Skip to Content

Notice

Notice Announcing Workshop; Zero Rate Reactive Power Rate Schedules

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

Concurrent with this notice, the Commission is issuing an order in Chehalis Power Generating, L.P., Docket No. ER05-1056-007 clarifying its policy related to jurisdictional reactive power rate schedules.[1] In that order, the Commission finds that, on a prospective basis, for any jurisdictional reactive power service (including within-the-deadband reactive power service) provided by both new and existing generators, the rates, terms, and conditions for such service must be pursuant to a rate schedule on file with the Commission, even when that rate schedule provides no compensation for such service. As set forth in that order, the Commission directed staff to conduct a workshop, in a generic proceeding, to explore the mechanics of public utilities filing reactive power rate schedules for which there is no compensation.

Take notice that the Commission intends to hold a staff-led workshop open to the public at a time and date to be announced to explore the process for filing reactive power rate schedules for which there is no compensation. A subsequent notice will be issued in this docket setting forth the details of the workshop.

Start Signature

Dated: October 17, 2013.

Kimberly D. Bose,

Secretary.

End Signature End Preamble

Footnotes

1.  Chehalis Power Generating, L.P., 145 FERC ¶ 61,052 (2013).

Back to Citation

[FR Doc. 2013-24740 Filed 10-22-13; 8:45 am]

BILLING CODE 6717-01-P