Beaver Valley Power Station, Units 1 and 2 |
Docket Nos. 50-334 and 50-412 |
Beaver Valley Power Station, Units 1 and 2 -Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 28, 2020 | ML20303A213. |
Beaver Valley Power Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0171 [COVID-19]), dated December 15, 2020 | ML20324A089. |
Braidwood Station, Units 1 and 2 |
Docket Nos. 50-456 and 50-457 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Braidwood Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0198) [COVID-19], dated December 10, 2020 | ML20322A338. |
Start Printed Page 5271 |
Braidwood Station, Units 1 and 2 |
Docket Nos. 50-456 and 50-457 |
Braidwood Station, Units 1 and 2—COVID-19 Related Request for Exemption from 10 CFR part 26 Work Hours Requirements, dated November 17, 2020 | ML20323A008. |
Braidwood Station, Units 1 and 2—Response to Request for Additional Information Related to Exemption from 10 CFR part 26 Requirements, dated November 23, 2020 | ML20328A215. |
Braidwood Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0207 [COVID-19]), dated December 1, 2020 | ML20324A002. |
Browns Ferry Nuclear Plant, Units 1, 2, and 3 |
Docket Nos. 50-259, 50-260, and 50-296 |
Browns Ferry Nuclear Power Plant, Units 1, 2, and 3—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 8, 2020 | ML20343A214. |
Browns Ferry Nuclear Plant, Units 1, 2, and 3—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0233 [COVID-19]), dated December 15, 2020 | ML20343A363. |
Brunswick Steam Electric Plant, Units 1 and 2 |
Docket Nos. 50-325 and 50-324 |
Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 19, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Brunswick Steam Electric Plant, Units 1 and 2 Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0180 [COVID-19]), dated December 17, 2020 | ML20338A329. |
Byron Station, Unit Nos. 1 and 2 |
Docket Nos. 50-454 and 50-455 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Byron Station, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3(l)(1) (EPID L-2020-LLE-0199) [COVID-19], dated December 10, 2020 | ML20323A393. |
Byron Station, Unit Nos. 1 and 2 |
Docket Nos. 50-454 and 50-455 |
Byron Station, Unit Nos. 1 and 2—Subsequent Request for Exemption from 10 CFR part 26 Work Hours Requirements, dated November 24, 2020 | ML20329A533. |
Byron Station, Unit Nos. 1 and 2—Response to Request for Additional Information Related to Subsequent Exemption from 10 CFR part 26 Requirements, dated December 1, 2020 | ML20336A341. |
Byron Station, Unit Nos. 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0218 [COVID-19]), dated December 2, 2020 | ML20332A017. |
Calvert Cliffs Nuclear Power Plant, Units 1 and 2 |
Docket Nos. 50-317 and 50-318 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | ML20318A288. |
Calvert Cliffs Nuclear Power Plant, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3(l)(1) (EPID L-2020-LLE-0194 [COVID-19]), dated December 11, 2020 | ML20321A243. |
Catawba Nuclear Station, Units 1 and 2 |
Docket Nos. 50-413 and 50-414 |
Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1), Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 19, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Catawba Nuclear Station, Units 1 and 2—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0180 [COVID-19]), dated December 17, 2020 | ML20337A128. |
Start Printed Page 5272 |
Clinton Power Station, Unit No. 1 |
Docket No. 50-461 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Clinton Power Station, Unit No. 1—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3(l)(1) (EPID L-2020-LLE-0200 [COVID-19]), dated December 11, 2020 | ML20323A434. |
Clinton Power Station, Unit No. 1 |
Docket No. 50-461 |
Clinton Power Station, Unit No. 1—COVID-19 Related Request for Exemption from 10 CFR part 26 Work Hours Requirements, dated December 3, 2020 | ML20339A318. |
Clinton Power Station, Unit No. 1—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0232 [COVID-19]), dated December 16, 2020 | ML20339A538. |
Columbia Generating Station |
Docket No. 50-397 |
Columbia Generating Station—Exemption Request from 10 CFR part 50, appendix E due to COVID-19 Pandemic, dated October 29, 2020 | ML20303A348. |
Columbia Generating Station—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0173 [COVID-19]), dated December 17, 2020 | ML20336A183. |
Columbia Generating Station |
Docket No. 50-397 |
Columbia Generating Station—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) regarding Annual Force-On-Force Exercises due to COVID-19 Pandemic, dated October 29, 2020 | ML20303A286. |
Columbia Generating Station—Response to Request for Additional Information Related to Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises due to COVID-19, dated December 3, 2020 | ML20338A541. |
