Skip to Content

Rule

Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

Document Details

Information about this document as published in the Federal Register.

Enhanced Content

Relevant information about this document from Regulations.gov provides additional context. This information is not part of the official Federal Register document.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule.

SUMMARY:

This regulation extends the time-limited interim tolerances for the combined residues of the insecticide tetrachlorvinphos, in or on multiple commodities which are identified in Unit III. of this document, under the Federal Food, Drug, and Cosmetic Act (FFDCA).

DATES:

This regulation is effective March 13, 2013. Objections and requests for hearings must be received on or before May 13, 2013, and must be filed in accordance with the instructions provided in 40 CFR part 178 (see also Unit I.C. of the SUPPLEMENTARY INFORMATION).

ADDRESSES:

The docket for this action, identified by docket identification (ID) number EPA-HQ-OPP-2011-0360, is available at http://www.regulations.gov or at the Office of Pesticide Programs Regulatory Public Docket (OPP Docket) in the Environmental Protection Agency Docket Center (EPA/DC), EPA West Bldg., Rm. 3334, 1301 Constitution Ave. NW., Washington, DC 20460-0001. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566-1744, and the telephone number for the OPP Docket is (703) 305-5805. Please review the visitor instructions and additional information about the docket available at http://www.epa.gov/​dockets.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Carmen Rodia, Registration Division (7504P), Office of Pesticide Programs, Environmental Protection Agency, 1200 Pennsylvania Avenue NW., Washington, DC 20460-0001; telephone number: (703) 306-0327; email address: rodia.carmen@epa.gov.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

I. General Information

A. Does this action apply to me?

You may be potentially affected by this action if you are an agricultural producer, food manufacturer, or pesticide manufacturer. The following list of North American Industrial Classification System (NAICS) codes is not intended to be exhaustive, but rather provides a guide to help readers determine whether this document applies to them. Potentially affected entities may include:

  • Crop production (NAICS code 111).
  • Animal production (NAICS code 112).
  • Food manufacturing (NAICS code 311).
  • Pesticide manufacturing (NAICS code 32532).

B. How can I get electronic access to other related information?

You may access a frequently updated electronic version of 40 CFR part 180 through the Government Printing Office's e-CFR site at http://www.ecfr.gov/​cgi-bin/​text-idx?​&​c=​ecfr&​tpl=​/​ecfrbrowse/​Title40/​40tab_​02.tpl.

C. How can I file an objection or hearing request?

Under FFDCA section 408(g), 21 U.S.C. 346a, any person may file an objection to any aspect of this regulation and may also request a hearing on those objections. You must file your objection or request a hearing on this regulation in accordance with the instructions provided in 40 CFR part 178. To ensure proper receipt by EPA, you must identify docket ID number EPA-HQ-OPP-2011-0360 in the subject line on the first page of your submission. All objections and requests for a hearing must be in writing, and must be received by the Hearing Clerk on or before May 13, 2013. Addresses for mail and hand delivery of objections and Start Printed Page 15881hearing requests are provided in 40 CFR 178.25(b).

In addition to filing an objection or hearing request with the Hearing Clerk as described in 40 CFR part 178, please submit a copy of the filing (excluding any Confidential Business Information (CBI)) for inclusion in the public docket. Information not marked confidential pursuant to 40 CFR part 2 may be disclosed publicly by EPA without prior notice. Submit the non-CBI copy of your objection or hearing request, identified by docket ID number EPA-HQ-OPP-2011-0360, by one of the following methods:

  • Federal eRulemaking Portal: http://www.regulations.gov. Follow the online instructions for submitting comments. Do not submit electronically any information you consider to be CBI or other information whose disclosure is restricted by statute.
  • Mail: OPP Docket, Environmental Protection Agency Docket Center (EPA/DC), (28221T), 1200 Pennsylvania Ave. NW., Washington, DC 20460-0001.
  • Hand Delivery: To make special arrangements for hand delivery or delivery of boxed information, please follow the instructions at http://www.epa.gov/​dockets/​contacts.htm. Additional instructions on commenting or visiting the docket, along with more information about dockets generally, is available at http://www.epa.gov/​dockets.

