This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
The waiting period for the Final EIS will end 30 days after publication of this Notice of Availability in the Federal Register by the U.S. Environmental Protection Agency, at which time the Army can execute a Record of Decision.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
733
as of
10/16/2026 at 8:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2023-02861 as it appeared on Public Inspection on
02/09/2023 at 8:45 am.
It was viewed
22
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2023-02861 (88 FR 8824)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Department of the Army, DoD.
ACTION:
Notice of Availability.
SUMMARY:
The Department of the Army (Army) announces the availability of the Final Environmental Impact Statement (Final EIS) addressing heat and electrical upgrades at Fort Wainwright, Alaska. The current coal-fired central heat and power plant (CHPP) and its aging heat distribution system require an upgrade that resolves safety, resiliency, fiscal, and regulatory concerns. The Final EIS analyzes and evaluates reasonable alternatives, potential environmental impacts, and mitigation measures, and responds to comments on the Draft EIS. The Army will observe a 30-day waiting period before deciding how to proceed.
DATES:
The waiting period for the Final EIS will end 30 days after publication of this Notice of Availability in the
Federal Register
by the U.S. Environmental Protection Agency, at which time the Army can execute a Record of Decision.
ADDRESSES:
Please submit questions or requests for a hard copy of the Final EIS to Mr. Matt Sprau at: Directorate of Public Works, ATTN: AMIM-AKP-E (M. Sprau), 1046 Marks Road #4500, Fort Wainwright, AK 99703-4500; or by email at
usarmy.wainwright.id-pacific.mbx.heu-eis@army.mil.
FOR FURTHER INFORMATION CONTACT:
Mr. Grant Sattler at: Public Affairs Office, AMIM-AKG-PA (Sattler), 1060 Gaffney Road #5900, Fort Wainwright, AK 99703-5900; by telephone at (907) 353-6701; or by email at
alan.g.sattler.civ@army.mil.
SUPPLEMENTARY INFORMATION:
Fort Wainwright is in the interior of Alaska in the Fairbanks North Star Borough. It is home to U.S. Army Garrison—Alaska (USAG-Alaska) and units of the 11th Airborne Division. The soldiers, families, and civilian employees that make up the Fort Wainwright population rely on a 65-year-old coal-fired CHPP and an antiquated heat distribution system, with 24 percent of the steam and condensate pipe installed in the 1950s, to heat and power more than 400 facilities. The CHPP is one of the oldest working coal-fired power plants in the United States and is operating beyond its design life. Constructing upgraded heat and electrical infrastructure would reduce utility costs, minimize the risk of a catastrophic failure, help safeguard mission readiness, meet energy efficiency standards, comply with emissions standards, and conform to Army-directed energy security criteria.
The Final EIS was prepared in accordance with: the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S. Code § 4321
et seq.); NEPA implementing regulations issued by the President's Council on Environmental Quality (40 Code of Federal Regulations [CFR] Parts 1500-1508); and the Army's NEPA implementing regulation (32 CFR part 651, Environmental Analysis of Army Actions).
The Final EIS will inform decision-makers, as well as federal, state, and local agencies, interested parties, Alaska Natives, Native Americans, Native American organizations and Tribes, public organizations, and the general public of the possible environmental consequences associated with heat and electrical upgrades at Fort Wainwright.
USAG Alaska is proposing to upgrade its coal-fired central heat and power plant on Fort Wainwright to a more reliable and sustainable heating and electrical infrastructure system that would be compliant with Army installation energy security requirements and air quality regulations for the region. The purpose of the Proposed Action is to provide reliable heat and electrical infrastructure for the installation that resolves current safety, resiliency, fiscal, and regulatory concerns. The Proposed Action is needed to prevent the failure of heat and power generation and distribution. Such a failure could require evacuation of the installation and severely affect mission readiness. USAG-Alaska needs to meet DoD and Army energy efficiency, energy security, and resiliency criteria, and must comply with air quality regulations. Within the last decade, the installation experienced four critical, near-catastrophic failures of the CHPP and 11 unexpected, installation-wide outages due to maintenance, repair, or operational issues. Unexpected outages present substantial risk to safety and mission readiness.
The Final EIS considered a No-Action Alternative and three Action Alternatives that were determined to be reasonable: (1) construction of a new coal-fired CHPP; (2) construction of a new dual-fuel combustion turbine generator CHPP that would primarily rely on natural gas; and (3) decentralization of heat and power, whereby heat would be provided by natural gas boilers at facilities across the installation and electricity would be purchased from a local utility provider.
Implementation of the preferred alternative would result in significant adverse socioeconomic and environmental justice impacts. Significant impacts to cultural resources could be mitigated to be less than significant. Beneficial impacts would primarily involve enhancements in heating efficiency, air quality, and job creation. The Final EIS summarizes the potential impacts for each considered alternative.
The Final EIS identified several non-carbon-based alternative energy sources, including nuclear, geothermal, wind, and solar power. These alternatives were not carried forward for full analysis because they could not fully meet the heat and power needs of the installation. Such technologies could potentially be used in the future to supplement the installation's energy output.
The Army identified Alternative 3, Install Distributed Natural Gas Boilers, as the preferred alternative. The Army based its preference on: public comments; environmental, social, technical, and economic considerations; and the ability to meet the missions of USAG-Alaska and the 11th Airborne Division.
An electronic copy of the Final EIS is available online at:
https://home.army.mil/alaska/index.php/fort-wainwright/NEPA/HEU-EIS.
Hard copies of the Final EIS will be available at the following facilities when they are open: the Noel Wien Library, 1215
( printed page 8825)
Cowles Street, Fairbanks, AK 99701; the Post Library, Building 3700, Santiago Avenue, Fort Wainwright, AK 99703; and the Tri-Valley Community Library, 400 Suntrana Road, Healy, AK 99743. Requests for a hard copy of the Final EIS can also be directed to Mr. Matt Sprau at: Directorate of Public Works, ATTN: AMIM-AKP-E (M. Sprau), 1046 Marks Road #4500, Fort Wainwright, AK 99703-4500; or by email at
usarmy.wainwright.id-pacific.mbx.heu-eis@army.mil.