This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Notice of Availability for the Record of Decision on the Supplemental Environmental Impact Statement for the International Falls Land Port of Entry Modernization and Expansion Project in International Falls, Minnesota
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of Availability for the Record of Decision on the Supplemental Environmental Impact Statement for the International Falls Land Port of Entry Modernization and Expansion Project in International Falls, Minnesota
Notice of Availability for the Record of Decision on the Supplemental Environmental Impact Statement for the International Falls Land Port of Entry Modernization and Expansion Project in International Falls, Minnesota
09/12/2023
Notice of availability, Finding of No Practicable Alternative (FONPA).
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
119
as of
08/14/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2024-12700 as it appeared on Public Inspection on
06/10/2024 at 8:45 am.
It was viewed
0
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2024-12700 (89 FR 49177)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Great Lakes Region 5, Public Buildings Service (PBS), General Services Administration (GSA).
ACTION:
Notice.
SUMMARY:
GSA issued a Record of Decision (ROD) on the Supplemental Environmental Impact Statement (SEIS) for the International Falls Land Port of Entry (LPOE) Modernization and Expansion Project in International Falls, Minnesota (MN), on May 30, 2024. The ROD was prepared in accordance with the National Environmental Policy Act (NEPA) of 1969, the Council on Environmental Quality Regulations, and the GSA PBS NEPA Desk Guide.
Michael Gonczar, NEPA Program Manager, GSA, at 312-810-2326, or via email to
michael.gonczar@gsa.gov.
SUPPLEMENTARY INFORMATION:
Background
The International Falls LPOE is a port of entry for vehicles and pedestrians crossing the U.S.-Canada border between International Falls, MN and the town of Fort Frances, Ontario, Canada. The port is operated by the U.S. Department of Homeland Security's Customs and Border Protection (CBP) and is a full-service, multi-modal facility where CBP officers inspect commercially owned vehicles (COVs), privately owned vehicles (POVs), and pedestrians.
The
International Falls LPOE Improvements Study Final EIS,
released in 2011, assessed the potential environmental impacts associated with the proposed action of replacing the International Falls LPOE with a new LPOE facility “to improve safety, security, and functionality.” A total of ten build alternatives were considered, and a preferred action alternative was identified in the 2011 Final EIS as best satisfying the purpose and need of the project with the least overall adverse impacts to the environment. The 2011 preferred alternative consisted of demolishing the existing building, constructing new facilities at the existing LPOE, and expanding the LPOE to meet the required space standards and increased security requirements of the Federal Inspection Services. The 2011 preferred alternative proposed to move the majority of the LPOE improvements and operations to an approximately 20-acre site southeast of the existing site. Since 2011, GSA identified changes to the project, which differed from the preferred alternative described in the 2011 EIS. As such, GSA prepared a Final SEIS to assess the potential impacts of project updates, which were not assessed in the 2011 EIS.
The purpose of the Proposed Action is for GSA to support CBP's mission by bringing the International Falls LPOE operations in line with current land port design standards and operational requirements of CBP while addressing existing deficiencies identified with the ongoing port operations. In order to bring the International Falls LPOE operations in line with CBP's design standards and operational requirements, the Proposed Action is needed to (1) improve the capacity and functionality of the International Falls LPOE to meet future demand, while maintaining the capability to meet border security initiatives; (2) address spatial and layout constraints that lead to traffic congestion and safety issues for the employees and users of the LPOE; and (3) provide adequate space and facilities for the Federal agencies to accomplish their missions.
On December 9, 2022, GSA published a Notice of Intent for the SEIS and underwent a 35-day scoping period. A Draft SEIS and Draft Floodplain Assessment and Statement of Findings were issued over a 45-day public comment period on October 27, 2023; and a Final SEIS and Floodplain Assessment and Statement of Findings were issued over a 30-day waiting period on April 19, 2024.
Comments received, along with GSA's responses, during the Final SEIS waiting period are provided in Appendix A and B of the ROD.
Preferred Alternative
GSA has chosen to implement Alternative 1: Full Build as defined in the Final SEIS (GSA, April 2024). This decision is based on the Final SEIS issued in April 2024; associated technical reports; comments from Federal and State agencies, stakeholders, members of the public, and elected officials; and miscellaneous resources contained in the administrative record.
Alternative 1 (Full Build) includes the project as generally assessed under the 2011 preferred alternative but modified by project updates. Similar to the 2011 preferred alternative, Alternative 1 proposed expansion area encompasses an approximately 20-acre area that stretches east from the LPOE along the Rainy River shoreline to an area just west of a U.S. Border Patrol Station and primarily bordered by State Route 11 (SR-11) on the south. Approximately 16 and 4 acres are owned by the Packing Corporation of America (PCA) and Recreational Land Development, LLC, respectively. Most of the LPOE functions will be relocated in the expanded portion of the parcel between the Rainy River and SR-11. A construction phasing plan will be developed during design and implemented during demolition and construction to ensure continuity of operations of the LPOE, as well as minimize disruptions to PCA and other neighboring operations.
( printed page 49178)
To prepare the proposed expansion area for development, some existing utilities and PCA infrastructure will need to be accommodated in a new way, either within the LPOE via easements or moved off site to the west or south on PCA-owned land. Project changes have triggered the reconfiguration of some of the existing PCA operations on PCA lands and will require relocation of some infrastructure associated with PCA, the MD&W Railway, and OfficeMax. Relocation of utilities and infrastructure may be conducted by either GSA or PCA, depending on final acquisition negotiations. Actions taken by PCA are considered as connected actions to the Proposed Action.
Alternative 1 also considers the implementation of renewable energy technologies within the expanded and modernized LPOE. These technologies were not considered in the 2011 Final EIS but have since been proposed for inclusion in future site plans. Renewable technologies that may be incorporated into the facility design include solar and geothermal technologies, depending on the final design.
GSA is currently undergoing formal consultation with the State Historic Preservation Officer (SHPO) and consulting parties to follow coordination procedures as required under Section 106 of the National Historic Preservation Act. GSA intends on implementing and complying with all mitigation measures resulting from section 106 consultation as detailed in the ROD.
William Renner,
Director, Facilities Management and Services Programs Division, Great Lakes Region 5, U.S. General Services Administration.