This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
DoD, GSA, and NASA will consider all comments received by January 25, 2022.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
177
as of
08/17/2026 at 8:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2021-25794 as it appeared on Public Inspection on
11/24/2021 at 8:45 am.
It was viewed
8
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2021-25794 (86 FR 67469)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Notice and request for comments.
SUMMARY:
In accordance with the Paperwork Reduction Act of 1995, and the Office of Management and Budget (OMB) regulations, DoD, GSA, and NASA invite the public to comment on a revision concerning certain Federal Acquisition Regulation (FAR) part 15 requirements.
DoD, GSA, and NASA invite comments on: Whether the proposed collection of information is necessary for the proper performance of the functions of Federal Government acquisitions, including whether the information will have practical utility; the accuracy of the estimate of the burden of the proposed information collection; ways to enhance the quality, utility, and clarity of the information to be collected; and ways to minimize the burden of the information collection on respondents, including the use of automated collection techniques or other forms of information technology. OMB has approved this information collection for use through January 31, 2022. DoD, GSA, and NASA propose that OMB extend its approval for use for three additional years beyond the current expiration date.
DATES:
DoD, GSA, and NASA will consider all comments received by January 25, 2022.
ADDRESSES:
DoD, GSA, and NASA invite interested persons to submit comments on this collection through
https://www.regulations.gov
and follow the instructions on the site. This website provides the ability to type short comments directly into the comment field or attach a file for lengthier comments. If there are difficulties submitting comments, contact the GSA Regulatory Secretariat Division at 202-501-4755 or
GSARegSec@gsa.gov.
Instructions:
All items submitted must cite OMB Control No. 9000-0048, Certain Federal Acquisition Regulation Part 15 Requirements. Comments received generally will be posted without change to
https://www.regulations.gov,
including any personal and/or business confidential information provided. To confirm receipt of your comment(s), please check
www.regulations.gov,
approximately two-to-three days after submission to verify posting.
FOR FURTHER INFORMATION CONTACT:
Zenaida Delgado, Procurement Analyst, at telephone 202-969-7207, or
zenaida.delgado@gsa.gov.
SUPPLEMENTARY INFORMATION:
A. OMB Control Number, Title, and Any Associated Form(s)
9000-0048, Certain Federal Acquisition Regulation Part 15 Requirements.
B. Need and Uses
DoD, GSA, and NASA are combining OMB Control Nos. for the Federal Acquisition Regulation (FAR) by FAR part. This consolidation is expected to improve industry's ability to easily and efficiently identify burdens associated with a given FAR part. The review of the information collections by FAR part allows improved oversight to ensure there is no redundant or unaccounted for burden placed on industry. Lastly, combining information collections in a given FAR part is also expected to reduce the administrative burden associated with processing multiple information collections.
This justification supports the revision of the expiration date of OMB Control No. 9000-0048 and combines it with the previously approved information collections under OMB Control No. 9000-0078, with the new title “Certain Federal Acquisition Regulation Part 15 Requirements.” Upon approval of this consolidated information collection, OMB Control No. 9000-0078 will be discontinued. The burden requirements previously approved under the discontinued number will be covered under OMB Control No. 9000-0048.
This clearance covers the information that offerors and contractors must submit to comply with the following FAR requirements:
1. FAR 15.407-2(e), Make-or-buy programs. When prospective contractors are required to submit proposed make-or-buy program plans for negotiated acquisitions, paragraph (e) requires the following information in their proposal:
(a) A description of each major item or work effort;
(b) Categorization of each major item or work effort as “must make,” “must buy, or “can either make or buy”;
(c) For each item or work effort categorized as “can either make or buy,” a proposal either to “make” or to “buy”;
(d) Reasons for categorizing items and work efforts as “must make” or “must buy,” and proposing to “make” or to “buy” those categorized as “can either make or buy”;
(e) Designation of the plant or division proposed to make each item or perform each work effort, and a statement as to whether the existing or proposed new facility is in or near a labor surplus area;
(f) Identification of proposed subcontractors, if known, and their location and size status;
(g) Any recommendations to defer make-or-buy decisions when categorization of some items or work efforts is impracticable at the time of submission; and
(h) Any other information the contracting officer requires in order to evaluate the program.
2. FAR 52.215-1(c)(2)(iv)—Authorized Negotiators. This provision requires firms offering supplies or services to the Government under negotiated solicitations to provide the names, titles, and telephone and facsimile numbers (and electronic addresses if available) of authorized negotiators to assure that discussions are held with authorized individuals.
3. FAR 52.215-9, Changes or Additions to Make-or-Buy Program. This clause requires the contractor to submit, in writing, for the contracting officer's advance approval a notification and justification of any proposed change in the make-or-buy program incorporated in the contract.
4. FAR 52.215-14—Integrity of Unit Prices. This clause requires offerors and contractors under negotiated solicitations and contracts to identify those supplies which they will not
( printed page 67470)
manufacture or to which they will not contribute significant value, if requested by the contracting officer or when contracting without adequate price competition.
5. FAR 52.215-19—Notification of Ownership Changes. This clause requires contractors to notify the administrative contracting officer when the contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records.
6. FAR 52.215-22, Limitations on Pass-Through Charges—Identification of Subcontract Effort. This provision requires offerors submitting a proposal for a contract, task order, or delivery order to provide the following information with their proposal:
(a) The total cost of the work to be performed by the offeror, and the total cost of the work to be performed by each subcontractor;
(b) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed, the amount of the offeror's indirect costs and profit/fee applicable to the work to be performed by the subcontractor(s), and a description of the value added by the offeror as related to the work to be performed by the subcontractor(s); and
(c) If any subcontractor proposed intends to subcontract to a lower-tier subcontractor more than 70 percent of the total cost of work to be performed, the amount of the subcontractor's indirect costs and profit/fee applicable to the work to be performed by the lower-tier subcontractor(s) and a description of the added value provided by the subcontractor as related to the work to be performed by the lower-tier subcontractor(s).
7. FAR 52.215-23, Limitations on Pass-Through Charges. This clause requires contractors to provide a description of the value added by the contractor or subcontractor, as applicable, as related to the subcontract effort if the effort changes from the amount identified in the proposal such that it exceeds 70 percent of the total cost of work to be performed.
Obtaining Copies:
Requesters may obtain a copy of the information collection documents from the GSA Regulatory Secretariat Division, by calling 202-501-4755 or emailing
GSARegSec@gsa.gov.
Please cite OMB Control No. 9000-0048, Certain Federal Acquisition Regulation Part 15 Requirements.
Janet Fry,
Director, Federal Acquisition Policy Division, Office of Governmentwide Acquisition Policy, Office of Acquisition Policy, Office of Governmentwide Policy.