Columbia Generating Station—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0172 [COVID-19]), dated December 17, 2020 | ML20342A211. |
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 |
Docket Nos. 50-445 and 50-446 |
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(l) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 10, 2020 | ML20345A341. |
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2—Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0235 [COVID-19]), dated December 22, 2020 | ML20350B666. |
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 |
Docket Nos. 50-445 and 50-446 |
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2—Request for Exemption from Specific Requirements of 10 CFR part 26, “Fitness for Duty Programs,” dated December 11, 2020 | ML20346A565. |
Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2—Supplement to Request for Exemption from Specific Requirements of 10 CFR part 26, “Fitness for Duty Programs,” dated December 15, 2020 | ML20350B830. |
Comanche Peak, Unit Nos. 1 and 2—Exemption from Selection from Requirements of 10 CFR part 26 (EPID L-2020-LLE-0236 [COVID-19]), dated December 16, 2020 | ML20349A038. |
Cooper Nuclear Station |
Docket No. 50-298 |
Cooper Nuclear Station—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 27, 2020 | ML20309A663. |
Cooper Nuclear Station—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0178 [COVID-19]), dated December 11, 2020 | ML20323A237. |
Start Printed Page 5273 |
Davis-Besse Nuclear Power Station, Unit No. 1 |
Docket No. 50-346 |
Davis-Besse Nuclear Power Station, Unit No. 1—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 29, 2020 | ML20304A046. |
Davis-Besse Nuclear Power Station, Unit No. 1—Response to Request for Additional Information Regarding Request for Exemption—10 CFR part 73 Force-on-Force Exercises (EPID L-2020-LLE-0175), dated December 7, 2020 | ML20342A199. |
Davis-Besse Nuclear Power Station, Unit No. 1—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0175 [COVID-19]), dated December 15, 2020 | ML20345A205. |
Diablo Canyon Nuclear Power Plant, Units 1 and 2 |
Docket Nos. 50-275 and 50-323 |
Diablo Canyon Nuclear Power Plant, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 14, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Diablo Canyon Nuclear Power Plant, Units 1 and 2—Response to Request for Additional Information Regarding Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 3, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Diablo Canyon Nuclear Power Plant, Units 1 and 2—Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0166 [COVID-19]), dated December 17, 2020 | ML20346A024. |
Diablo Canyon Nuclear Power Plant, Units 1 and 2 |
Docket Nos. 50-275 and 50-323 |
Diablo Canyon Power Plant, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection F.5.(a) Regarding Firearms Requalification due to COVID-19 Pandemic, dated October 14, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Diablo Canyon Nuclear Power Plant, Units 1 and 2—Response to Request for Additional Information Regarding Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection F.5.(a) Regarding Firearms Requalification due to COVID-19 Pandemic, dated December 3, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Diablo Canyon Nuclear Power Plant, Units 1 and 2—Exemption from Annual Firearms Tactical Qualification Course Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.F.5.(a) (EPID L-2020-LLE-0167 [COVID-19]), dated December 18, 2020 | ML20346A120. |
Donald C. Cook Nuclear Plant, Units Nos. 1 and 2 |
Docket Nos. 50-315 and 50-316 |
Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 | ML20318A034. |
Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2—Exemption from Certain Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” section VI (EPID L-2020-LLE-0182 [COVID-19]), dated December 8, 2020 | ML20324A003. |
Donald C. Cook Nuclear Plant, Units Nos. 1 and 2 |
Docket Nos. 50-315 and 50-316 |
Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR 26.205(d) due to COVID-19 Pandemic, dated November 30, 2020 | ML20338A324. |
Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0221 [COVID-19]), dated December 3, 2020 | ML20336A111. |
Dresden Nuclear Power Station, Units 2 and 3 |
Docket Nos. 50-237 and 50-249 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Dresden Nuclear Power Station, Units 2 and 3—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0203 [COVID-19]), dated December 14, 2020 | ML20322A303. |
Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2 |
Docket Nos. 50-321 and 50-366 |
Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 6, 2020 | ML20311A662. |
Start Printed Page 5274 |
Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0215 [COVID-19]), dated December 4, 2020 | ML20329A488. |
