This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
A public meeting for the DEIS will be held on Thursday, August 9th, 2018, from 4:00 p.m. to 7:00 p.m., Pacific Time (PT). Interested parties are encouraged to attend and provide written comments on the DEIS. The comment period for the DEIS ends Friday, August 31, 2018. After this date, GSA will prepare the Final EIS.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of Availability and Announcement of Meeting for the Draft Environmental Impact Statement for the Otay Mesa Port of Entry, San Diego, California; Correction.
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
63
as of
10/17/2026 at 10:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2018-17211 as it appeared on Public Inspection on
08/09/2018 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2018-17211 (83 FR 39753)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Public Building Service (PBS), General Services Administration (GSA).
ACTION:
Notice of availability; announcement of meeting.
SUMMARY:
This notice announces the availability of the Draft Environmental Impact Statement (DEIS), which examines the potential impacts of a proposal by the General Services Administration (GSA) to modernize and expand the existing Otay Mesa Land Port of Entry (LPOE) located at the United States (U.S.)-Mexico border in the City of San Diego community of Otay Mesa, in San Diego County, California. The DEIS describes the reason the project is being proposed, the alternatives being considered, the potential impacts of each of the alternatives on the existing environment, and avoidance, minimization, and/or mitigation measures.
As the lead agency in this undertaking, GSA is acting on behalf of its major tenant at this facility, the Department of Homeland Security's (DHS) Customs and Border Protection (CBP).
DATES:
A public meeting for the DEIS will be held on Thursday, August 9th, 2018, from 4:00 p.m. to 7:00 p.m., Pacific Time (PT). Interested parties are encouraged to attend and provide written comments on the DEIS. The comment period for the DEIS ends Friday, August 31, 2018. After this date, GSA will prepare the Final EIS.
ADDRESSES:
The meeting will be held at the Holiday Inn Express and Suites San Diego, 2296 Niels Bohr Court, San Diego, CA, 92154, telephone 619-710-0900.
Osmahn A. Kadri, NEPA Project Manager, GSA, at 415-522-3617. Please also call this number if special assistance is needed to attend and participate in the public meeting.
SUPPLEMENTARY INFORMATION:
Background
The Otay Mesa LPOE is located approximately 17 miles southeast of downtown San Diego, just north of the U.S. border and the Baja California Peninsula of Mexico. When it was constructed in 1983, its primary purpose was to divert growing commercial truck traffic from the increasingly busy San Ysidro LPOE to the west, at the southern terminus of Interstate 5. The Otay Mesa LPOE processes commercial and privately-owned vehicle and pedestrian traffic. Since the LPOE opened, vehicle and pedestrian traffic and the population and general development in the area have grown. It is now one of the ten busiest land ports in the country and is the busiest commercial port on the California-Mexico border, processing the second highest volume of trucks, and third highest dollar volume of trade among all U.S.-Mexico LPOEs. Ever-increasing traffic loads and new security initiatives require increased capacity and new inspection technology to be installed and implemented at existing facilities.
The Project's purpose is to improve the efficiency, effectiveness, security and safety at the existing Otay Mesa LPOE. The Project's need, or the need to which the GSA is responding, is to increase the LPOE's capacity due to increased demand, and to address public and employee safety and border security concerns.
The DEIS considers two “action” alternatives and one “no action” alternative. The Preferred Alternative would include the development of an approximately 10-acre GSA-owned plot of land to the immediate east of the existing commercial import lot. The new lot would be used to construct commercial inspection buildings and additional commercial import lanes. It would also include improvements to existing pedestrian lanes and personal vehicle inspection lanes; relocation of personnel currently housed in the Pedestrian, Commercial Import and Commercial Export buildings; renovation of existing facilities throughout the Otay Mesa LPOE; and demolition of facilities that would no longer be needed would also occur. New construction would include commercial import and exit booths, six additional pedestrian lanes in the Pedestrian Building, a Commercial Annex Building (CAB), a return-to-Mexico lane for commercial traffic, a pedestrian ramp and parking areas for the new commercial lot. Building renovations would include the installation of energy conservation measures and water conservation measures across the Otay Mesa LPOE, the correction of deficiencies throughout existing facilities (
e.g.,
updating security systems, updating HVAC systems, improving lighting and repaving old asphalt surfaces), and refurbishing the interiors of the pedestrian, commercial import and commercial export buildings including repainting and replacing flooring.
The Reduced Build Alternative would include many of the same activities as under the Preferred Alternative; however, the overall activity level would be lower. Notably, no new construction would occur on the 10-acre GSA-owned plot of land, and the Commercial Annex Building would not be constructed; instead, the plot of land would be paved and used as additional space for the commercial vehicle inspection booths which would be reconfigured to increase traffic flow. Renovation of existing facilities would still occur, but activities would be limited to updating security and HVAC systems and repainting interiors.
The No Action alternative assumes that modernization and expansion of the existing LPOE would not occur and that a new facility would not be constructed adjacent to the existing LPOE. The LPOE would continue to operate under current conditions.
Public Meeting
The meeting will be conducted in an open house format, where project information will be presented and distributed. Comments must be received by August 31, 2018, and emailed to
osmahn.kadri@gsa.gov
or sent to the address listed above.
Dated: August 2, 2018.
Matthew Jear,
Director, Portfolio Management Division, Pacific Rim Region, Public Buildings Service.