This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Comments and information must be received no later than June 1, 2023.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
375
as of
09/06/2026 at 10:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2023-09194 as it appeared on Public Inspection on
05/01/2023 at 8:45 am.
It was viewed
14
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2023-09194 (88 FR 27463)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
( printed page 27463)
AGENCY:
National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce.
ACTION:
Notice; receipt of application for letter of authorization; request for comments and information.
SUMMARY:
NMFS has received a request from US Wind, Inc. (US Wind) for authorization to take small numbers of marine mammals incidental to the development of the Maryland Offshore Wind Project (Project) in the Bureau of Ocean Energy Management (BOEM) Commercial Lease on the Outer Continental Shelf OCS-A 0490 off of Maryland over the course of 5 years beginning on January 1, 2025. Pursuant to regulations implementing the Marine Mammal Protection Act (MMPA), NMFS is announcing receipt of US Wind's request for regulations governing the incidental taking of marine mammals. NMFS invites the public to provide information, suggestions, and comments on US Wind's application and request.
DATES:
Comments and information must be received no later than June 1, 2023.
ADDRESSES:
Comments on the applications should be addressed to Jolie Harrison, Chief, Permits and Conservation Division, Office of Protected Resources, National Marine Fisheries Service. Physical comments should be sent to 1315 East-West Highway, Silver Spring, MD 20910 and electronic comments should be sent to
ITP.taylor@noaa.gov.
Instructions:
NMFS is not responsible for comments sent by any other method, to any other address or individual, or received after the end of the comment period. Comments received electronically, including all attachments, must not exceed a 25-megabyte file size. Attachments to electronic comments will be accepted in Microsoft Word or Excel or Adobe PDF file formats only. All comments received are a part of the public record and will generally be posted online at
https://www.fisheries.noaa.gov/national/marine-mammal-protection/incidental-take-authorizations-other-energy-activities-renewable
without change. All personal identifying information (
e.g.,
name, address) voluntarily submitted by the commenter may be publicly accessible. Do not submit confidential business information or otherwise sensitive or protected information.
Sections 101(a)(5)(A) and (D) of the MMPA (16 U.S.C. 1361et seq.) direct the Secretary of Commerce (as delegated to NMFS) to allow, upon request, the incidental, but not intentional, taking of small numbers of marine mammals by U.S. citizens who engage in a specified activity (other than commercial fishing) within a specified geographical region if certain findings are made and either regulations are issued or, if the taking is limited to harassment, a notice of a proposed authorization is provided to the public for review.
An incidental take authorization shall be granted if NMFS finds that the taking will have a negligible impact on the species or stock(s), will not have an unmitigable adverse impact on the availability of the species or stock(s) for subsistence uses (where relevant), and if the permissible methods of taking and requirements pertaining to the mitigation, monitoring and reporting of such takings are set forth.
NMFS has defined “negligible impact” in 50 CFR 216.103 as an impact resulting from the specified activity that cannot be reasonably expected to, and is not reasonably likely to, adversely affect the species or stock through effects on annual rates of recruitment or survival.
The MMPA states that the term “take” means to harass, hunt, capture, kill or attempt to harass, hunt, capture, or kill any marine mammal.
Except with respect to certain activities not pertinent here, the MMPA defines “harassment” as: any act of pursuit, torment, or annoyance, which (i) has the potential to injure a marine mammal or marine mammal stock in the wild (Level A harassment); or (ii) has the potential to disturb a marine mammal or marine mammal stock in the wild by causing disruption of behavioral patterns, including, but not limited to, migration, breathing, nursing, breeding, feeding, or sheltering (Level B harassment).
Summary of Request
On August 31, 2022, NMFS received an application from US Wind requesting authorization to take marine mammals incidental to the development of the Project in the BOEM Lease Area OCS-A-0490 off of Maryland. In response to our comments, and following an extensive information exchange with NMFS, US Wind submitted a final revised application on March 31, 2023, which we deemed adequate and complete on April 3, 2023. US Wind requests the regulations and subsequent Letter of Authorization (LOA) be valid for 5 years, beginning on January 1, 2025.
US Wind plans to construct the Project in three phases. Maryland Wind (phase 1; MarWin) is scheduled to be constructed in 2025; Momentum Wind (phase 2) is scheduled to be constructed in 2026; and Future Development (phase 3) is scheduled to be constructed in 2027. Each phase would include impact installation of wind turbine generators (WTG) and offshore substation (OSS) foundations, and inter-array and export cable trenching, laying, and burial. In addition, a single meteorological (met) tower would be installed during Momentum Wind construction. Site characterization surveys would be conducted only during the Momentum Wind and Future Development phases. Vessels would be used to transport crew, supplies, and materials to the project area to support construction. US Wind has determined that a subset of these activities (
i.e.,
installing piles using impact pile driving and site characterization surveys) may result in the take, by Level A harassment and Level B harassment, of marine mammals. Therefore, US Wind requests authorization to incidentally take marine mammals.
Specified Activities
Through a competitive leasing process under 30 CFR 585.211, US Wind was awarded Commercial Lease OCS-A 0490, offshore of Maryland, and the exclusive rights to submit a construction and operations plan (COP) for activities within the lease area. US Wind has submitted a COP to BOEM proposing the construction, operation, maintenance, and conceptual decommissioning of the Project, which is a commercial-scale offshore wind energy facilities within a Lease Area covering approximately 80,000 acres (323.75 square kilometers (km2
)) and located approximately 18.5 km off the
( printed page 27464)
coast of Maryland. The Project would consist of a total capacity of up to two gigawatts (GW) and US Wind has secured power purchase agreements (PPAs) with the state of Maryland for 1,108 megawatts (MW). The Project would include MarWin, a wind farm of approximately 300 MW, Momentum Wind, consisting of approximately 808 MW, and future development in the remainder of the lease area. The Project would consist of up to 114 wind turbine generators, 4 OSSs, 1 met tower, 2 transmission cables to shore making landfall in Delaware, and up to 4 export cables.
US Wind anticipates the following activities may potentially result in the harassment of marine mammals during the effective period of the requested regulations and associated LOA:
Installing up to 114 WTG monopile foundations with a maximum diameter of 11 meters (m) using a 4,400 kJ impact hammer;
Installing up to four OSSs foundation using 11-m monopiles driven with a 4,400 kJ impact hammer or jacket foundation comprised of 3-m pin piles driven with a 1,500 kJ impact hammer, or suction bucket foundations;
Installing one permanent met tower supported by three 1.8-m pin piles using a 500 kJ impact hammer; and
Using HRG equipment to survey the Lease Area over 28 days.
Information Solicited
Interested persons may submit information, suggestions, and comments concerning US Wind's request (see
ADDRESSES
). NMFS will consider all information, suggestions, and comments related to the request during the development of proposed regulations governing the incidental taking of marine mammals by US Wind, if appropriate.
Dated: April 26, 2023.
Kimberly Damon-Randall,
Director, Office of Protected Resources, National Marine Fisheries Service.