This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Expansion and Modernization of the Raul Hector Castro Land Port of Entry and Proposed Commercial Land Port of Entry in Douglas, Arizona
Public Scoping Period--The public scoping period begins on Friday, October 11, 2024. Interested parties are encouraged to provide comments regarding the scope of the SEIS. Written comments must be received by November 11, 2024 (see ADDRESSES section of this NOI on how to submit comments).
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of intent (NOI); announcement of public scoping meeting.
Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Expansion and Modernization of the Raul Hector Castro Land Port of Entry and Proposed Commercial Land Port of Entry in Douglas, Arizona
Notice of intent (NOI); announcement of public scoping meeting.
Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Expansion and Modernization of the Raul Hector Castro Land Port of Entry and Proposed Commercial Land Port of Entry in Douglas, Arizona
Notice of intent (NOI); announcement of public scoping meeting.
Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Expansion and Modernization of the Raul Hector Castro Land Port of Entry and Proposed Commercial Land Port of Entry in Douglas, Arizona
Public Comments
Enhanced Content - Public Comments
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
67
as of
08/18/2026 at 6:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2024-23200 as it appeared on Public Inspection on
10/07/2024 at 8:45 am.
It was viewed
0
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2024-23200 (89 FR 81529)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Public Buildings Service (PBS), General Services Administration (GSA).
ACTION:
Notice of intent (NOI); announcement of public scoping meeting.
SUMMARY:
Pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality Regulations, and the GSA Public Buildings Service NEPA Desk Guide, GSA is issuing this notice to advise the public that a Supplemental Environmental Impact Statement (SEIS) will be prepared to evaluate potential environmental impacts from a proposed flood channel realignment and expansion of retention basin to the west of the Raul Hector Castro (RHC) Land Port of Entry (LPOE) in Douglas, Arizona. This NOI also announces the public scoping process for the SEIS.
DATES:
Public Scoping Period
—The public scoping period begins on Friday, October 11, 2024. Interested parties are encouraged to provide comments regarding the scope of the SEIS. Written comments must be received by November 11, 2024 (see
ADDRESSES
section of this NOI on how to submit comments).
Meeting Date
—A public scoping meeting will be held on Thursday, October 24, 2024, from 4:00 p.m. to 6:00 p.m. The meeting will be held in the Douglas Visitor Center (see
ADDRESSES
section for location address), where GSA will meet with governmental and public stakeholders to explain the project and obtain input on the scope of the project. The meeting will be an informal open house, where visitors may come, receive information, and provide written comments. No formal presentation will be provided.
ADDRESSES:
Public Scoping Comments
—You may send comments, identified by [2024-0002], by one of the following methods:
Email: Osmahn.Kadri@gsa.gov.
Include [2024-0002] in the subject line of the message.
Mail: Attention:
Osmahn Kadri, NEPA Project Manager, U.S. General Services Administration, c/o Potomac-Hudson Engineering, Inc., 77 Upper Rock Circle, Suite 302, Rockville, MD 20850.
Meeting Location
—A public scoping meeting will be held at the Douglas Visitor Center, 345 16th St., Douglas, AZ 85607.
GSA is beginning preparation of a SEIS to analyze the potential impacts resulting from the proposed realignment and reconstruction of the Rose Avenue Channel and construction of a new stormwater retention basin west of the expanded and modernized RHC LPOE. This SEIS will supplement the previous Environmental Impact Statement (EIS) for the RHC LPOE expansion and modernization project. GSA signed the Record of Decision (ROD) for the Final EIS for the Expansion and Modernization of the RHC LPOE and Proposed Commercial LPOE in Douglas, Arizona on May 6, 2024. GSA approved the preferred alternative, identified in the Final EIS as Alternative 2 (Concurrent Construction—Westward Expansion), which would involve construction of a new Commercial LPOE and phased expansion and modernization of the existing RHC LPOE at the same time, with expansion primarily to the west of the existing RHC LPOE.
Under the Proposed Action for the SEIS, the existing concrete box culvert beneath the LPOE would be partially maintained and extended westward near the existing vehicle inspection booths. From there, an open channel would be constructed generally parallel and to the north of Border Road and would discharge into an existing wash just west of Chino Road. The existing north-south channel that runs parallel to Pan American Avenue would be abandoned and sealed or demolished in conjunction with the expansion and modernization of the RHC LPOE. An expanded stormwater retention basin would also be constructed just west of
( printed page 81530)
the existing Alternative 2 Expansion Area as identified in the Final EIS. In addition to the Proposed Action, GSA will also consider the No Action Alternative.
The purpose of the Proposed Action is to address stormwater management and flood control needs for the expanded and modernized RHC LPOE. The need for the Proposed Action is that the current alignment of the Rose Avenue Channel will result in engineering conflicts with the current proposed layout for the expanded RHC LPOE and requires re-routing. Additional land area is also required for necessary stormwater retention at the expanded and modernized RHC LPOE.
Preliminary analysis indicates that short-term adverse environmental impacts may occur during construction on air quality and greenhouse gases from emissions; geology and soils and water resources from ground disturbance; and biological resources from ground disturbance and construction noise. GSA will be conducting a jurisdictional determination, archaeological survey, and Phase I Environmental Site Assessment to inform potential impacts to Waters of the United States, cultural resources, and human health and safety, respectively. Minimal or no impacts are expected to occur to the following resources: transportation and traffic; noise; socioeconomics, and environmental justice. Beneficial impacts are expected to infrastructure and utilities from the improvement of stormwater management facilities. The Proposed Action may require acquisition of additional land to the west of the RHC LPOE. Necessary permits and authorizations will be identified within the Draft EIS.
The Draft EIS is expected to be published in early 2025.
Russell Larson,
Director, Portfolio Management Division, Pacific Rim Region, Public Buildings Service.