Skip to Content

Rule

Streamlining Electric Program Procedures

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Enhanced Content

Relevant information about this document from Regulations.gov provides additional context. This information is not part of the official Federal Register document.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 37059

AGENCY:

Rural Utilities Service, USDA.

ACTION:

Correcting amendment.

SUMMARY:

The Rural Utilities Service (RUS or Agency) published a final rule in the Federal Register on July 9, 2019, entitled “Streamlining Electric Program Procedures,” to make revisions to several regulations to streamline its procedures for Electric Program borrowers, including its loan application requirements, approval of work plans and load forecasts, use of approved contracts and system design procedures. The Agency found an error in this publication, after the published rule became effective. This document will correct the final regulation.

DATES:

Effective on July 31, 2019.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Michele Brooks, Team Lead, Rural Development Innovation Center—Regulatory Team, USDA, 1400 Independence Avenue SW, Stop 1522, Room 4266, South Building, Washington, DC 20250-1522. Telephone: (202) 690-1078. Email michele.brooks@wdc.usda.gov.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Need for Correction

On July 9, 2019 (84 FR 32607), the Rural Utilities Services (RUS) issued a final rule entitled “Streamlining Electric Program Procedures,” to revise several regulations to streamline its procedures for Electric Program borrowers, including its loan application requirements, approval of work plans and load forecasts, use of approved contracts and system design procedures.

Inadvertently, revisions were made to the entire paragraph (c) of section 1717.856, which resulted in eliminating paragraphs (c)(1) through (4) instead of revising the introductory text only of paragraph (c). This document corrects the final regulation to add those portions that were removed by mistake.

Start List of Subjects

List of Subject in 7 CFR Part 1717

  • Administrative practice and procedure
  • Electric power
  • Electric power rates
  • Electric Utilities
  • Intergovernmental relations
  • Investments
  • Loan program-energy
  • Reporting and recordkeeping requirements
  • Rural areas
End List of Subjects Start Part

PART 1717—POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS

End Part Start Amendment Part

1. The authority citation for part 1717 continues to read as follows:

End Amendment Part Start Authority

Authority: 7 U.S.C. 901 et seq., 1921 et seq., 6941 et seq.

End Authority

Subpart R—Lien Accommodations and Subordinations for 100 Percent Private Financing

Start Amendment Part

2. Amend § 1717.856 by adding paragraph (c)(1) through (c)(4), to read as follows:

End Amendment Part
Application contents: Normal review—100 percent private financing.
* * * * *

(c) * * *

(1) The borrower is current on all of its financial obligations and is in compliance with all requirements of its mortgage and loan agreement with RUS;

(2) In RUS's judgment, granting a lien accommodation or subordination for the proposed loan will not adversely affect the repayment and security of outstanding debt of the borrower owed to or guaranteed by RUS;

(3) The borrower has achieved the TIER and DSC and any other coverage ratios required by its mortgage or loan contract in each of the two most recent calendar years; and

(4) The amount of the proposed loan does not exceed the lesser of $10 million or 10 percent of the borrower's current net utility plant;

* * * * *
Start Signature

Chad Rupe,

Administrator, Rural Utilities Service.

End Signature End Supplemental Information

[FR Doc. 2019-15859 Filed 7-30-19; 8:45 am]