Fermi-2 |
Docket No. 50-341 |
Fermi-2—Request for One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Pandemic, dated November 12, 2020 | ML20317A203. |
Fermi-2—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0188 [COVID-19]), dated December 8, 2020 | ML20332A179. |
Fermi-2 |
Docket No. 50-341 |
Fermi-2—Request for Exemption from the Annual Force-on-Force Training Requirements of 10 CFR part 73, appendix B, section VI due to the COVID-19 Public Health Emergency, dated November 13, 2020 | ML20318A383. |
Fermi-2—Response to Request for Additional Information Regarding Exemption from the Annual Force-on-Force Training Requirements of 10 CFR part 73, appendix B, section VI due to the COVID-19 Public Health Emergency, dated December 3, 2020 | ML20338A333. |
Fermi-2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0204 [COVID-19]), dated December 18, 2020 | ML20343A350. |
Hope Creek Generating Station |
Docket No. 50-354 |
Salem Nuclear Generating Station, Unit Nos. 1 and 2 |
Docket Nos. 50-272 and 50-311 |
Hope Creek Generating Station and Salem Generating Station, Units Nos. 1 and 2—Exemption Request from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Pandemic, dated October 13, 2020 | ML20287A628. |
Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2—Temporary Exemption from the Exercise Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0164 [COVID-19]), dated December 7, 2020 | ML20315A434. |
Hope Creek Generating Station |
Docket No. 50-354 |
Salem Nuclear Generating Station, Unit Nos. 1 and 2 |
Docket Nos. 50-272 and 50-311 |
Hope Creek Generating Station and Salem Generating Station, Unit Nos. 1 and 2—Request for Exemption from Specific Requirements of 10 CFR part 26, “Fitness for Duty Programs,” dated December 23, 2020 | ML20358A186. |
Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0239 [COVID-19]), dated December 28, 2020 | ML20358A281. |
Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3 |
Docket Nos. 50-003, 50-247, and 50-286 |
Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3—One-time Scheduler Exemption Request from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Public Health Emergency, dated October 8, 2020 | ML20282A612. |
Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3—Supplement to One-Time Exemption Request from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements” (EPID L-2020-LLE-0160 [COVID-19]), dated November 12, 2020 | ML20317A344. |
Indian Point Nuclear Generating Station, Unit Nos. 1, 2, and 3—Temporary Exemption from Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F.2.B (EPID L-2020-LLE-0160 [COVID-19]), dated December 8, 2020 | ML20320A000. |
Indian Point Nuclear Generating Unit Nos. 2 and 3 |
Docket Nos. 50-247 and 50-286 |
Indian Point Nuclear Generating Unit Nos. and 3—Request for a One-Time Exemption from 10 CFR 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to COVID 19 Pandemic, dated November 12, 2020 | ML20317A299. |
Indian Point Nuclear Generating Unit Nos. 2 and 3—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0189 [COVID-19]), dated December 14, 2020 | ML20321A121. |
Start Printed Page 5275 |
James A. FitzPatrick Nuclear Power Plant |
Docket No. 50-333 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | ML20318A288. |
James A. Fitzpatrick Nuclear Power Plant—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0197 [COVID 19]), dated December 8, 2020 | ML20337A004. |
Joseph M. Farley Nuclear Plant, Units 1 and 2 |
Docket Nos. 50-348 and 50-364 |
Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 6, 2020 | ML20311A662. |
Joseph M. Farley Nuclear Plant, Units 1 and 2—Exemption from Certain Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI C.3.(I)(1) (EPID L-2020-LLE-0183 [COVID-19]), dated December 4, 2020 | ML20315A374. |
H. B. Robinson Steam Electric Plant, Unit No. 2 |
Docket No. 50-261 |
Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 19, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
H. B. Robinson Steam Electric Plant, Unit No. 2—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1), dated December 17, 2020 | ML20339A521. |
LaSalle County Station, Units 1 and 2 |
Docket Nos. 50-373 and 50-374 |
LaSalle County Station, Units 1 and 2—Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR part 50, appendix E, section IV.F.2.b, dated November 23, 2020 | ML20328A292. |
LaSalle County Station, Units 1 and 2—Supplemental Information Regarding Request for Exemption from the Biennial Emergency Preparedness Exercise Requirements of 10 CFR part 50, appendix E, section IV.F.2.b, dated December 7, 2020 | ML20342A259. |
LaSalle County Station, Units 1 and 2—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F.2.b (EPID-L-2020-LLE-0223 [COVID-19]), dated December 18, 2020 | ML20346A014. |
