This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
A public information and comment forum will be held on June 29, 2023 at 11 a.m. via a virtual web based meeting to allow maximum participation. Persons desiring to attend the forum should notify Southeastern by June 22, 2023, so that a list of forum participants can be prepared. Persons desiring to speak at the forum should specify this in their notification to Southeastern; others may speak if time permits. Written comments are due July 14, 2023, fifteen (15) days after the scheduled comment forum.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
113
as of
07/19/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2023-08633 as it appeared on Public Inspection on
04/24/2023 at 8:45 am.
It was viewed
6
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2023-08633 (88 FR 24981)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Southeastern Power Administration, DOE.
ACTION:
Notice of proposed revision to power marketing policy.
SUMMARY:
Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy, published in the
Federal Register
on July 6, 1978, Southeastern Power Administration (Southeastern) published on October 21, 2021, a notice of intent to revise its power marketing policy to include provisions regarding renewable energy certificates (RECs) from its Cumberland System of Projects. The current power marketing policy was published on August 5, 1993, for the Cumberland System (System) and is reflected in contracts for the sale of system power, which are maintained in Southeastern's headquarters office. The following is the proposed revision to the Cumberland System Power Marketing Policy to include a procedure for distribution of RECs to Preference Customers. Southeastern solicits written comments in formulating the final marketing policy revision.
DATES:
A public information and comment forum will be held on June 29, 2023 at 11 a.m. via a virtual web based meeting to allow maximum participation. Persons desiring to attend the forum should notify Southeastern by June 22, 2023, so that a list of forum participants can be prepared. Persons desiring to speak at the forum should specify this in their notification to Southeastern; others may speak if time permits. Written comments are due July 14, 2023, fifteen (15) days after the scheduled comment forum.
ADDRESSES:
Written comments should be submitted to: Virgil G. Hobbs III,
( printed page 24982)
Administrator, Southeastern Power Administration, Department of Energy, 1166 Athens Tech Road, Elberton, Georgia 30635-6711, and emailed to
comments@sepa.doe.gov.
The public information and comment forum for the revision of the Cumberland System Power marketing policy to include provisions for RECs will be by Microsoft Teams. Please register your intent to attend, including name, address, phone number, and email address, with Southeastern's Legal Assistant, Karen Fitzpatrick at
karen.fitzpatrick@sepa.doe.gov,
to receive updates on the meeting status of the comment forum.
FOR FURTHER INFORMATION CONTACT:
Leon Jourolmon IV, General Counsel, Southeastern Power Administration, 1166 Athens Tech Road, Elberton, Georgia 30635. Telephone: (706) 213-3800. Email:
leon.jourolmon@sepa.doe.gov.
SUPPLEMENTARY INFORMATION:
Pursuant to its “Procedure for Public Participation in Formulation of Marketing Policy” (43 FR 29186), Southeastern published a “Notice of Issuance of Final Power Marketing Policy, Cumberland System of Projects” in the
Federal Register
on August 5, 1993 (58 FR 41762). The policy establishes the marketing area for system power and addresses the utilization of area utility systems for essential purposes. The policy also addresses wholesale rates, resale rates, and conservation measures, but does not address RECs. Under Section 5 of the Flood Control Act of 1944 (16 U.S.C. 825s), Southeastern is responsible for the transmission disposition of electric power and energy from reservoir projects operated by the Department of the Army. Furthermore, Southeastern must transmit and dispose of such power and energy in such manner as to encourage the most widespread use at the lowest possible rates consistent with sound business principles. Rate schedules are drawn to recover all costs associated with producing and transmitting the power in accordance with repayment criteria.
Southeastern began the development of a REC distribution process at the request of customers in the Kerr-Philpott System. To expand the REC distribution to additional customers, Southeastern has begun to develop a process for REC distribution in the Cumberland System. The purpose of the distributions is to provide customers with a product that the customers have asked to receive, which will add value to the green, renewable hydropower already delivered. The revisions will not change the Administrator's prior determinations regarding power allocation within the System marketing area.
All documents introduced at the public information and comment forum, and all comments, questions and answers will be available for inspection and copying in accordance with the Freedom of Information Act (5 U.S.C. 552).
