This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Revision 3 to RG 3.54 is available on May 19, 2022.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
149
as of
10/09/2026 at 2:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2022-10754 as it appeared on Public Inspection on
05/18/2022 at 8:45 am.
It was viewed
3
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2022-10754 (87 FR 30517)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Regulatory guide; issuance.
SUMMARY:
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 3 to Regulatory Guide (RG) 3.54, “Spent Fuel Heat Generation in an Independent Spent Fuel Storage Installation.” This RG includes methods acceptable to the NRC staff for calculating spent nuclear fuel heat generation rates for use for an Independent Spent Fuel Storage Installation. Revision 3 incorporates corrections to Appendix A, Table A-1 that were erroneously recorded in the previous revision (Revision 2 to this RG). In general, this revision presents an up-to-date methodology for determining heat generation rates and it also allows loading of higher burnup fuel by using more accurate methods for decay heat calculations.
DATES:
Revision 3 to RG 3.54 is available on May 19, 2022.
ADDRESSES:
Please refer to Docket ID NRC-2022-0116 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:
Federal Rulemaking Website:
Go to
https://www.regulations.gov
and search for Docket ID NRC-2022-0116. Address questions about Docket IDs in
Regulations.gov
to Stacy Schumann; telephone: 301-415-0624; email:
Stacy.Schumann@nrc.gov.
For technical questions, contact the individuals listed in the
FOR FURTHER INFORMATION CONTACT
section of this document.
NRC's Agencywide Documents Access and Management System (ADAMS):
You may obtain publicly available documents online in the ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/adams.html.
To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to
PDR.Resource@nrc.gov.
The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
NRC's PDR:
You may examine and purchase copies of public documents, by appointment, at the NRC's PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to
PDR.Resource@nrc.gov
or call 1-800-397-4209 or 301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal holidays.
Revision 3 to RG 3.54 may be found in ADAMS under Accession No. ML22066B275.
Regulatory guides are not copyrighted, and NRC approval is not required to reproduce them.
FOR FURTHER INFORMATION CONTACT:
Alexis Sotomayor-Rivera, Office of Nuclear Material Safety and Safeguards, telephone: 301-415-7265; email:
Alexis.Sotomayor-Rivera@nrc.gov,
Harriet Karagiannis, telephone: 301-415-2493; email:
Harriet.Karagiannis@nrc.gov,
and Ramon Gascot Lozada telephone: 301-415-2004, email:
Ramon.GascotLozada@nrc.gov,
both staff of the Office of Nuclear Regulatory Research. All are staff at the U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
SUPPLEMENTARY INFORMATION:
I. Discussion
The NRC is issuing an administrative revision to an existing guide in the NRC's “Regulatory Guide” series. Regulatory guides were developed to describe and make available to the public information and methods that are acceptable to the NRC staff for implementing specific parts of the agency's regulations, techniques that the staff uses in evaluating specific issues or postulated events, and data that the staff needs in its review of applications for permits and licenses. The NRC typically seeks public comment on a draft version of a RG by announcing its availability for comment in the
Federal Register
. However, as explained in NRC's Management Directive (MD) 6.6 “Regulatory Guides,” (ADAMS Accession No. ML110330475) the NRC may directly issue a final RG without a draft version or public comment period if the changes to the RG are non-substantive.
The NRC is issuing Revision 3 of RG 3.54 directly as a final RG because the
( printed page 30518)
changes between Revision 2 and Revision 3 are non-substantive. This revision (Revision 3) like Revision 2 presents an up-to-date methodology for determining heat generation rates for both pressurized-water reactor and boiling water reactor fuel and provides greater flexibility (fewer restrictions). It allows loading of higher burnup fuel by using more accurate methods for decay heat calculations by covering a wider range of fuel characteristics, including operating history. Appendix A provides an example that illustrates the use of the RG for calculating the decay heat generation rate for a spent fuel assembly. However, Appendix A to Revision 2 of RG 3.54 included erroneous data.
Revision 3 of RG 3.54 is issued to incorporate corrections for Appendix A, Table A-1 showing the correct irradiation data for an assembly C-64. These corrected data are as follows: (1) The last column of the Table A-1, the third row (operating (days)) is now recorded as 3.39E+02, (2) the fourth row (downtime (days)) is recorded as 1.633E+03, (3) the fifth row (cumulative burnup (MWd/KgU)) is recorded as 3.9384E+01, and (4) the sixth row (Power (W/KgU)) is recorded as 2.8378E+04.
II. Backfitting, Forward Fitting, and Issue Finality
The NRC staff may use this RG as a reference in its regulatory processes, such as licensing, inspection, or enforcement. However, the NRC staff does not intend to use the guidance in this RG to support NRC staff actions in a manner that would constitute backfitting as that term is defined in Section 50.109 of title 10 of the
Code of Federal Regulations
(10 CFR), “Backfitting,” and as described in NRC MD 8.4, “Management of Backfitting, Forward Fitting, Issue Finality, and Information Requests” (ADAMS Accession No. ML18093B087), nor does the NRC staff intend to use the guidance to affect the issue finality of an approval under 10 CFR part 52. The staff also does not intend to use the guidance to support NRC staff actions in a manner that constitutes forward fitting as that term is defined and described in MD 8.4. If a licensee believes that the NRC is using this RG in a manner inconsistent with the discussion in the Implementation section of RG 3.54, then the licensee may file a backfitting or forward fitting appeal with the NRC in accordance with the process in MD 8.4.
III. Congressional Review Act
This RG is a rule as defined in the Congressional Review Act (5 U.S.C. 801-808). However, the Office of Management and Budget has not found it to be a major rule as defined in the Congressional Review Act.
IV. Submitting Suggestions for Improvement of Regulatory Guides
Revision 3 of RG 3.54 is being issued without public comment. However, a member of the public may, at any time, submit suggestions to the NRC for improvement of existing RGs or for the development of new RGs to address new issues. Suggestions can be submitted on the NRC's public website at
https://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html.
Suggestions will be considered in future updates and enhancements to the “Regulatory Guide” series.
Dated: May 13, 2022.
For the Nuclear Regulatory Commission.
Meraj Rahimi,
Chief, Regulatory Guide and Programs Management Branch, Division of Engineering, Office of Nuclear Regulatory Research.