This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Green Mountain Power Corporation; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
There is no table of contents available for this document.
Related Documents
Enhanced Content - Related Documents
FederalRegister.gov uses the agency dockets published with the document to display related documents.
Green Mountain Power Corporation; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Public Comments
Enhanced Content - Public Comments
This feature is not available for this document.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
Additional information is not currently available for this document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
86
as of
11/07/2026 at 4:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2023-04996 as it appeared on Public Inspection on
03/09/2023 at 8:45 am.
It was viewed
2
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2023-04996 (88 FR 15011)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a.
Type of Application:
New Major License.
b.
Project No.:
2513-091.
c.
Date Filed:
February 28, 2023.
d.
Applicant:
Green Mountain Power Corporation (GMP).
e.
Name of Project:
Essex No. 19 Hydroelectric Project.
f.
Location:
On the Winooski River in Chittenden County, Vermont. The project does not affect Federal lands.
h.
Applicant Contact:
Mr. John Tedesco, Green Mountain Power Corporation, 163 Acorn Lane, Colchester, Vermont 05446; phone: (802) 655-8753 or email at
John.Tedesco@greenmountainpower.com.
j. This application is not ready for environmental analysis at this time.
k.
Project Description:
The existing project consists of: (1) a 494-foot-long concrete gravity dam consisting of a 61-foot-high non-overflow concrete abutment section and three overflow spillway sections 46-foot-high and each topped by a 5-foot-high inflatable rubber dam; (2) a 268-acre impoundment; (3) a 78-foot-wide, 36-foot-high concrete intake structure with two concrete wing walls, a steel trashrack with one-inch bar spacing, and an embedded downstream fishway; (4) two 3-foot-diameter steel penstocks and four 9-foot-diameter steel penstocks each running parallel to each other and extending underground from the dam to the powerhouse with lengths ranging from 382.9 to 389.3 feet; (5) a 154.6-foot-long, 93.5-foot-wide, and 55.7-foot-high, reinforced-concrete and brick powerhouse located 400 feet downstream of the intake housing four horizontal Francis-type turbines with an installed capacity of 2,223 kilowatts (kW) each and four horizontal shaft generators rated at 1,800 kilowatts each as well as a double horizontal Francis-type turbine (
i.e.,
minimum flow unit) with an installed capacity of 874 kW connected to a generator rated at 850 kW; (6) a 300-foot-long, 34.5-kilovolt overhead transmission line; and (7) appurtenant facilities. Green Mountain Power Corporation also owns and maintains the following recreation facilities: Overlook Park, an access site to the impoundment, an access site to the powerhouse tailrace area, and a canoe portage.
The downstream fish passage facility consists of two entrance gates each 3-feet-wide and 7.5-feet long located at the west end of the spillway. One entrance is located near the north end of the intake trashracks and the other is located closer to the center of the intake trashracks. The two entrances feed into a collection chamber behind the trashracks. The two collection chambers are connected via a 54-inch-diameter, 67-foot-long steel pipe which transports fish to an open channel sluice down the adjacent spillway and into a plunge pool. The plunge pool water level is controlled by a concrete weir with a bell-mouthed vertical slot with a 1-foot-wide opening which discharges flow into the bypassed reach.
GMP currently operates the project in a modified daily peaking mode while raising and lowering the impoundment level a maximum of 3 feet but now proposes to operate the project in run-of-river mode year-round while maintaining the impoundment at an elevation of 274.7 feet (under normal flow conditions). GMP would continue to provide minimum flows of 100 cubic feet per second (cfs) or inflow, if less, through the fish passage facility into the bypassed reach from April 15 through June 30 and from September 15 through December 15 and 50 cfs or inflow, if less, into the bypassed reach the remainder the year. The project has an average annual generation of 35,498 megawatt-hours.
l.
Location of the Application:
In addition to publishing the full text of this notice in the
Federal Register
, the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well as other documents in the proceeding (
e.g.,
license application) via the internet through the Commission's Home Page (
http://www.ferc.gov) using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document (P-2513). For assistance, contact FERC at
FERCOnlineSupport@ferc.gov
or call toll-free, (866) 208-3676 or (202) 502-8659 (TTY).
m. You may also register online at
https://ferconline.ferc.gov/FERCOnline.aspx
to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n.
Procedural Schedule:
The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate.
Milestone
Target date
Issue Deficiency Letter (if necessary)
March 2023.
Issue Additional Information Request (if necessary)
April 2023.
Notice of Acceptance/Notice of Ready for Environmental Analysis
August 2023.
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions
October 2023.
( printed page 15012)
o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.