This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Notice of Availability of a Draft Environmental Assessment for a Wind Energy Research Lease on the Atlantic Outer Continental Shelf Offshore Maine
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
293
as of
07/12/2026 at 12:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2024-11766 as it appeared on Public Inspection on
05/28/2024 at 8:45 am.
It was viewed
0
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2024-11766 (89 FR 46418)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Bureau of Ocean Energy Management, Interior.
ACTION:
Notice of availability.
SUMMARY:
The Bureau of Ocean Energy Management (BOEM) announces the availability of the final environmental assessment (EA) for the potential issuance of a wind energy research lease to the State of Maine. The final EA analyzes the potential environmental impacts of the site characterization and site assessment activities that are expected to take place should this research lease be issued. This notice of availability (NOA) announces the availability of the final EA. The final EA will inform BOEM's decision whether to issue the research lease.
FOR FURTHER INFORMATION CONTACT:
Brandi Sangunett, BOEM Office of Renewable Energy Programs, 45600 Woodland Road, Sterling, Virginia 20166, (703) 787-1015 or
brandi.sangunett@boem.gov.
SUPPLEMENTARY INFORMATION:
Proposed Action:
The final EA considers reasonably foreseeable environmental consequences of routine and non-routine activities associated with issuance of a wind energy research lease and related site assessment and site characterization activities within and around the lease and potential future project easements. The State of Maine provided information about planned site assessment and site characterization activities including the general location, timing, and frequency of the activities and the types of equipment and vessels likely to be used. BOEM has identified standard operating conditions (SOCs) and mitigation to reduce or eliminate the potential risks to or conflicts with specific environmental resources. These SOCs and mitigation were developed through the analyses presented in Section 3 of the final EA and through consultations with other Federal agencies. A summary of the SOCs and mitigation are listed in Appendix D of the final EA. If the research lease is issued, BOEM will require the lessee to comply with the SOCs and mitigation through lease stipulations and/or as conditions of the Site Assessment Plan and Research Activities Plan approval. This EA does not consider construction and operation of any wind energy-related research facilities within the Gulf of Maine, which, if proposed, would be evaluated by BOEM as a separate NEPA action.
Alternatives:
In addition to the Proposed Action, BOEM considered a No Action Alternative. Under the No Action Alternative, BOEM would not issue a wind energy research lease to the State of Maine and site assessment activities would not occur within the leased area of the Gulf of Maine. BOEM's preferred alternative is the Proposed Action.
Finding of No Significant Impact:
After carefully considering alternatives described and analyzed in the final EA and comments from the public and cooperating and consulting agencies on the draft EA, BOEM finds that the issuance of a wind energy research lease within the proposed lease area offshore
( printed page 46419)
Maine and related site characterization and site assessment activities would have no significant impact on the environment.