Public Notice and Comment
On October 21, 2021, Southeastern published in the
Federal Register
a “Notice of Intent to Revise Power Marketing Policy Cumberland System of Projects” (86 FR 58260) to revise its marketing policy by including provisions regarding RECs from the System. The notice requested that written comments and proposals be submitted on or before December 20, 2021. Southeastern received no public comments.
Proposed Revision to the Power Marketing Policy
The System consists of nine projects: Barkley, Center Hill, Cheatham, Cordell Hull, Dale Hollow, Laurel, Old Hickory, J. Percy Priest, and Wolf Creek. The power from the projects is currently marketed to Preference Customers located in the service areas of the Tennessee Valley Authority, Big Rivers Electric Corporation, Duke Energy Progress, East Kentucky Power Cooperative, Kentucky Utilities, Municipal Electric Agency of Mississippi, Mississippi Delta Energy Agency, the seven-member Cooperative Energy currently receiving Cumberland power, and Southern Illinois Power Cooperative.
Southeastern proposes to revise the Power Marketing Policy for the System to include the following additional provisions for RECs associated with hydroelectric generation:
Renewable Energy Certificates:
The M-RETS Tracking System creates and tracks certificates reporting generation attributes, by generating unit, for each megawatt-hour (MWh) of energy produced by registered generators. The System projects are registered generators within M-RETS. The RECs potentially satisfy Renewable Portfolio Standards, state policies, and other regulatory or voluntary clean energy standards in a number of states. Southeastern has subscribed to M-RETS and has an account in which RECs are collected and tracked for each MWh of energy produced from the System. Within M-RETS, certificates can be transferred to other M-RETS subscribers or to a third-party tracking system.
M-RETS creates a REC for every MWh of renewable energy produced by registered generators, tracks the life cycle of each REC created, and ensures against any double-counting or double-use of each REC. These RECs may be used by electricity suppliers and other energy market participants to comply with relevant state policies and regulatory programs and to support voluntary “green” electricity markets.
Southeastern proposes distribution of M-RETS-created RECs to Preference Customers with allocations of power from the System.
REC Distribution:
M-RETS (or a successor application) will be the transfer mechanism for all RECs related to the System. Southeastern shall maintain an account with M-RETS and collect RECs from the generation at the System projects. Southeastern will verify the total amount of RECs each month. Preference Customers with an allocation of power from the System are eligible to receive RECs by transfer from Southeastern's M-RETS account to their M-RETS account or that of their agent. M-RETS (or a successor application) will be the transfer mechanism for all RECs related to the Kerr-Philpott System. Any further transfer, sale use, or trade transaction would be the sole responsibility of a Preference Customer. Transfers to each customer will be based on the customer's monthly invoices during the same three-month period (quarter). Where applicable, RECs will be project-specific based on the customer's contractual arrangements. Customers receiving energy under the TVA/TVPPA contract will receive their distributions pursuant to the percentages in TVA Area Preference Customer 1978 Load document (revised March 2022).
All RECs distributed by Southeastern shall be transferred within forty-five days of the end of a quarter. Each customer must submit to Southeastern, by the tenth business day after the quarter, any notice of change to M-RETS account or agent. Any REC transfers that were not claimed or if a transfer account was not provided to Southeastern will be forfeited if they become nontransferable as described in the M-RETS terms of service, procedures, policies, or definitions of reporting and trading periods, or any subsequent rules and procedures for transfers as established.
The initial transfer process in M-RETS will be accomplished by the sixtieth day after the end of the first completed quarter subsequent to publication of the final policy revision. Any balance of RECs that exist in Southeastern's M-RETS account, other
( printed page 24983)
than the first quarter after policy revision publication, may also be transferred to Preference Customers according to the customer's invoiced energy at the time of the REC creation.
Rates:
No rates shall be established by Southeastern for RECs transferred to Preference Customers. Any cost to Southeastern, such as the M-RETS subscription, will be incorporated into marketing costs and included in recovery through the energy and capacity rates of the System.
Signing Authority
This Department of Energy document was signed on April 17, 2023, by Virgil G. Hobbs III, Administrator, Southeastern Power Administration, pursuant to delegated authority from the Secretary of Energy. That document, with the original signature and date, is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the