LaSalle County Station, Units 1 and 2 |
Docket Nos. 50-373 and 50-374 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
LaSalle County Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3(l)(1) (EPID L-2020-LLE-0191 [COVID-19]), dated December 9, 2020 | ML20324A104. |
LaSalle County Station, Units 1 and 2 |
Docket Nos. 50-373 and 50-374 |
LaSalle County Station, Units 1 and 2- COVID-19 Related Request for Exemption from 10 CFR part 26 Work Hours Requirements, dated November 24, 2020 | ML20329A301. |
LaSalle County Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0217 [COVID-19]), dated December 1, 2020 | ML20330A326. |
Limerick Generating Station, Units 1 and 2 |
Docket Nos. 50-352 and 50-353 |
Exelon Generation—Limerick Generating Station, Units 1 and 2—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | ML20318A288. |
Limerick Generating Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0201 [COVID-19]), dated December 10, 2020 | ML20330A295. |
Start Printed Page 5276 |
McGuire Nuclear Station, Unit Nos. 1 and 2 |
Docket Nos. 50-369 and 50-370 |
Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 19, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
McGuire Nuclear Station, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0180) [COVID-19], dated December 9, 2020 | ML20330A321. |
Millstone Power Station, Unit Nos. 1, 2, and 3 |
Docket Nos. 50-245, 50-336, and 50-423 |
Millstone Power Station, Unit Nos. 1, 2, and 3—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-On-Force Exercises due to COVID-19 Pandemic, dated December 3, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Millstone Power Station, Unit Nos. 1, 2, and 3—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0227 [COVID-19]), dated December 16, 2020 | ML20338A552. |
Monticello Nuclear Generating Plant |
Docket No. 50-263 |
Monticello and Prairie Island—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3(l)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 30, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Response to Request for Additional Information Regarding Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3(l)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 14, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Monticello Nuclear Generating Plant—Exemption from Certain Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0174 [COVID-19]), dated December 22, 2020 | ML20317A136. |
Nine Mile Point Nuclear Station, Units 1 and 2 |
Docket Nos. 50-220 and 50-410 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | ML20318A288. |
Nine Mile Point Nuclear Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0195 [COVID-19]), dated December 14, 2020 | ML20321A290. |
North Anna Power Station, Unit Nos. 1 and 2 |
Docket Nos. 50-338 and 50-339 |
North Anna Power Station, Unit Nos. 1 and 2—Request for One-Time Schedular Exemption from Offsite Biennial Emergency Preparedness Exercise Requirement in 10 CFR part 50, appendix E, section IV.F.2.c, dated November 10, 2020 | ML20317A162. |
North Anna Power Station, Unit Nos. 1 and 2—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F.2.C (EPID L-2020-LLE-0184 [COVID-19]), dated December 8, 2020 | ML20324A222. |
North Anna Power Station, Unit Nos. 1 and 2 |
Docket Nos. 50-338 and 50-339 |
North Anna Power Station, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises due to COVID-19 Pandemic, dated December 3, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
North Anna Power Station, Units Nos. 1 and 2—Exemption from Annual Force-On Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0231 [COVID-19]), dated December 15, 2020 | ML20342A293. |
Oconee Nuclear Station, Units 1, 2, and 3 |
Docket Nos. 50-269, 50-270, and 50-287 |
Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 19, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Start Printed Page 5277 |
Oconee Nuclear Station, Units 1, 2, and 3—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0180 [COVID-19]), dated December 17, 2020 | ML20344A004. |
Oregon State University |
Docket No. 50-243 |
Oregon State University—Extension of Timeframe Required to Complete Biennial Emergency Exercise per Oregon State TRIGA Reactor Emergency Response Plan, dated November 3, 2020 | ML20318A035. |
Oregon State University—Extension of Timeframe required to Complete Biennial Emergency Exercise per Oregon State TRIGA Reactor Emergency Response Plan, dated December 10, 2020 | ML20350B726. |
Oregon State University—Temporary Exemption from the Requirements of 10 CFR part 50, appendix E, section IV.F.2.b Related to Biennial Emergency Exercise [COVID-19], dated December 18, 2020 | ML20318A380. |
Palisades Nuclear Plant |
Docket No. 50-255 |
