This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Submit comments by May 23, 2016. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Draft interim staff guidance; request for comment.
Guidance for Closure of Activities Related to Recommendation 2.1, Flooding Hazard Reevaluation
Public Comments
Enhanced Content - Public Comments
Comments are no longer being accepted.
See DATES for details.
2 comments have
been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold,
certain submissions (or portions thereof). Submitted comments may not be
available to be read until the agency has approved them.
Docket Title
Document ID
Comments
Guidance for Closure of Activities Related to Recommendation 2.1, Flooding Hazard Reevaluation
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Guidance for Closure of Activities Related to Recommendation 2.1, Flooding Hazard Reevaluation
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
98
as of
07/15/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2016-09421 as it appeared on Public Inspection on
04/21/2016 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2016-09421 (81 FR 23758)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Draft interim staff guidance; request for comment.
SUMMARY:
The U.S. Nuclear Regulatory Commission (NRC) is soliciting public comment on its draft Japan Lessons-Learned Division Interim Staff Guidance (JLD-ISG), JLD-ISG-2016-01, “Guidance for Activities Related to Near-Term Task Force Recommendation 2.1, Flooding Hazard Reevaluation; Focused Evaluation and Integrated Assessment.” This draft JLD-ISG revision provides guidance and clarification to assist operating power reactor respondents and holders of construction permits under the NRC's regulations with the performance of the focused evaluations and revised integrated assessments for external flooding.
DATES:
Submit comments by May 23, 2016. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
ADDRESSES:
You may submit comments by any of the following methods (unless
( printed page 23759)
this document describes a different method for submitting comments on a specific subject):
Federal Rulemaking Web site:
Go to
http://www.regulations.gov
and search for Docket ID NRC-2016-0084. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; email:
Carol.Gallagher@nrc.gov.
For technical questions, contact the individual listed in the
FOR FURTHER INFORMATION CONTACT
section of this document.
Mail comments to:
Cindy Bladey, Office of Administration, Mail Stop: OWFN-12-H08, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting comments, see “Obtaining Information and Submitting Comments” in the
SUPPLEMENTARY INFORMATION
section of this document.
FOR FURTHER INFORMATION CONTACT:
Eric Bowman, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2963; email:
Eric.Bowman@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2016-0084 when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:
NRC's Agencywide Documents Access and Management System (ADAMS):
You may obtain publicly-available documents online in the ADAMS Public Documents collection at
http://www.nrc.gov/reading-rm/adams.html.
To begin the search, select “
ADAMS Public Documents”
and then select “
Begin Web-based ADAMS Search.”
For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to
pdr.resource@nrc.gov.
The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in the
SUPPLEMENTARY INFORMATION
section. For the convenience of the reader, the ADAMS accession numbers for obtaining materials referenced in this document are provided in a table in the section of this notice entitled, Availability of Documents.
NRC's PDR:
You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
B. Submitting Comments
Please include Docket ID NRC-2016-0084 in your comment submission.
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC posts all comment submissions at
http://www.regulations.gov
as well as entering the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS.
II. Background
Following the events at the Fukushima Dai-ichi nuclear power plant on March 11, 2011, the NRC established a senior-level agency task force referred to as the Near-Term Task Force (NTTF). The NTTF was tasked with conducting a systematic and methodical review of the NRC regulations and processes, and determining if the agency should make additional improvements to these programs in light of the events at Fukushima Dai-ichi. As a result of this review, the NTTF developed a comprehensive set of recommendations, documented in SECY-11-0093, “Recommendations for Enhancing Reactor Safety in the 21st Century, the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,” dated July 12, 2011. These recommendations were enhanced by the NRC staff following interactions with stakeholders. Documentation of the staff's efforts is contained in SECY-11-0124, dated September 9, 2011, and SECY-11-0137, dated October 3, 2011.
As directed by the Commission's SRM for SECY-11-0093, the NRC staff reviewed the NTTF recommendations within the context of the NRC's existing regulatory framework and considered the various regulatory vehicles available to the NRC to implement the recommendations. In SECY-11-0124 and SECY-11-0137, the staff established the prioritization of the recommendations. After receiving the Commission's direction in SRM-SECY-11-0124 and SRM-SECY-11-0137, the NRC staff issued a request for information pursuant to section 50.54(f) of title 10 of the
Code of Federal Regulations
(10 CFR), “Conditions of licenses,” on March 12, 2012, requesting licensees to reevaluate the seismic and flooding hazards at their sites using updated hazard information and current regulatory guidance and methodologies. For plants where the reevaluated hazard exceeds the plant's design basis, the licensee was to conduct an integrated assessment. The information gathering is considered to be Phase 1 and was requested to support Phase 2 decision-making and determine whether available or planned measures provide sufficient protection and mitigation capabilities or if further regulatory action should be pursued in the areas of seismic and flooding design, and emergency preparedness.
In COMSECY-14-0037, dated November 21, 2014, the NRC staff requested that the Commission review and approve changes to revise the Recommendation 2.1 flooding assessments and integrate the Phase 2 decision-making into the development and implementation of mitigating strategies in accordance with Order EA-12-049 and the related Mitigation of Beyond-Design-Basis Events rulemaking.
In SRM-COMSECY-14-0037, the Commission disapproved this recommendation. Instead, the Commission instructed the staff to develop a closure plan for the flooding reevaluation activities and to reassess the existing guidance for performing a Phase 1 integrated assessment in order to focus on those plants with the most potential for safety benefits.
