This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Notice of Availability of a Draft Supplemental Environmental Impact Statement for the New U.S. Land Port of Entry in Madawaska, Maine and Madawaska-Edmundston International Bridge Project
The GSA, FHWA, and MaineDOT will host a public hearing on Wednesday, December 12, 2018.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of Availability of a Draft Supplemental Environmental Impact Statement for the New U.S. Land Port of Entry in Madawaska, Maine and Madawaska-Edmundston International Bridge Project
11/27/2018
Notice of availability for the Record of Decision of the FDA Headquarters Master Plan Environmental Impact Statement.
Notice of Availability and Announcement of Meeting for the Draft Environmental Impact Statement for the Otay Mesa Port of Entry, San Diego, California; Correction.
Notice of GSA Bulletin FTR 22-04, extended waiver of certain federal travel regulation (FTR) provisions during the Coronavirus disease 2019 (COVID-19) pandemic.
Notice of Availability of a Draft Supplemental Environmental Impact Statement for the New U.S. Land Port of Entry in Madawaska, Maine and Madawaska-Edmundston International Bridge Project
11/27/2018
Notice of availability for the Record of Decision of the FDA Headquarters Master Plan Environmental Impact Statement.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
370
as of
10/12/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2018-26125 as it appeared on Public Inspection on
11/30/2018 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2018-26125 (83 FR 62322)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Public Buildings Service (PBS), General Services Administration (GSA); Federal Highway Administration (FHWA); Maine Department of Transportation (MaineDOT).
ACTION:
Notice of availability.
SUMMARY:
Pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality Regulations, the GSA Public Buildings Service NEPA Desk Guide, and the FHWA Policy Guide, GSA, PBS, the Federal Highway Administration (FHWA), and MaineDOT, in cooperation with the U.S. Coast Guard and in coordination with the U.S. Customs and Border Protection (CBP), announce the availability of a Draft Supplemental Environmental Impact Statement (DSEIS) assessing the potential impacts of a proposed new U.S. Land Port of Entry (LPOE) in Madawaska, Maine and an International Bridge project between Madawaska and Edmundston, New Brunswick, Canada (the “Proposed Action”).
DATES:
The GSA, FHWA, and MaineDOT will host a public hearing on Wednesday, December 12, 2018.
ADDRESSES:
Madawaska High School gymnasium at 135 7th Avenue, Madawaska, Maine 04756, at 6:30 p.m. EST (Eastern Standard Time). The evening of the public hearing will consist of an open house to view displays beginning at 6:00 p.m., a brief presentation beginning at 6:30 p.m., followed by an opportunity to provide comments on the contents of the DSEIS. Interested parties are encouraged to attend and provide written comments by Thursday, January 31, 2019.
Written comments can be submitted by the following methods:
Regulations.gov: http://www.regulations.gov (http://www.regulations.gov). Submit comments via the Federal eRulemaking portal by searching the Notice number or “New U.S. Land Port of Entry in Madawaska, Maine and Madawaska-Edmundston International Bridge Project.” Select the link “Comment Now” that corresponds with “Notice of Availability of a Draft Supplemental Environmental Impact Statement for the New U.S. Land Port of Entry in Madawaska, Maine and Madawaska-Edmundston International Bridge Project” on your attached document.
Postal Mail or Email:
Ms. Alexas Kelly, Project Manager, GSA, 10 Causeway Street, 11th Floor, Boston, MA 02222, or
alexandria.kelly@gsa.gov.
Postal Mail:
Ms. Cheryl Martin, Assistant Division Administrator, FHWA, Edmund S. Muskie Federal Building, 40 Western Avenue, Room 614, Augusta, ME 04330.
FOR FURTHER INFORMATION CONTACT:
Alexas Kelly, Project Manager, GSA, New England Region, by phone at 617-549-8190 or by email at
alexandria.kelly@gsa.gov. Please also call this number if special assistance is needed to attend and participate in the public hearing.
The purpose of the project is to provide for the long-term safe and efficient flow of current and projected traffic volumes, including the movement of goods and people between Edmundston, New Brunswick and Madawaska, Maine. The need is that (1) the existing International Bridge is nearing the end of its useful life, and (2) the existing Madawaska Land Port of Entry is substandard, inhibiting the agencies assigned to the Port from adequately fulfilling their respective missions.
The existing Madawaska-Edmundston International Bridge, opened in 1921, and its design life has been exceeded. Notable bridge deficiencies are (1) substandard roadway width and clearance, (2) foundation susceptible to undermining, (3) piers cracked and deteriorated, (4) significant steel corrosion, (5) bridge capacity is insufficient, and (6) deficiencies prompting the bridge posting on October 27, 2017, from 50 tons to 5 tons.
A Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) were published in January 2007, which addressed the construction of a new Madawaska LPOE.
Built in 1959, the current LPOE suffers from facility, operational and site deficiencies, and does not meet current CBP mission and operational requirements for an LPOE. A few noted deficiencies: (1) Lack of office and inspection areas, (2) deficient inbound and outbound passenger and commercial processing areas, (3) inadequate queuing space for vehicles, and (4) inability to meet the Architectural Barriers Act. In furtherance of the LPOE Project, GSA previously acquired approximately nine acres of land but did not commence construction.
A Supplemental Environmental Impact Statement (SEIS) is needed due to a change in circumstance, specifically the decision by MaineDOT and New Brunswick Department of Transportation and Infrastructure (NBDTI) to initiate the Madawaska-Edmundston International Bridge project. The SEIS will address changes to the Proposed Action, including an updated design in accordance with current GSA and CBP requirements, and options for rehabilitation or replacement of the International Bridge (the totality of which may require additional land acquisition).
The Proposed Action consists of replacing the existing International Bridge and the existing Madawaska LPOE to improve safety, security, and functionality.
The new LPOE would consist of a main administration building and support building with parking, circulation and processing areas. The new LPOE would be designed in accordance with the requirements and criteria of the GSA and CBP to provide facilities adequate for fulfilling the agencies' respective missions. Portions of Mill Street and Main Street adjacent to the LPOE may be reconstructed or re-profiled to provide smooth ingress and egress to the LPOE. The Proposed Action may include the demolition of the existing LPOE.
The Proposed Action may include the demolition of the existing International Bridge.
This DSEIS evaluates a no action alternative and several build alternatives for the LPOE and International Bridge. No alternative has been identified as the preferred alternative. However, a preferred location for the new LPOE and a preferred corridor for a new International Bridge have been selected. A no-build alternative is being studied that evaluates the consequences of not constructing the new International Bridge and LPOE. This alternative is included to provide a basis for comparison to the action alternatives described above as required by the NEPA regulations (40 CFR 1002.14(d)).
The GSA, FHWA, and MaineDOT invite individuals, organizations, and agencies to submit comments concerning the content and findings of the DSEIS. The public comment period starts with the publication of this notice in the
Federal Register
and will continue until January 31, 2019. The GSA, FHWA, and MaineDOT will consider and respond to comments received on the DSEIS in preparing the Final SEIS. The GSA, FHWA and MaineDOT expect to issue the Final SEIS by spring 2019, at which time its availability will be announced in the
Federal Register
and local media.
Dated: November 21, 2018.
Drew Dilks,
Project Management Branch Chief, Design and Construction, Public Buildings Service.