Palisades Nuclear Plant—Request for One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Pandemic, dated September 30, 2020 | ML20275A110. |
Palisades Nuclear Plant—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F (EPID L-2020-LLE-0155 [COVID-19]), dated December 9, 2020 | ML20308A607. |
Palisades Nuclear Plant |
Docket No. 50-255 |
Palisades Nuclear Plant—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 12, 2020 | ML20317A300. |
Palisades Nuclear Plant—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0190 [COVID-19]), dated December 3, 2020 | ML20330A000. |
Palo Verde Nuclear Generating Station, Units 1, 2, and 3 |
Docket Nos. 50-528, 50-529, 50-530 |
Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation—Subsequent Request for Exemption from Specific Requirements of 10 CFR part 26, “Fitness for Duty Programs,” dated December 21, 2020 | ML20356A292. |
Palo Verde Nuclear Generating Station, Units 1, 2, and 3—Subsequent Request for Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0238 [COVID-19]), dated December 23, 2020 | ML20357A055. |
Peach Bottom Atomic Power Station, Units 2 and 3 |
Docket Nos. 50-277 and 50-278 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | ML20318A288. |
Peach Bottom Atomic Power Station, Units 2 and 3—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0192 [COVID-19]), dated December 10, 2020 | ML20325A017. |
Perry Nuclear Power Plant, Unit No. 1 |
Docket No. 50-440 |
Perry Nuclear Power Plant, Unit No. 1—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 29, 2020 | ML20304A191. |
Perry Nuclear Power Plant, Unit No. 1—Response to Request for Additional Information Regarding Request for Exemption—10 CFR part 73 Force-on-Force Exercises (EPID L-2020-LLE-0176), dated November 25, 2020 | ML20335A531. |
Perry Nuclear Power Plant, Unit No. 1—Exemption from Certain Requirements of 10 CFR part 73, appendix B, section VI.C.3.(I)(1) Re: Annual Force-on-Force Exercise for CY 2020 (EPID L-2020-LLE-0176 [COVID-19]), dated December 14, 2020 | ML20309A135. |
Point Beach Nuclear Plant, Units 1 and 2 |
Docket Nos. 50-266 and 50-301 |
Point Beach Nuclear Plant, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 19, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Point Beach Nuclear Plant, Units 1 and 2—Response to Request for Additional Information, Request for Exemption from 10 CFR part 73, appendix B, section VI Regarding Annual Force-On-Force Exercise, dated December 8, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Start Printed Page 5278 |
Point Beach Nuclear Plant, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0210 [COVID-19]), dated December 15, 2020 | ML20345A000. |
Prairie Island Nuclear Generating Plant, Units 1 and 2 |
Docket Nos. 50-282 and 50-306 |
Monticello and Prairie Island—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3(l)(1) Re: Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated October 30, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Response to Request for Additional Information, Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3(l)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 14, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Prairie Island Nuclear Generating Plant, Units 1 and 2—Exemption from Certain Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0177 [COVID-19]), dated December 21, 2020 | ML20317A259. |
Quad Cities Nuclear Power Station, Units 1 and 2 |
Docket Nos. 50-254 and 50-265 |
Exelon Generation—Request for Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force Exercises due to COVID-19 Public Health Emergency, dated November 13, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Quad Cities Nuclear Power Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0193 [COVID-19]), dated December 4, 2020 | ML20332A175. |
Quad Cities Nuclear Power Station, Units 1 and 2 |
Docket Nos. 50-254 and 50-265 |
Quad Cities Nuclear Power Station, Units 1 and 2—COVID-19 Related Request for Exemption from 10 CFR part 26 Work Hours Requirements, dated December 4, 2020 | ML20339A474. |
Quad Cities Nuclear Power Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0228 [COVID-19]), dated December 17, 2020 | ML20343A027. |
R. E. Ginna Nuclear Power Plant |
Docket No. 50-244 |
Exelon Generation—Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 13, 2020 | ML20318A288. |
R. E. Ginna Nuclear Power Plant—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0202 [COVID-19]), dated December 10, 2020 | ML20330A291. |
River Bend Station, Unit 1 |
Docket No. 50-458 |
River Bend Station, Unit 1—One-Time Schedular Exemption Request from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Public Health Emergency, dated December 3, 2020 | ML20338A539. |
River Bend Station, Unit 1—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F.2.b (EPID-L-2020-LLE-0212 [COVID-19]), dated December 22, 2020 | ML20344A135. |