In COMSECY-15-0019, the staff provided revised guidance for performing a Phase 1 integrated assessment and described a modified process for identifying the list of plants that would be required to perform an integrated assessment. The process proposed by the staff included the development of a graded, risk-informed and performance-based approach consistent with Commission direction to focus on those plants with the greatest potential need for safety enhancements. Specifically, the process included consideration and evaluation of local intense precipitation by performing a focused evaluation of the impact of the
( printed page 23760)
hazard and implementing any necessary programmatic, procedural, or plant modifications to address the hazard, taking into account available warning time. The process also considered flood protection and available physical margin, where licensees will confirm the capability of existing flood protection to address the hazard exceedance by performing a focused evaluation. For licensees where the reevaluated hazard cannot be addressed via existing or planned flood protection, the process also includes the performance of an integrated assessment, using revised guidance, in order to conduct more detailed evaluations of plant response capability. This revised integrated assessment will capture, among other information, quantitative characteristics about the reliability of various aspects of plant response (
e.g.,
reliability of equipment and manual actions), and risk insights with a focus on cliff-edge effects. The results will be used by the NRC to determine whether additional regulatory action, such as a plant-specific backfit, are warranted.
In SRM-COMSECY-15-0019, the Commission approved the staff's plans to modify the approach for integrated assessments to implement a graded approach for determining the need for, and prioritization and scope of, plant-specific integrated assessments. As discussed in COMSECY-15-0019, the majority of sites with reevaluated flooding hazards exceeding the design-basis flood are expected to screen out from the integrated assessment process. The licensees will instead provide focused evaluations to ensure appropriate actions are taken and that these actions are effective and reasonable.
The Nuclear Energy Institute (NEI) submitted guidance NEI 16-05, “External Flooding Assessment Guidelines,” Revision 0, on April 12, 2016. The guidance is an industry-developed methodology that describes the flooding impact assessment process, which is intended to meet the requested information of an integrated assessment, as described in the document titled, “Request for Information Pursuant to Title 10 of the
Code of Federal Regulations
(10 CFR) 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,” and to incorporate the changes described in COMSECY-15-0019.
Draft ISG JLD ISG 2016-01 is being issued to describe to stakeholders methods acceptable to the staff for performance of the focused evaluations and revised integrated assessments and describe some exceptions and clarifications to NEI 16-05, Revision 0.
This guidance is not intended for use in design-basis applications or in regulatory activities beyond the scope of performing the focused evaluations and integrated assessment part of NTTF Recommendation 2.1 flooding activities. This ISG is being issued in draft form for public comment to involve the public in development of the implementation guidance. Compliance with the ISG is not required.
III. Availability of Documents
The documents identified in the following table are available to interested persons through one or more of the following methods, as indicated.
Document title
ADAMS
accession No.
Request for Information Pursuant to Title 10 of the
Code of Federal Regulations
(10 CFR) 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012
ML12053A340
SECY-11-0093, “Recommendations for Enhancing Reactor Safety in the 21st Century, the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,” dated July 12, 2011
ML11186A950
Commission's staff requirements memorandum (SRM) for SECY-11-0093, dated August 19, 2011
ML112310021
SECY-11-0124, “Recommended Actions to be Taken Without Delay from the Near-Term Task Force Report,” dated September 9, 2011
ML11245A158
SRM-SECY-11-0124, dated October 18, 2011
ML112911571
SECY-11-0137, “Prioritization of Recommended Actions to be Taken in Response to Fukushima Lessons Learned,” dated October 3, 2011
ML11272A111
SRM-SECY-11-0137, dated December 15, 2011
ML113490055
COMSECY-14-0037, “Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluaton (sic) of Flooding Hazards,” dated November 21, 2014
ML14238A616
SRM-COMSECY-14-0037, dated March 30, 2015
ML15089A236
COMSECY-15-0019, “Closure Plan for the Reevaluation of Flooding Hazards for Operating Nuclear Power Plants,” dated June 30, 2015
ML15153A104
SRM-COMSECY-15-0019, dated July 28, 2015
ML15209A682
NEI 16-05, “External Flooding Assessment Guidelines,” Rev. 0, dated April 12, 2016
ML16105A327
Draft JLD-ISG-2016-01 “Guidance For Activities Related To Near-Term Task Force Recommendation 2.1, Flooding Hazard Reevaluation; Focused Evaluation and Integrated Assessment,” Revision 0
ML16090A140
The NRC may post materials related to this document, including public comments, on the Federal rulemaking Web site at
http://www.regulations.gov
under Docket ID NRC-2016-0084. The Federal rulemaking Web site allows you to receive alerts when changes or additions occur in a docket folder. To subscribe: (1) Navigate to the docket folder (NRC-2016-0084); (2) click the “Sign up for Email Alerts” link; and (3) enter your email address and select how frequently you would like to receive emails (daily, weekly, or monthly).
Proposed Action
By this action, the NRC is requesting public comments on draft ISG JLD-ISG-2016-01. This draft JLD-ISG proposes guidance related to the performance of a focused evaluation and integrated assessment as part of NTTF 2.1 flooding activities. The NRC staff will make a final determination regarding issuance of the JLD-ISG after it considers any public comments received in response to this request.
Dated at Rockville, Maryland, this 15th day of April, 2016.
For the Nuclear Regulatory Commission.
Gregory Bowman,
Acting Director, Japan Lessons-Learned Division, Office of Nuclear Reactor Regulation.
2 comments have been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold, certain submissions (or portions thereof). Submitted comments may not be available to be read until the agency has approved them.