This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Effective date: The effective date of September 19, 2019, for the direct final rule published May 22, 2019 (84 FR 23439), is confirmed.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
276
as of
10/06/2026 at 6:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2019-17588 as it appeared on Public Inspection on
08/15/2019 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2019-17588 (84 FR 41885)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Direct final rule; confirmation of effective date.
SUMMARY:
The U.S. Nuclear Regulatory Commission (NRC) is confirming the effective date of September 19, 2019, for the direct final rule that was published in the
Federal Register
on May 22, 2019. This direct final rule amended NRC's regulations to certify the Advanced Power Reactor 1400 standard
( printed page 41886)
design so that applicants or licensees intending to construct and operate an Advanced Power Reactor 1400 standard design may do so by referencing the design certification rule.
DATES:
Effective date:
The effective date of September 19, 2019, for the direct final rule published May 22, 2019 (84 FR 23439), is confirmed.
ADDRESSES:
Please refer to Docket ID NRC-2015-0224 when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:
Federal Rulemaking Website:
Go to
https://www.regulations.gov
and search for Docket ID NRC-2015-0224. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; email:
Carol.Gallagher@nrc.gov.
For technical questions contact the individuals listed in the
FOR FURTHER INFORMATION CONTACT
section of this document.
NRC's Agencywide Documents Access and Management System (ADAMS):
You may obtain publicly-available documents online in the ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/adams.html.
To begin the search, select “
Begin Web-based ADAMS Search.”
For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email to
pdr.resource@nrc.gov.
NRC's PDR:
You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT:
Yanely Malave-Velez, Office of Nuclear Material Safety and Safeguards, telephone: 301-415-1519, email:
Yanely.Malave@nrc.gov
or William Ward, Office of New Reactors, telephone: 301-415-7038, email:
William.Ward@nrc.gov.
Both are staff of the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
On May 22, 2019 (84 FR 23439), the NRC published a direct final rule amending its regulations in part 52 of title 10 of the
Code of Federal Regulations,
“Domestic Licensing of Production and Utilization Facilities,” to certify the APR1400 standard design so that applicants or licensees intending to construct and operate an APR1400 design may do so by referencing the design certification rule. In the direct final rule, the NRC stated that if no significant adverse comments were received, the direct final rule would become effective on September 19, 2019. The NRC received one comment on the direct final rule from Jeffrey A. Ciocco, available in ADAMS under Accession No. ML19176A175.
The comment was in favor of the design certification and determined to not be significant and adverse. Because no significant adverse comments were received, the direct final rule will become effective as scheduled.
Paperwork Reduction Act Statement
The direct final rule contains a new or amended collection of information subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501et seq.). On July 2, 2019, NRC submitted the collection of information (3150-0236) to the Office of Management and Budget for review and approval. NRC will publish a separate notice in the
Federal Register
with the effective date of the information collection.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
Dated at Rockville, Maryland, this 12th day of August 2019.
For the Nuclear Regulatory Commission.
Cindy Bladey,
Chief, Regulatory Analysis and Rulemaking Support Branch, Division of Rulemaking, Office of Nuclear Material Safety and Safeguards.