This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
There is no table of contents available for this document.
Related Documents
Enhanced Content - Related Documents
FederalRegister.gov uses the agency dockets published with the document to display related documents.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
143
as of
09/11/2026 at 4:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2019-26759 as it appeared on Public Inspection on
12/11/2019 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2019-26759 (84 FR 67940)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Putnam Expansion Project, proposed by Florida Gas Transmission Company, LLC (Florida Gas) in the above-referenced docket. Florida Gas requests authorization to provide 169,000 million British thermal units per day (MMBtu/d) of natural gas to subscribed Project shippers. Florida Gas also requests approval to upgrade facilities at Compressor Station 18 to increase reliability to existing shippers. The Project includes modifications to existing facilities and installation of new pipeline loops in Columbia, Union, Putnam, Clay, and Orange counties, Florida.
The EA assesses the potential environmental effects of the construction and operation of the Putnam Expansion Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment.
The Putnam Expansion Project would consist of the following facilities in Florida:
West Loop
—install 13.7 miles of 30-inch-diameter pipeline loop [1]
in Columbia and Union Counties;
East Loop
—install 7.0 miles of 30-inch-diameter pipeline loop in Clay and Putnam Counties;
Columbia/Union Receiver Station Relocation
—remove and relocate the existing 30-inch-diameter loop pig receiver located at the beginning of the West Loop in Columbia County to a new pig receiver station to be installed at the terminus of the West Loop in Union County;
Clay/Putnam Receiver Station Relocation
—remove and relocate the existing 30-inch-diateter loop pig receiver located at the beginning of the East Loop in Clay County to a new pig receiver station to be installed at the terminus of the East Loop in Putnam County;
Compressor Station (CS) 18
—install new automated valves, over pressure protection device, and station piping at Florida Gas's existing CS 18 in Orange County, Florida.
The Commission mailed a copy of the
Notice of Availability
to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. The EA is only available in electronic format. It may be viewed and downloaded from the FERC's website (
www.ferc.gov), on the Environmental Documents page (
https://www.ferc.gov/industries/gas/enviro/eis.asp). In addition, the EA may be accessed by using the eLibrary link on the FERC's website. Click on the eLibrary link (
https://www.ferc.gov/docs-filing/elibrary.asp), click on General Search, and enter the docket number in the Docket Number field, excluding the last three digits (
i.e.
CP19-474). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov
or toll free at (866) 208-3676, or for TTY, contact (202) 502-8659.
Any person wishing to comment on the EA may do so. Your comments should focus on the EA's disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before 5:00 p.m. Eastern Time on January 6, 2020.
For your convenience, there are three methods you can use to file your comments to the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208-3676 or
FercOnlineSupport@ferc.gov.
Please carefully follow these instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment feature on the Commission's website (
www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project;
(2) You can also file your comments electronically using the eFiling feature on the Commission's website (
www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on eRegister. You must select the type of filing you are making. If you
( printed page 67941)
are filing a comment on a particular project, please select “Comment on a Filing”; or
(3) You can file a paper copy of your comments by mailing them to the following address. Be sure to reference the project docket number (CP19-474-000) with your submission: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission's Rules of Practice and Procedures (18 CFR 385.214). Motions to intervene are more fully described at
http://www.ferc.gov/resources/guides/how-to/intervene.asp.
Only intervenors have the right to seek rehearing or judicial review of the Commission's decision. The Commission may grant affected landowners and others with environmental concerns intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered.
Additional information about the project is available from the Commission's Office of External Affairs, at (866) 208-FERC, or on the FERC website (
www.ferc.gov) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to
www.ferc.gov/docs-filing/esubscription.asp.
Dated: December 6, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Footnotes
1.
A pipeline loop is a segment of pipe constructed parallel to an existing pipeline to increase capacity. A “pig” is a tool that the pipeline company inserts into and pushes through the pipeline for cleaning the pipeline, conducting internal inspections, or other purposes.