Skip to Content

Notice

Rescinding the Notice of Intent for an Environmental Impact Statement; Multiple Counties, Alabama

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Federal Highway Administration (FHWA), DOT.

ACTION:

Rescind Notice of Intent.

SUMMARY:

The FHWA is issuing this notice to advise the public that the 2005 Notice of Intent (NOI) published in the Start Printed Page 44121 Federal Register for Federal-aid project NCPD-PE02(910), the I-85 Extension, in multiple counties in Alabama is being rescinded. A final environmental impact statement (EIS) will not be prepared for this project.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Mr. Mark D. Bartlett, Division Administrator, Federal Highway Administration, 9500 Wynlakes Place, Montgomery, Alabama 36117; Email: mark.bartlett@dot.gov; Telephone: (334) 274-6350.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

The FHWA, in cooperation with the Alabama Department of Transportation, is rescinding the NOI to prepare an EIS for Federal-aid project NCPD-PE02(910). The proposed project was to construct a multi-lane, limited access roadway to provide a connecting link in the freeway/Interstate system between Interstate 59/Interstate 20 (I-59/I-20) near the Mississippi state line and I-85 in Montgomery, Alabama. The study area included large parts of six Black Belt Counties (Dallas, Hale, Lowndes, Marengo, Perry, and Sumter), as well as Autauga and Montgomery Counties.

The NOI for the project was published in the Federal Register on September 20, 2005. A draft EIS was released in April 2010. The FHWA has determined, in conjunction with ALDOT, the NOI for the project shall be rescinded due to changes in economic projections and the lack of available funding. ALDOT has reassessed the needs and timing for the completion of this project and indefinitely postponed development.

Any future Federal-aid actions within this corridor will comply with environmental review requirements of the National Environmental Policy Act (NEPA, 42 U.S.C. 4321, et seq.), FHWA environmental regulations (23 CFR 771) and related authorities, as appropriate.

Start Authority

Authority: 23 U.S.C. 315; 49 CFR 1.48.

End Authority

(Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program.)

Start Signature

Issued on: August 20, 2018.

Mark Bartlett,

Division Administrator, Federal Highway Administration, Montgomery, Alabama.

End Signature End Supplemental Information

[FR Doc. 2018-18670 Filed 8-28-18; 8:45 am]

BILLING CODE 4910-22-P