St. Lucie Plant, Unit Nos. 1 and 2 |
Docket Nos. 50-335 and 50-389 |
St. Lucie Plant, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 9, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
St. Lucie Plant, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0234) [COVID-19], dated December 18, 2020 | ML20352A118. |
Seabrook Station, Unit No. 1 |
Docket No. 50-443 |
Seabrook Station, Unit No. 1—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 23, 2020 | ML20329A205. |
Seabrook Station, Unit No. 1—Response to Request for Additional Information in Response to One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated December 8, 2020 | ML20343A112. |
Start Printed Page 5279 |
Seabrook Station, Unit No. 1—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0219 [COVID-19]), dated December 16, 2020 | ML20336A006. |
Seabrook Station, Unit No. 1 |
Docket No. 50-443 |
Seabrook Station, Unit No. 1—One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR part 50, appendix E, sections IV.F.2.b and IV.F.2.c, dated December 3, 2020 | ML20338A493. |
Seabrook Station, Unit No. 1—Exemption from Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0229 and EPID L-2020-LLE-0230 [COVID-19]), dated December 21, 2020 | ML20345A119. |
Shearon Harris Nuclear Power Plant, Unit 1 |
Docket No. 50-400 |
Duke Energy—Request for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 4, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Duke Energy—Response to Request for Additional Information for One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 19, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Shearon Harris Nuclear Power Plant, Unit No. 1—Exemption from Annual Force-on-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3(l)(1) (EPID L-2020-LLE-0180 [COVID-19]), dated December 17, 2020 | ML20330A301. |
South Texas Project, Units 1 and 2 |
Docket Nos. 50-498 and 50-499 |
South Texas Project, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 16, 2020 | ML20321A331. |
South Texas Project, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0205 [COVID-19]), dated December 10, 2020 | ML20330A312. |
Surry Power Station, Unit Nos. 1 and 2 |
Docket Nos. 50-280 and 50-281 |
Surry Power Station, Unit Nos. 1 and 2—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises due to COVID-19 Pandemic, dated December 3, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Surry Power Station, Unit Nos. 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0226 [COVID-19]), dated December 14, 2020 | ML20339A645. |
Susquehanna Steam Electric Station, Units 1 and 2 |
Docket Nos. 50-387 and 50-388 |
Susquehanna Steam Electric Station—Request for One-Time Exemption From 10 CFR part 73, appendix B, section VI, subsection C.3.(1)(1) Regarding Annual Force-On-Force Exercises due to COVID-19 Pandemic, dated November 24, 2020 | ML20329A335. |
Susquehanna Steam Electric Station, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0222), dated December 17, 2020 | ML20344A458. |
Virgil C. Summer Nuclear Station, Unit No. 1 |
Docket No. 50-395 |
Virgil C. Summer Nuclear Station, Unit No. 1—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-On-Force Exercises due to COVID-19 Pandemic, dated December 3, 2020 | non-public, withheld pursuant to 10 CFR 2.390. |
Virgil C. Summer Nuclear Station, Unit No. 1—Exemption from Annual Force On-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1)I (EPID L-2020-LLE-0225 [COVID-19]), dated December 18, 2020 | ML20342A003. |
Vogtle Electric Generating Plant, Units 1 and 2 |
Docket Nos. 50-424 and 50-425 |
Request for One-Time Exemptions from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 6, 2020 | ML20311A662. |
Vogtle Electric Generating Plant, Units 1 and 2—Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI C.3.(I)(1) (EPID L-2020-LLE-0216 [COVID-19]), dated December 4, 2020 | ML20329A392. |
Start Printed Page 5280 |
Waterford Steam Electric Station, Unit 3 |
Docket No. 50-382 |
Waterford Steam Electric Station, Unit 3—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force Exercises due to COVID-19 Pandemic, dated November 12, 2020 | ML20317A301. |
Waterford Steam Electric Station, Unit 3—Exemption from Annual Force-On-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3.(I)(1) (EPID L-2020-LLE-0186 [COVID-19]), dated December 16, 2020 | ML20338A274. |
Watts Bar Nuclear Plant, Units 1 and 2 |
Docket Nos. 50-390 and 50-391 |
Watts Bar Nuclear Plant, Units 1 and 2—Request for Exemption Regarding Calendar Year 2020 Force-on-Force Exercise, dated November 4, 2020 | ML20309A695. |
Watts Bar Nuclear Plant, Units 1 and 2—Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI C.3(l)(1) (EPID L-2020-LLE-0179 [COVID-19]), dated December 8, 2020 | ML20318A036. |