This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
88
as of
08/13/2026 at 4:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2024-30357 as it appeared on Public Inspection on
12/19/2024 at 8:45 am.
It was viewed
0
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2024-30357 (89 FR 104202)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Bureau of Land Management, Interior.
ACTION:
Notice of availability.
SUMMARY:
The Bureau of Land Management (BLM) announces the availability of the Record of Decision (ROD) for the Final Environmental Impact Statement (FEIS) for the Tri-state Fuel Breaks Project located in southeastern Oregon. The ROD constitutes the decision of the BLM.
Larisa Bogardus, Public Affairs Specialist, telephone (541) 523-1407; address 100 Oregon Street Vale, OR 97918; email
lbogardus@blm.gov.
Individuals in the United States who are deaf, deafblind, hard of hearing, or have a speech disability may dial 711 (TTY, TDD, or TeleBraille) to access telecommunications relay services. Individuals outside the United States should use the relay services offered within their country to make international calls to the point-of-contact in the United States.
SUPPLEMENTARY INFORMATION:
The BLM has determined that the analysis contained within the FEIS is adequate to reach an informed decision regarding implementation of the Project in Oregon. The BLM selects Alternative 5, with minor route segments selected from other alternatives as described in the FEIS, for construction and maintenance of approximately 26,585 acres of fuel breaks, along approximately 552 miles of roads and within approximately 332 miles of the roadbed through mechanical, chemical, and/or biological (
i.e.,
targeted grazing) treatments on BLM-administered lands in Oregon. Alternative 5 was developed in response to public comments. Individually, Alternatives 2, 3, and 4 each primarily benefit a single resource. Alternative 5 blends elements of Alternatives 2, 3, and 4 to provide a strategic benefit to firefighters while minimizing disturbance to natural and cultural resources. A phased implementation of actions will occur to provide opportunity to review treatment
( printed page 104203)
effectiveness and adapt subsequent implementation actions and will also provide an opportunity for additional coordination with Oregon Department of Fish and Wildlife (ODFW) prior to fuel break construction along less-traveled roads. During the first phase, the BLM will focus on well-traveled routes in order to further enhance the knowledge base on successful treatment timing and techniques, ecological impacts of treatments, and adaptive management responses. Treatments and methods in Oregon will be the same as those identified and analyzed in the FEIS. Up to four new mineral material sites will be developed as the first phase of fuel break development is nearing completion.
All practicable means to avoid or minimize environmental harm from the Project that were analyzed in the FEIS have been adopted in this decision and are included as appendices. Design features provide implementation timing restrictions and other protections to minimize impacts to wildlife. These features include buffers for sensitive plant occurrences from non-native seeded species, mechanical treatment avoidance buffers to protect riparian resources, and treatment buffers no more than 200 feet from either side of centerline along roads to conform to the 2024 Southeastern Oregon Resource Management Plan Amendment, which established 250-foot setbacks for Wilderness Study Areas.
The Project includes a robust monitoring and adaptive management plan to manage invasive annual species and noxious weeds within fuel breaks, collect ecological trend data to provide information on the ecological effects of vegetative treatments, and outline appropriate management responses. The Project also includes management direction and required design features from the 2015 Oregon Greater Sage-grouse Approved Resource Management Plan Amendment, as described in Appendix 3 to the ROD. A programmatic agreement (Appendix 4 to the ROD) describes how BLM will meet its responsibilities under Section 106 of the National Historic Preservation Act and avoid or minimize adverse impacts to cultural resources during Project implementation and maintenance.
There have been no changes made to the selected alternative between the publication of the FEIS and the ROD.
The Department of the Interior has approved the BLM's decision. Approval of the Record of Decision therefore constitutes the final decision of the Department of the Interior and is not subject to appeal under Departmental regulations at 43 CFR part 4.