This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Monday, April 29, 2024 Time: 7:00 p.m. EDT Place: Village of Victory Town Hall Address: 23 Pine Street, Victory Mills, NY 12884
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Related Documents
Enhanced Content - Related Documents
FederalRegister.gov uses the agency dockets published with the document to display related documents.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
75
as of
10/11/2026 at 6:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2024-07148 as it appeared on Public Inspection on
04/03/2024 at 8:45 am.
It was viewed
0
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2024-07148 (89 FR 23597)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
( printed page 23597)
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a.
Type of Application:
New Major License.
b.
Project No.:
7153-018.
c.
Date filed:
April 29, 2022.
d.
Applicant:
Consolidated Hydro New York, LLC.
e.
Name of Project:
Victory Mills Hydroelectric Project (Victory Mills Project or project).
f.
Location:
On Fish Creek in Saratoga County in the Village of Victory, New York.
j.
Deadline for filing scoping comments:
May 30, 2024.
The Commission strongly encourages electronic filing. Please file scoping comments using the Commission's eFiling system at
https://ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/QuickComment.aspx.
You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov,
(866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy via U.S. Postal Service to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Victory Mills Hydroelectric Project (P-7153-018).
The Commission's Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application is not ready for environmental analysis at this time.
l.
The Victory Mills Project consists of:
(1) a dam that includes: (a) an approximately 150-foot-long concrete spillway varying in height from 4 to 6 feet with a crest elevation of 187.5 feet National Geodetic Vertical Datum of 1929 (NGVD29), and (b) a sluice gate section approximately 19 feet high and 40 feet long with four gated spillway bays, each with a sill elevation of 181 feet NGVD29 and containing a 7-foot-high by 8-foot-wide wooden timber gate; (2) a 4.3-acre reservoir with a gross storage capacity of approximately 18 acre-feet at the normal surface elevation of 187.5 feet NGVD29; (3) an intake channel feeding a 51-foot-long, 25-foot-high concrete intake structure; (4) an 8-foot-diameter, 300-foot-long steel penstock; (5) a 27-foot by 46-foot concrete powerhouse containing a single turbine-generator unit with an installed capacity of 1,656 kilowatts; (6) an approximately 30-foot-wide by 530-foot-long tailrace channel; (7) a 90-foot-long generator lead extending through the powerhouse to a transformer and then a 100-foot-long underground and a 20-foot-long aerial, 4.16-kilovolt transmission line to the point of interconnection; and (8) appurtenant facilities. There are no recreation facilities at the project. An average of 6,073 MWh is generated at the project annually.
The Victory Mills Project operates as a run-of-river facility with no storage or flood control capacity. A continuous minimum bypassed reach flow of 36 cubic feet per second (cfs), or inflow, whichever is less, is maintained through operation of a sluice gate at the dam. The minimum hydraulic capacity for operating the turbine unit is 60 cfs, therefore, the minimum river flow needed for project operation is 96 cfs (36 cfs plus 60 cfs). When inflow at the project is less than 96 cfs, river flows are allowed to pass downstream through the bypassed reach. When the inflow exceeds the maximum hydraulic capacity of the project at 590 cfs, the impoundment level is permitted to rise over the spillway.
m. Copies of the application can be viewed on the Commission's website at
https://www.ferc.gov,
using the “eLibrary” link. Enter the project's docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support.
You may also register online at
http://www.ferc.gov/docs-filing/esubscription.asp
to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
The Commission's Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502-6595, or at
OPP@ferc.gov.
n. Scoping Process
Pursuant to the National Environmental Policy Act (NEPA), Commission staff intends to prepare either an environmental assessment (EA) or an environmental impact statement (EIS) (collectively referred to as the “NEPA document”) that describes and evaluates the probable effects, including an assessment of the site-specific and cumulative effects, if any, of the proposed action and alternatives. The Commission's scoping process will help determine the required level of analysis and satisfy the NEPA scoping requirements, irrespective of whether the Commission issues an EA or an EIS.
Scoping Meetings
Commission staff will hold two public scoping meetings and an environmental site review in the vicinity of the project to receive input on the scope of the NEPA document. An evening meeting will focus on receiving input from the public and a daytime meeting will focus on the concerns of resource agencies, non-governmental organizations (NGOs), and Indian Tribes. We invite all interested agencies, Indian Tribes, NGOs, and individuals to attend one or both meetings. The times and locations of these meetings are as follows:
Evening Scoping Meeting
Date:
Monday, April 29, 2024
Time:
7:00 p.m. EDT
( printed page 23598)
Place:
Village of Victory Town Hall
Address:
23 Pine Street, Victory Mills, NY 12884
Daytime Scoping Meeting
Date:
Tuesday, April 30, 2024
Time:
9:00 a.m. EDT
Place:
Village of Victory Town Hall
Address:
23 Pine Street, Victory Mills, NY 12884
Copies of the Scoping Document (SD1) outlining the subject areas to be addressed in the NEPA document were distributed to the parties on the Commission's mailing list. Copies of the SD1 will be available at the scoping meeting or may be viewed on the web at
http://www.ferc.gov
using the “eLibrary” link (see item m above).
Environmental Site Review
The applicant and Commission staff will conduct an environmental site review of the project. All interested individuals, agencies, Indian Tribes, and NGOs are invited to attend. All participants are responsible for their own transportation to the site. Please RSVP via email to Miley Kinney at
Mkinney@patriothydro.com
or by phone at (603) 732-8162 by April 19, 2024, if you plan to attend the environmental site review. The time and location of the environmental site review is as follows:
Date:
Tuesday, April 30, 2024
Time:
1:00 p.m. EDT
Place:
Village of Victory Town Hall
Address:
23 Pine Street, Victory Mills, NY 12884
All persons attending the environmental site review must adhere to the following requirements: (1) all persons must wear sturdy, closed-toe shoes or boots; (2) persons with open-toed shoes/sandals/flip flops/high heels, etc. will not be allowed on the environmental site review; (3) persons must be 18 years or older; (4) no photography will be allowed inside the powerhouse; (5) no weapons are allowed on-site; (6) no alcohol/drugs are allowed on-site (or persons exhibiting the effects thereof); and (7) no animals (except for service animals) are allowed on the environmental site review.
Objectives
At the scoping meetings, Commission staff will: (1) summarize the environmental issues tentatively identified for analysis in the NEPA document; (2) solicit from the meeting participants all available information, especially quantifiable data, on the resources at issue; (3) encourage statements from experts and the public on issues that should be analyzed in the NEPA document, including viewpoints in opposition to, or in support of, the staff's preliminary views; (4) determine the resource issues to be addressed in the NEPA document; and (5) identify those issues that require a detailed analysis, as well as those issues that do not require a detailed analysis.
Procedures
The meetings are recorded by a stenographer and become part of the formal record of the Commission proceeding on the project. Individuals, NGOs, Indian Tribes, and agencies with environmental expertise and concerns are encouraged to attend the meeting and to assist the staff in defining and clarifying the issues to be addressed in the NEPA document.