AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Notice of Proposed Rulemaking; correction.
SUMMARY:
This document contains corrections to the proposed rule (RM13-2-000) which was published in the
Federal Register
of Friday, February 1, 2013 (78 FR 7524). The regulations revised the
pro forma
Small Generator Interconnection Procedures (SGIP) and
pro forma
Small Generator Interconnection Agreement (SGIA) originally set forth in Order No. 2006.
DATES:
Effective on [June 3, 2013].
SUPPLEMENTARY INFORMATION:
Errata Notice
On January 17, 2013, the Commission issued an order in the above-referenced docket.
Small Generator Interconnection Agreements and Procedures,
142 FERC ¶ 61,049 (2013). The order is revised as follows:
The fourth sentence of paragraph 45 should read, “This requirement was included in Order No. 2006 62
but was not made clear in the
pro forma
SGIP.”
Footnote 62 should read, “Order No. 2006, FERC Stats. & Regs. ¶ 31,180 at P 140.”
In FR Doc. 2013-01366 appearing on page 7523 in the
Federal Register
of Friday, February 1, 2013, the same corrections are made:
1. On page 7531, the fourth sentence of paragraph 45 should read, “This requirement was included in Order No. 2006 62
but was not made clear in the
pro forma
SGIP.”
2. On page 7531, Footnote 62 should read, “Order No. 2006, FERC Stats. & Regs. ¶ 31,180 at P 140.”
Dated: April 25, 2013.
Kimberly D. Bose,
Secretary.