Skip to Content

Notice

Notice of Correction on the Draft Environmental Impact Statement for the Four Corners Power Plant and Navajo Mine Energy Project

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Office of Surface Mining Reclamation and Enforcement (OSMRE), Interior.

ACTION:

Notice; correction.

SUMMARY:

On March 28, 2014 (79 FR 17569), OSMRE published a notice of availability (NOA) for the Four Corners Power Plant and Navajo Mine Energy Project draft environmental impact statement (DEIS). The DEIS included a copy of the United States Army Corps of Engineers (USACE) Preliminary Draft Permit Evaluation (Appendix C of the DEIS) with Attachments A through D omitted. OSMRE updated the online DEIS found at http://www.wrcc.osmre.gov/​initiatives/​fourCorners.shtm on May 2, 2014 to include the omitted Attachments A through D, and the USACE mailed Attachments A through D on May 5, 2014 to DEIS repositories identified in the March 28, 2014 (79 FR 17569) NOA for inclusion.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Marcelo Calle, 303-293-5035.

Start Signature

Dated: May 16, 2014.

Joseph G. Pizarchik,

Director.

End Signature End Further Info End Preamble

[FR Doc. 2014-11898 Filed 5-22-14; 8:45 am]

BILLING CODE 4310-05-P