6860 as it appeared on Public Inspection on
03/20/0012 at 3:48 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2012-6860 (77 FR 16471)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT.
ACTION:
Issuance of Advisory Bulletin.
SUMMARY:
This notice advises owners and operators of pipeline facilities of PHMSA's plan for implementing the national registry of pipeline and liquefied natural gas operators. This notice provides updates to the information contained in a PHMSA Advisory Bulletin published on January 13, 2012 (77 FR 2126).
FOR FURTHER INFORMATION CONTACT:
Jamerson Pender, Information Resources Manager, 202-366-0218 or by email at
Jamerson.Pender@dot.gov.
SUPPLEMENTARY INFORMATION:
I. Background
On November 26, 2010, PHMSA published a final rule in the
Federal Register
(75 FR 72878) titled: “Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements.” That final rule added two new sections, 49 CFR 191.22 and 195.64, to the pipeline safety regulations that concerned the establishment of a national registry of pipeline and liquefied natural gas (LNG) operators. New operators use the national registry to obtain an Operator Identification (OPID) Number and existing operators use it to notify PHMSA of certain actions, including company name changes, certain construction activities, and project planning.
The national pipeline operator registry became effective on January 1, 2012. In compliance with the Paperwork Reduction Act requirements, PHMSA issued a 60-day
Federal Register
notice on December 13, 2010 (75 FR 77694), and a 30-day
Federal Register
notice on
( printed page 16472)
November 10, 2011 (76 FR 70217). The purpose of these notices was to gather and respond to comments on the actual forms used to collect information for the national pipeline operator registry.
PHMSA is issuing this advisory bulletin to clarify the implementation of the national pipeline operator registry.
II. Advisory Bulletin (ADB-2012-04)
To:
Owners and Operators of Pipeline and LNG Facilities.
Subject:
Implementation of the National Registry of Pipeline and LNG Operators.
Advisory:
This notice advises owners and operators of pipeline facilities of PHMSA's plan for implementing the national registry of pipeline and LNG operators. This notice provides updates to the information contained in a PHMSA Advisory Bulletin on the same subject published on January 13, 2012 (77 FR 2126).
OPID Assignment Requests—§§ 191.22(a) and 195.64(a)
From January 1, 2012, to January 27, 2012, PHMSA collected fillable pdf versions of OPID Assignment Request (Form F 1000.1). Starting January 27, 2012, the Online Data Reporting System (ODES) is used by entities requesting a new OPID. PHMSA is entering the pdf versions of OPID Assignment Request forms into ODES and will notify requestors when the OPID has been established.
While subject to the pipeline safety regulations, operators of master meter systems or petroleum gas systems that serve fewer than 100 customers from a single source are not required to file annual reports (see 49 CFR 191.11(b)). There were several thousand master meter system operators and several hundred small liquefied petroleum gas (LPG) operators who fell within the scope of this exception as of December 31, 2011.
While also subject to the requirements of 49 CFR 191.22, PHMSA previously determined that the operators of these systems would not be required to obtain an OPID. Instead, PHMSA agreed to create OPIDs for these operators based on the existing data in the agency's files. That is currently underway and will be completed by May 1, 2012.
In light of this experience, PHMSA has decided that master meter and small LPG operators established after December 31, 2011, will be required to obtain an OPID in accordance with 49 CFR 191.22. On May 1, 2012, PHMSA will modify ODES to allow these master meter and small LPG operators to request an OPID.
The requirement to request an OPID continues to not apply to master meter and small LPG operators in existence prior to December 31, 2011.
Notifications—§§ 191.22(c) and 195.64(c)
On January 1, 2012, PHMSA began collecting fillable pdf versions of Notifications (Form F 1000.2). Starting March 27, 2012, operators will be able to submit notifications online through ODES, and PHMSA will enter all of the pdf versions of the notifications into ODES shortly thereafter.
Hazardous liquid pipeline operators are advised to disregard the notification requirement in § 195.64(c)(1)(iii). That provision requires notification for construction of any new pipeline facility without regard to cost. Section 195.64(c)(1)(i) also requires notification for construction of a new pipeline facility, but only for those projects with a cost of $10 million or more. PHMSA only wants notification of hazardous liquid pipeline facility construction projects with a cost of $10 million or more and plans to remove § 195.64(c)(1)(iii) in a future rulemaking.
OPID Validation—§§ 191.22(b) and 195.64(b)
On March 27, 2012, operators will be able to complete the validation process online. PHMSA requests that all OPIDs issued prior to January 1, 2012, complete the validation process. As with OPID Assignment Requests, master meter and small LPG operators in existence prior to December 31, 2011, are not required to complete the validation process. Based on the delayed availability of the on-line validation process, PHMSA is extending the regulatory deadline for validation from June 30, 2012, to September 30, 2012. PHMSA recommends that operators submit calendar year 2011 annual reports at least five working days prior to completing the validation process.
Further details on how to submit reports to PHMSA are available at
http://opsweb.phmsa.dot.gov.
Questions should be directed to the Office of Pipeline Safety operator helpline at 202-366-8075.