Skip to Content

Notice

Application for Presidential Permit; Soule River Hydroelectric Project: Correction

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Office of Electricity Delivery and Energy Reliability, DOE.

ACTION:

Notice of Application; correction.

SUMMARY:

The Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability corrects a Notice of Application published in the Federal Register (76 FR 50726) on July 30, 2013, to revise the DOE point of contact and program Web site for Docket No. PP-387.

ADDRESSES:

Comments, protests, or motions to intervene should be addressed as follows:

Christopher Lawrence, Office of Electricity Delivery and Energy Reliability (OE-20), U.S. Department of Energy, 1000 Independence Avenue SW., Washington, DC 20585.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Christopher Lawrence (Program Office) at 202-586-5260 or via electronic mail at Christopher.Lawrence@hq.doe.gov or Katherine L. Konieczny (Attorney-Adviser) at 202-586-0503 or via electronic mail at Katherine.Konieczny@hq.doe.gov.

Procedural Matters: Copies of this application will be made available, upon request, for public inspection and copying at the address provided above, by accessing the program Web site at http://energy.gov/​oe/​services/​electricity-policy-coordination-and-implementation/​international-electricity-regulatio-2, or by emailing Angela Troy at angela.troy@hq.doe.gov.

Start Signature

Issued in Washington, DC, on August 5, 2013.

Brian Mills,

Director, Permitting and Siting, Office of Electricity Delivery and Energy Reliability.

End Signature End Further Info End Preamble

[FR Doc. 2013-19311 Filed 8-8-13; 8:45 am]

BILLING CODE 6450-01-P