This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Office of the Assistant Secretary for Water and Science; Notice of Availability of the Final Environmental Impact Statement for the Provo River Delta Restoration Project
The Joint Lead Agencies will not make a decision on the proposed action until at least 30 days after the release of the FEIS. After the 30-day waiting period, The Department of the Interior and the Utah Reclamation Mitigation and Conservation Commission will each complete a separate Record of Decision. These documents will state the action that will be implemented and will discuss all factors leading to the decision.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
65
as of
08/10/2026 at 4:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2015-08035 as it appeared on Public Inspection on
04/07/2015 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2015-08035 (80 FR 18940)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Central Utah Project Completion Act, Interior; Utah Reclamation Mitigation and Conservation Commission.
ACTION:
Notice.
SUMMARY:
The Department of the Interior, Utah Reclamation Mitigation and Conservation Commission, and the Central Utah Water Conservancy District, as Joint Lead Agencies, have prepared and made available to the public a Final Environmental Impact Statement (FEIS) that discloses the effects of the Provo River Delta Restoration Project (Project) which is a recovery action within the approved June Sucker Recovery Plan of 1999.
DATES:
The Joint Lead Agencies will not make a decision on the proposed action until at least 30 days after the release of the FEIS. After the 30-day waiting period, The Department of the Interior and the Utah Reclamation Mitigation and Conservation Commission will each complete a separate Record of Decision. These documents will state the action that will be implemented and will discuss all factors leading to the decision.
ADDRESSES:
Send written correspondence or requests for copies to Mr. Richard Mingo, Utah Reclamation Mitigation and Conservation Commission, 230 South 500 East Suite 230, Salt Lake City, UT 84102; or by email to
rmingo@usbr.gov.
The FEIS is accessible at the following Web sites:
www.cupcao.gov, www.provoriverdelta.us, www.mitigationcommission.gov, and www.cuwcd.com.
See the
SUPPLEMENTARY INFORMATION
section for locations where copies of the FEIS are available for public review.
FOR FURTHER INFORMATION CONTACT:
Mr. Richard Mingo, 801-524-3146; or by email to
rmingo@usbr.gov.
SUPPLEMENTARY INFORMATION:
Background
The Department of the Interior's Record of Decision for the Diamond Fork System Final Supplement to the Diamond Fork Power System Final Environmental Impact Statement, signed September 29, 1999, commits the Joint Lead Agencies to “. . . participate in the development of a Recovery Implementation Program for June sucker.” Moreover, “. . . [a]ny future development of the Bonneville Unit of CUP [Central Utah Project] will be contingent on the RIP [June Sucker Recovery Implementation Program (JSRIP)] making `sufficient progress' towards recovery of June sucker.” The Utah Reclamation Mitigation and Conservation Commission signed its own Record of Decision for the Diamond Fork System Project on November 19, 1999. The JSRIP was established in 2002, and the Joint Lead Agencies are participants. The goals of the JSRIP are to recover June sucker so that it no longer requires protection under the Endangered Species Act and allow continued operation of existing water facilities and future development of water resources for human uses within the Utah Lake Basin in Utah.
The June sucker exists naturally only in Utah Lake and spawns primarily in the lower Provo River, a Utah Lake tributary. Monitoring indicates young June sucker hatching in the lower Provo River do not survive to the adult stage due to habitat inadequacies in the lower Provo River and its interface with Utah Lake related to flow, food supply, and shelter. A compounding factor is likely predation by nonnative fishes. Dredging and channelization for flood control has eliminated the shallow, warm, complex wetland habitat at the mouth of the Provo River where it enters Utah Lake.
Proposed Federal Action
The Project would restore the lower Provo River to a more natural deltaic ecosystem. The delta and associated habitat would provide needed habitat for the recovery of the endangered June sucker. These improvements would be accomplished through the implementation of one or any combination of the action alternatives and/or options analyzed in the FEIS.
Purpose and Need for Action
The Project has been identified as an essential action needed to recover the endangered June sucker. It would restore functional habitat conditions in the lower Provo River and its interface with Utah Lake that are needed for spawning, hatching, larval transport, survival, rearing and recruitment of young into the population on a self-sustaining basis.
The purposes of the Project are to:
Implement the specific criteria of the June Sucker Recovery Plan to restore a naturally functioning Provo River delta ecosystem essential for recruitment of June sucker;
provide recreational improvements and opportunities associated with the Project;
adopt flow regime targets for the lower Provo River and provide delivery of supplemental water to the lower Provo River, including additional conserved water.
The FEIS describes and analyzes the potential effects of three action alternatives, a no action alternative, and two options for the existing Provo River channel.
No Action Alternative
This alternative considers the consequences of taking “no action” with respect to the purpose and need of the Project. Under the No Action Alternative, the planned Project would not be implemented, but remaining actions in the June Sucker Recovery Plan and JSRIP would proceed as planned, subject to National Environmental Policy Act compliance as appropriate. Private lands would not be acquired for the Project.
Alternative A
Alternative A would maximize the available rearing and spawning habitat for June sucker. The acquisition boundary for this alternative encompasses 507.3 acres.
Alternative B—Agency Preferred Alternative
Alternative B was developed with substantial involvement from study area landowners and other stakeholders. It is the agency preferred alternative. It would reduce the amount of private land required for the Project and preserve the highest-value agricultural land, while still meeting June sucker spawning and rearing habitat improvement needs. The acquisition boundary for this alternative encompasses 310.3 acres.
Alternative C
Alternative C would exclude most of the existing peat wetlands located on the east and north sides of the Project area from restoration activities but, as a consequence, would be constructed on the higher-value agricultural lands. Alternative C would meet June sucker spawning and rearing habitat improvement needs for the Project by using lands to the south of these wetlands. The acquisition boundary for this alternative encompasses 298.3 acres.
( printed page 18941)
Existing Provo River Channel Options
Two options were considered for use of the existing Provo River Channel. Either of the two options could be paired with any of the three action alternatives. Option 1 would leave the existing Provo River Channel open to Utah Lake, allowing for fluctuating water levels at various times of the year. Option 2 would maintain the existing channel at a relatively constant elevation by constructing a small dam at the downstream mouth of the channel near Utah Lake State Park. Under both options, an aeration system would be installed and operated to improve water quality and a minimum flow of 10 cubic feet per second would be provided to the existing Provo River channel which would be retained and managed for recreational and aesthetic purposes.
A Notice of Availability of the Draft Environmental Impact Statement (DEIS) was published in the
Federal Register
on February 28, 2014 (79 FR 11511). The comment period on the DEIS ended on April 29, 2014. The FEIS contains responses to all comments received and reflects comments and any additional information received during the review period.
Copies of the FEIS are available for public review at:
Department of the Interior, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606-7317
Utah Reclamation Mitigation and Conservation Commission, 230 South 500 East Suite 230, Salt Lake City, Utah 84102
Central Utah Water Conservancy District, 355 West University Parkway, Orem, Utah 84058-7303
Libraries
Provo City Public Library, 550 North University Avenue, Provo, Utah 84601
Salt Lake City Public Library, 210 East 400 South, Salt Lake City, Utah 84111
Dated: March 10, 2015.
Reed R. Murray,
Program Director, Central Utah Project Completion Act Office, Department of the Interior.
Dated: March 10, 2015.
Michael C. Weland,
Executive Director, Utah Reclamation Mitigation and Conservation Commission.