II. Background

A detailed summary of the background related to EPA's extension of the time-limited interim tolerances for the combined residues of the insecticide tetrachlorvinphos, including its metabolites, in or on multiple commodities can be found in the Federal Register notices of June 8, 2011 (76 FR 33184) (FRL-8874-7); September 16, 2011 (76 FR 57657) (FRL-8887-5); and March 6, 2013 (78 FR 14487) (FRL-9380-8). The referenced documents are available in the docket established by this action, which is described under ADDRESSES. Locate and click on the hyperlink for docket ID number EPA-HQ-OPP-2011-0360. Double-click on the documents to view the referenced background summary information. There were no substantive comments received in response to the proposed rule of March 6, 2013.

III. Conclusion

For the reasons stated in the proposed rule of March 6, 2013, EPA is finalizing its proposal to extend to August 18, 2013, the expiration dates for the following tolerances listed in 40 CFR 180.252 for tetrachlorvinphos, (Z)-2-chloro-1-(2,4,5-trichlorophenyl) vinyl dimethyl phosphate, including its metabolites, 1-(2,4,5-trichlorophenyl)-ethanol (free and conjugated forms), 2,4,5-trichloroacetophenone, and 1-(2,4,5-trichlorophenyl)-ethanediol in or on: Cattle, fat (of which no more than 0.1 part per million (ppm) is tetrachlorvinphos per se) at 0.2 (ppm); cattle, kidney (of which no more than 0.05 ppm is tetrachlorvinphos per se) at 1.0 ppm; cattle, liver (of which no more than 0.05 ppm is tetrachlorvinphos per se) at 0.5 ppm; cattle, meat (of which no more than 2.0 ppm is tetrachlorvinphos per se) at 2.0 ppm; cattle, meat byproducts, except kidney and liver at 1.0 ppm; egg (of which no more than 0.05 ppm is tetrachlorvinphos per se) at 0.2 ppm; hog, fat (of which no more than 0.1 ppm is tetrachlorvinphos per se) at 0.2 ppm; hog, kidney (of which no more than 0.05 ppm is tetrachlorvinphos per se) at 1.0 ppm; hog, liver (of which no more than 0.05 ppm is tetrachlorvinphos per se) at 0.5 ppm; hog, meat (of which no more than 2.0 ppm is tetrachlorvinphos per se) at 2.0 ppm; hog, meat byproducts, except kidney and liver at 1.0 ppm; milk, fat (reflecting negligible residues in whole milk and of which no more than 0.05 ppm is tetrachlorvinphos per se) at 0.05 ppm; poultry, fat (of which no more than 7.0 ppm is tetrachlorvinphos per se) at 7.0 ppm; poultry, liver (of which no more than 0.05 ppm is tetrachlorvinphos per se) at 2.0 ppm; poultry, meat (of which no more than 3.0 ppm is tetrachlorvinphos per se) at 3.0 ppm; and poultry, meat byproducts, except liver at 2.0 ppm.

IV. Statutory and Executive Order Reviews

This final rule establishes tolerances under FFDCA section 408(e) of FFDCA. The Office of Management and Budget (OMB) has exempted these types of actions from review under Executive Order 12866, entitled “Regulatory Planning and Review” (58 FR 51735, October 4, 1993). Because this final rule has been exempted from review under Executive Order 12866, this final rule is not subject to Executive Order 13211, entitled “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001) or Executive Order 13045, entitled “Protection of Children from Environmental Health Risks and Safety Risks” (62 FR 19885, April 23, 1997). This final rule does not contain any information collections subject to OMB approval under the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.), nor does it require any special considerations under Executive Order 12898, entitled “Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations” (59 FR 7629, February 16, 1994).

In addition, under the Regulatory Flexibility Act (RFA) (5 U.S.C. 601 et seq.), the Agency previously assessed whether establishing tolerances, exemptions from tolerances, raising tolerance levels, or expanding exemptions might adversely impact small entities and concluded, as a generic matter, that there is no adverse economic impact. The factual basis for the Agency's generic certification for tolerance actions was published on May 4, 1981 (46 FR 24950), and was provided to the Chief Counsel for Advocacy of the Small Business Administration.

