This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Comments and information must be received no later than November 1, 2017.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
79
as of
11/16/2026 at 12:15 pm EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2017-21072 as it appeared on Public Inspection on
09/29/2017 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2017-21072 (82 FR 45828)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce.
ACTION:
Notice; receipt of application for letter of authorization; request for comments and information.
SUMMARY:
NMFS has received a request from the U.S. Navy (Navy) for authorization to take, by harassment, of marine mammals incidental to conducting pier construction at the Navy Submarine Base New London in Groton, Connecticut, beginning October 2018 and ending March 2022. Pursuant to the implementing regulations of the Marine Mammal Protection Act (MMPA), NMFS is announcing our receipt of the Navy's request for regulations governing the incidental taking of marine mammals and inviting information, suggestions, and comments on the Navy's application and request.
DATES:
Comments and information must be received no later than November 1, 2017.
ADDRESSES:
Comments on the application should be addressed to Jolie Harrison, Chief, Permits, Conservation and Education Division, Office of Protected Resources, National Marine Fisheries Service, 1315 East-West Highway, Silver Spring, MD 20910-3225. The mailbox address for providing email comments is
ITP.guan@noaa.gov.
Instructions:
NMFS is not responsible for email comments sent to addresses other than the one provided here. Comments sent via email, including all attachments, must not exceed a 10-megabyte file size. All comments received are a part of the public record and will generally be posted to
www.nmfs.noaa.gov/pr/permits/incidental/construction.htm
without change. All Personal Identifying Information (for example, name, address, etc.) voluntarily submitted by the commenter may be publicly accessible. Do not submit Confidential Business Information or otherwise sensitive or protected information.
FOR FURTHER INFORMATION CONTACT:
Shane Guan, Office of Protected Resources, NMFS, (301) 427-8401.
Sections 101(a)(5)(A) and (D) of the Marine Mammal Protection Act of 1972, as amended (MMPA; 16 U.S.C. 1361et seq.) direct the Secretary of Commerce (Secretary) to allow, upon request, the incidental, but not intentional taking of marine mammals by U.S. citizens who engage in a specified activity (other than commercial fishing) if certain findings are made and regulations are issued or, if the taking is limited to harassment, notice of a proposed authorization is provided to the public for review.
Authorization for incidental takings shall be granted if NMFS finds that the taking will have a negligible impact on the species or stock(s), will not have an unmitigable adverse impact on the availability of the species or stock(s) for subsistence uses (where relevant), and if the permissible methods of taking and requirements pertaining to the mitigation, monitoring and reporting of such taking are set forth.
NMFS has defined “negligible impact” in 50 CFR 216.103 as an impact resulting from the specified activity that cannot be reasonably expected to, and is not reasonably likely to, adversely affect the species or stock through effects on annual rates of recruitment or survival.
Except with respect to certain activities not pertinent here, the MMPA defines “harassment” as any act of pursuit, torment, or annoyance which (i) has the potential to injure a marine mammal or marine mammal stock in the wild (Level A harassment); or (ii) has the potential to disturb a marine mammal or marine mammal stock in the wild by causing disruption of behavioral patterns, including, but not limited to, migration, breathing, nursing, breeding, feeding, or sheltering (Level B harassment).
The use of sound sources such as those described in the application (
e.g.,
pile driving) may result in the take of marine mammals through disruption of behavioral patterns or may cause auditory injury of marine mammals. Therefore, incidental take authorization under the MMPA is warranted.
Summary of Request
On March 22, 2017, NMFS received an application from the Navy requesting authorization to take a small number of harbor and gray seals, by Level A and Level B harassment, incidental to noise exposure resulting from conducting pier construction activities at the Navy Submarine Base New London in Groton, Connecticut, from October 2018 to March 2022. On August 31, 2017, NMFS deemed the application adequate and complete.
Description of the Specified Activity
The proposed Submarine Base New London pier construction includes construction of the new Pier 32 and the demolishing of the existing Pier 32 and Pier 10. Structural support piles for Pier 32 would consist of approximately 120 concrete-filled steel pipe piles measuring 36 inches in diameter. The piles would be driven between 40 feet (ft) below the mudline near the shore and 150 ft below the mudline at the end of the pier. Fender piles would also be installed and would consist of approximately 194 fiberglass-reinforced plastic piles measuring 16 inches in diameter. Demolition of existing Pier 32 would include the removal by vibratory driver-extractor (hammer) of approximately 60 steel piles from the temporary work trestle, 120 concrete-encased steel H-piles, and 70 steel H-piles. Fifty-six wood piles would be pulled with a sling. Demolition of Pier 10 would include the removal by vibratory hammer of 24 concrete-encased, steel H-piles and 166 cast-in-place, reinforced concrete piles. Eight-four steel fender piles and 41 wood piles would be pulled with a sling. A total of 440 piles would be removed by vibratory hammer for both piers and the work trestle.
The in-water construction and demolition activities are anticipated to begin in October 2018 and take approximately 35 non-consecutive months to complete. However, the rule will cover a five-year period to encompass additional time should delays occur.
A suite of proposed mitigation and monitoring measures for marine mammals that could potentially be taken during in-water construction activities includes: (1) Establishing and monitoring Level A and Level B zones with protected species observers (PSOs), (2) establishing a 10-m shutdown and implementing shutdown measures with an animal is detected to approach the shutdown zone, and (3) limiting pile driving and pile removal activities during daylight hours only.
Information Solicited
Interested persons may submit information, suggestions, and comments concerning the Navy's request (see
ADDRESSES
). NMFS will consider all information, suggestions, and comments related to the Navy's request and NMFS' potential development and implementation of regulations governing the incidental taking of marine mammals by the Navy's Submarine Base New London pier construction.
Dated: September 27, 2017.
Donna S. Wieting,
Director, Office of Protected Resources, National Marine Fisheries Service.