This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This deviation is effective from 8 a.m. on April 30, 2012 through 8 p.m. April 30, 2012.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
121
as of
11/12/2026 at 6:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2012-9733 as it appeared on Public Inspection on
04/20/2012 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2012-9733 (77 FR 24146)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of temporary deviation from regulations.
SUMMARY:
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Burlington Northern Santa Fe (BNSF) Railway Bridge across the Columbia River, mile 105.6, at Vancouver, WA. This deviation is necessary to accommodate maintenance of the train signaling system scheduled for April 30, 2012. This deviation allows the bridge to remain in the closed position for the duration of the maintenance activity.
DATES:
This deviation is effective from 8 a.m. on April 30, 2012 through 8 p.m. April 30, 2012.
ADDRESSES:
Documents mentioned in this preamble as being available in the docket are part of docket USCG-2012-
( printed page 24147)
0311 and are available online by going to
http://www.regulations.gov, inserting USCG-2012-0311 in the “Keyword” box and then clicking “Search”. They are also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or email the Bridge Administrator, Coast Guard Thirteenth District; telephone 206-220-7282 email
randall.d.overton@uscg.mil. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
BNSF has requested that the BNSF Swing Bridge across the Columbia River remain closed to vessel traffic to facilitate maintenance of the train signaling system. BNSF will be “cutting over” the train signaling system to a new system on April 30, 2012. During this cut-over the swing span of the BNSF Railway Bridge across the Columbia River will be disabled and the bridge will not be able to be opened. The BNSF Bridge crosses the Columbia River, mile 105.6, and in accordance to NOAA Chart 18526 provides 39 feet of vertical clearance above Columbia River Datum 0.0 while in the closed position. Vessels which do not require a bridge opening may continue to transit beneath the bridge during this closure period. Under normal operation the bridge opens on signal as required by 33 CFR 117.5. This deviation period is from 8 a.m. on April 30, 2012 through 8 p.m. April 30, 2012. The deviation allows the swing span of the BNSF Railway Bridge across the Columbia River, mile 105.6, to remain in the closed position and need not open for maritime traffic from 8 a.m. through 8 p.m. on April 30, 2012. The swing span will be required to open, if needed, for vessels engaged in emergency response operations during this closure period. The bridge shall operate in accordance to 33 CFR 117.5 at all other times. Waterway usage on this stretch of the Columbia River includes vessels ranging from commercial tug and tow vessels to recreational pleasure craft including cabin cruisers and sailing vessels. Mariners will be notified and kept informed of the bridge's operational status via the Coast Guard Notice to Mariners publication and Broadcast Notice to Mariners as appropriate.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.