This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
368
as of
08/16/2026 at 4:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2022-00785 as it appeared on Public Inspection on
01/14/2022 at 8:45 am.
It was viewed
6
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2022-00785 (87 FR 2554)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule.
SUMMARY:
Due to the receipt of an adverse comment on a direct final rule published on September 29, 2021, the Environmental Protection Agency (EPA) is revising its regulations approving elements of a State Implementation Plan revision submitted by the Illinois Environmental Protection Agency on September 29, 2017, May 16, 2019, and September 22, 2020. The submitted revisions were intended to address the infrastructure requirements of section 110 of the Clean Air Act for the 2012 annual fine particulate matter (PM2.5) and 2015 ozone National Ambient Air Quality Standards (NAAQS).
DATES:
This final rule is effective January 18, 2022.
FOR FURTHER INFORMATION CONTACT:
Olivia Davidson, Environmental Scientist, Attainment Planning and Maintenance Section, Air Programs Branch (AR-18J), EPA, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604, (312) 886-0266.
davidson.olivia@epa.gov.
The EPA Region 5 office is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding Federal holidays and facility closures due to COVID-19.
SUPPLEMENTARY INFORMATION:
EPA published a direct final rule on September 29, 2021 (86 FR 53872), approving elements of a State Implementation Plan (SIP) revision submitted by the State of Illinois regarding the infrastructure requirements of section 110 of the Clean Air Act (CAA) for the 2012 PM2.5
and 2015 ozone NAAQS and approving the infrastructure requirements related to Prevention of Significant Deterioration (PSD) for previous NAAQS. In the direct final rule, EPA stated that if adverse comments were received by October 29, 2021, the rule would be withdrawn and not take effect. On October 27, 2021, EPA received a comment. EPA believes this comment is adverse and, therefore, EPA is revising its regulations because EPA was unable to withdraw the direct final rule before it took effect. EPA will address the comment in a subsequent final action based upon the proposed action also published on September 29, 2021.
See86 FR 53915. EPA will not institute a second comment period on this action.
CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(ii), (E) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(C) and (J) with respect to PSD have been disapproved.
CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(ii), (E) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(C) and (J) with respect to PSD have been disapproved.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(i)(I) [Prongs 1 and 2], (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(i)(I) [Prongs 1 and 2], (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.
All CAA infrastructure elements under 110(a)(2) have been approved except (D)(ii), and the PSD portions of (C), (D)(i)(II) [Prong 3], and (J), which have been disapproved, and (D)(i)(I) [Prongs 1 and 2], which have not yet been submitted. The disapproved elements have Federal Implementation Plans (FIP) in place and no further action is needed.