This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Record of Decision of the Supplemental Environmental Impact Statement for the Proposed Master Plan Amendment 2 of the Consolidation of the U.S. Department of Homeland Security Headquarters at the St. Elizabeths West Campus
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of GSA Bulletin FMR B-51, Annual Executive Agency Reports on Exchange/Sale and Personal Property Furnished to Non-Federal Recipients, Supersession and Cancellation of GSA Bulletin FMR B-27.
Record of Decision of the Supplemental Environmental Impact Statement for the Proposed Master Plan Amendment 2 of the Consolidation of the U.S. Department of Homeland Security Headquarters at the St. Elizabeths West Campus
Record of Decision of the Supplemental Environmental Impact Statement for the Proposed Master Plan Amendment 2 of the Consolidation of the U.S. Department of Homeland Security Headquarters at the St. Elizabeths West Campus
Public Comments
Enhanced Content - Public Comments
This feature is not available for this document.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
Additional information is not currently available for this document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
119
as of
07/22/2026 at 4:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2020-22605 as it appeared on Public Inspection on
10/09/2020 at 8:45 am.
It was viewed
2
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2020-22605 (85 FR 64466)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Public Buildings Service, National Capital Region, General Services Administration (GSA).
ACTION:
Notice.
SUMMARY:
GSA issued a Record of Decision (ROD) for the 2020 Master Plan Amendment 2 for the Consolidation of the U.S. Department of Homeland Security (DHS) at the St. Elizabeths West Campus, located in Southeast, Washington, DC, on October 9, 2020. The ROD was prepared in accordance with the National Environmental Policy Act (NEPA) of 1969, the Council on Environmental Quality Regulations, and the GSA Public Buildings Service NEPA Desk Guide.
Paul Gyamfi, GSA, National Capital Region, Public Buildings Service, Office of Planning and Design Quality, at 202-440-3405, or by email at
paul.gyamfi@gsa.gov.
SUPPLEMENTARY INFORMATION:
Background
One of the principal missions of GSA is to provide secure office space for Federal agencies throughout the United States, including the Washington, DC, metropolitan area. GSA obtained control of the St. Elizabeths West Campus in Southeast, Washington, DC, in 2004, in anticipation of meeting a portion of the need for secure Federal office space in the National Capital Region (NCR). On June 7, 2005, GSA published a Notice of Intent (NOI), and on June 28, 2007, a revised NOI, to prepare an Environmental Impact Statement (EIS) in compliance with the National Environmental Policy Act of 1969 (NEPA) for the proposed redevelopment of the St. Elizabeths West Campus.
GSA issued a Record of Decision (ROD) for the 2008 Final Master Plan EIS on December 16, 2008, selecting the alternative that consolidated 4.5 million gross square feet of secure office and shared-use space and associated parking on both the West and East Campuses at St. Elizabeths. As part of the 2008 Final Master Plan EIS for this action, GSA also assessed, on a programmatic level, the impacts of constructing 750,000 gross square feet of office space and associated parking on the St. Elizabeths East Campus. GSA noted in its ROD that an EIS tiered to the 2008 Final Master Plan EIS would be prepared for the East Campus.
On November 19, 2018, GSA published an NOI to prepare an EIS for St. Elizabeths Master Plan Amendment 2, which eliminates development on the East Campus and re-evaluates development on the St. Elizabeths West Campus to accommodate 4.1 million gross square feet of secure office and shared-use space, and 1.6 million gross square feet of associated parking, for the DHS Headquarters consolidation. The Master Plan Amendment 2 Draft SEIS was issued for a 70-day public comment period on May 8, 2020 and the Master Plan Amendment 2 Final SEIS was issued for a 30-day public review on August 28, 2020.
Comments received during public review of the Master Plan Amendment 2 Final EIS are provided in Appendix A along with GSA's responses
Preferred Alternative
GSA has chosen to implement Alternative B as defined in the Master Plan Amendment 2 Final Environmental Impact Statement (EIS), issued August 2020. This decision is based on analyses contained in the Master Plan Amendment 2 Draft EIS issued in May 2020, the Master Plan Amendment 2 Final EIS issued in August 2020, the Programmatic Agreement executed in December 2008, the Memorandum of Agreement executed on September 29, 2020, and the comments of Federal and state agencies, stakeholder organizations, members of the public, and elected officials.
Alternative B includes the addition of 1.2 million gross square feet of office space in two separate office structures organized around two enclosed courtyards on the plateau site at the West Campus. The new office buildings will range from three to eight stories, and the largest part of the structures will have an east-west orientation to optimize the use of daylight. The courtyards will be secured to provide open space for building occupants. Building B1 will be stepped down into the ravine near Building 56/57 to stabilize the slope in that area. Building 56/57 will be integrated into the design of Building B1 to provide a connection between the historic and new construction. Buildings 52 and 64 will be retained, rehabilitated, and adaptively reused.
Alternative B also includes the addition of 175,000 gross square feet of office space on the Sweetgum Lane site (proposed Building C1), organized into primarily below-grade construction, with one two-story building constructed to mirror the northwest corner of the Munro Building. The building would include up to three below-grade levels, which would take advantage of the site slope from east to west, allowing the western edge of the building to receive daylight. A central courtyard would provide internal daylighting.
Alternative B will also consist of the following:
An additional 1,014 employee parking spaces added to the previously proposed underground parking garages at Gates 1 and 2 on the east side of the West Campus;
Demolition of Buildings 60, 66, 67, 68, and 69, which total 65,295 gross square feet of space, at the plateau site;
Demolition of Building 15, which totals 2,749 gross square feet of space, at the Sweetgum Lane site;
Sidewalks and walkways, including enhanced pedestrian connections at the ravine;
Engineering for stabilization of steep slopes, including building foundations;
Realignment of site drainages and incorporation of landscaping and stormwater management;
Shuttle bus drop-off locations;
Shipping/receiving areas for buildings;
( printed page 64467)
Electric power, communications, and utility corridors designed for buildings and site improvements; and
Remediation of contaminated soils.
Kristi Tunstall Williams,
Deputy Director, Office of Planning and Design Quality, Public Buildings Service, National Capital Region, General Services Administration.