This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Iroquois Gas Transmission System, L.P.; Notice of Availability of The Final Environmental Impact Statement for The Proposed Enhancement by Compression Project
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
There is no table of contents available for this document.
Related Documents
Enhanced Content - Related Documents
FederalRegister.gov uses the agency dockets published with the document to display related documents.
Iroquois Gas Transmission System, L.P.; Notice of Availability of The Final Environmental Impact Statement for The Proposed Enhancement by Compression Project
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
130
as of
04/18/2025 at 4:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is the current
document as it appeared on Public Inspection on
11/17/2021 at 8:45 am.
It was viewed
2
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2021-25179 (86 FR 64467)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a final environmental impact statement (EIS) for the Enhancement by Compression Project (Project), proposed by Iroquois Gas Transmission System, L.P. (Iroquois) in the above-referenced docket. Iroquois requests authorization to construct and operate natural gas transmission facilities in New York and Connecticut. The Project is designed to provide a total of 125,000 dekatherms per day of incremental firm transportation service for two existing customers of Iroquois, Consolidated Edison Company of New York, Inc. and KeySpan Gas East Corporation doing business as National Grid.
The final EIS assesses the potential environmental effects of the construction and operation of the Project in accordance with the requirements of the National Environmental Policy Act. The final EIS is not a decision document. It presents Commission staff's independent analysis of the environmental issues for the Commission to consider when addressing the merits of all issues in this proceeding.
The final EIS responds to comments that were received on the Commission's September 30, 2020 Environmental Assessment (EA) and June 11, 2021 draft EIS [1]
and discloses downstream greenhouse gas emissions for the Project. With the exception of climate change impacts, FERC staff concludes that approval of the proposed Project, with the mitigation measures recommended in this EIS, would not result in significant environmental impacts. FERC staff continues to be unable to determine significance with regards to climate change impacts.
The final EIS incorporates the above-referenced EA, which addressed the potential environmental effects of the construction and operation of the following Project facilities:
Athens Compressor Station—installation of one new 12,000 horsepower (hp) natural gas-fired turbine (Unit A2) in a new building with associated cooling, filter separators, and other facilities connecting to Iroquois' existing 24-inch-diameter mainline within the existing fenced compressor station boundary (Greene County, New York).
Dover Compressor Station—installation of one new 12,000 hp natural gas-fired turbine (Unit A2) in a new building with associated cooling, filter separators, and other facilities connecting to Iroquois' existing 24-inch-diameter mainline and expansion of the existing compressor station fenceline within the property boundary (Dutchess County, New York).
Brookfield Compressor Station—construction of a control/office building, addition of two new 12,000 hp, natural gas-fired turbines (Unit B1 and Unit B2) in a new building with associated cooling, filter separators, and other typical facilities connecting to Iroquois' existing 24-inch-diameter mainline. Additionally, Iroquois would install incremental cooling at Plant 2-A to allow for compressed discharge gas to be cooled, prior to being compressed at the proposed downstream compressors (Units B1 and B2). Iroquois would also replace existing turbine stacks on the existing compressor units (Unit-A1 and Unit-A2) and add other noise reduction measures (e.g.,
louvers, seals) to minimize existing noise at the site. Modifications at this site would require expansion of the existing compressor station fenceline within the property boundary (Fairfield County, Connecticut).
Milford Compressor Station—addition of gas cooling to existing compressor units and associated piping to allow for compressed discharge gas to be cooled within the current fenced boundaries of the existing compressor station, where no gas cooling facilities currently exist (New Haven County, Connecticut).
The Commission mailed a copy of the
Notice of Availability of the Final Environmental Impact Statement for the Proposed Enhancement by Compression Project
to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the Project area. The final EIS is only available in electronic format. It may be viewed and downloaded from the FERC's website (
www.ferc.gov), on the natural gas environmental documents page (
https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents). In addition, the final EIS may be accessed by using the eLibrary link on the FERC's website. Click on the eLibrary link (
https://elibrary.ferc.gov/eLibrary/search) select “General Search” and enter the docket number in the “Docket Number” field (
i.e.,
CP20-48-000). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov
or toll free at (866) 208-3676, or for TTY, contact (202) 502-8659.
Additional information about the Project is available from the Commission's Office of External Affairs, at (866) 208-FERC, or on the FERC website (
www.ferc.gov) using the eLibrary link. The eLibrary link also
( printed page 64468)
provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called eSubscription that allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to
https://www.ferc.gov/ferc-online/overview
to register for eSubscription.
Dated: November 12, 2021.
Kimberly D. Bose,
Secretary.
Footnotes
1.
The Project's Environmental Assessment is available on eLibrary under accession no. 20200930-3011 and the draft EIS is available under accession no. 20210611-3022.