This final rule directly regulates growers, food processors, food handlers, and food retailers, not States or tribes, nor does this action alter the relationships or distribution of power and responsibilities established by Congress in the preemption provisions of FFDCA section 408(n)(4). As such, the Agency has determined that this action will not have a substantial direct effect on States or tribal governments, on the relationship between the national government and the States or tribal governments, or on the distribution of power and responsibilities among the various levels of government or between the Federal Government and Indian tribes. Thus, the Agency has determined that Executive Order 13132, entitled “Federalism” (64 FR 43255, August 10, 1999) and Executive Order 13175, entitled “Consultation and Coordination with Indian Tribal Governments” (65 FR 67249, November 9, 2000) do not apply to this final rule. In addition, this final rule does not impose any enforceable duty or contain any unfunded mandate as described under Title II of the Unfunded Mandates Reform Act of 1995 (UMRA) (2 U.S.C. 1501 et seq.).

This action does not involve any technical standards that would require Agency consideration of voluntary consensus standards pursuant to section 12(d) of the National Technology Transfer and Advancement Act of 1995 (NTTAA) (15 U.S.C. 272 note).

V. Congressional Review Act

Pursuant to the Congressional Review Act (5 U.S.C. 801 et seq.), EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Start Printed Page 15882Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

Start List of Subjects

List of Subjects in 40 CFR Part 180

  • Environmental protection
  • Administrative practice and procedure
  • Agricultural commodities
  • Pesticides and pests
  • Reporting and recordkeeping requirements
End List of Subjects Start Signature

Dated: February 26, 2013.

G. Jeffrey Herndon,

Acting Director, Registration Division, Office of Pesticide Programs.

End Signature

Therefore, 40 CFR chapter I is amended as follows:

Start Part

PART 180—[AMENDED]

End Part Start Amendment Part

1. The authority citation for part 180 continues to read as follows:

End Amendment Part Start Authority

Authority: 21 U.S.C. 321(q), 346a and 371.

End Authority Start Amendment Part

2. In § 180.252 revise the table in paragraph (a) to read as follows:

End Amendment Part
Tetrachlorvinphos; tolerances for residues.

(a) * * *

CommodityParts per millionExpiration/revocation date
Cattle, fat (of which no more than 0.1 ppm is tetrachlorvinphos per se)0.28/18/13
Cattle, kidney (of which no more than 0.05 ppm is tetrachlorvinphos per se)1.08/18/13
Cattle, liver (of which no more than 0.05 ppm is tetrachlorvinphos per se)0.58/18/13
Cattle, meat (of which no more than 2.0 ppm is tetrachlorvinphos per se)2.08/18/13
Cattle, meat byproducts, except kidney and liver1.08/18/13
Egg (of which no more than 0.05 ppm is tetrachlorvinphos per se)0.28/18/13
Hog, fat (of which no more than 0.1 ppm is tetrachlorvinphos per se)0.28/18/13
Hog, kidney (of which no more than 0.05 ppm is tetrachlorvinphos per se)1.08/18/13
Hog, liver (of which no more than 0.05 ppm is tetrachlorvinphos per se)0.58/18/13
Hog, meat (of which no more than 2.0 ppm is tetrachlorvinphos per se)2.08/18/13
Hog, meat byproducts, except kidney and liver1.08/18/13
Milk, fat (reflecting negligible residues in whole milk and of which no more than 0.05 ppm is tetrachlorvinphos per se)0.058/18/13
Poultry, fat (of which no more than 7.0 ppm is tetrachlorvinphos per se)7.08/18/13
Poultry, liver (of which no more than 0.05 ppm is tetrachlorvinphos per se)2.08/18/13
Poultry, meat (of which no more than 3.0 ppm is tetrachlorvinphos per se)3.08/18/13
Poultry, meat byproducts, except liver2.08/18/13
* * * * *
End Supplemental Information

[FR Doc. 2013-05814 Filed 3-12-13; 8:45 am]

BILLING CODE 6560-50-P