This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Notice of Availability (NOA) for the Record of Decision (ROD) on the Final Environmental Impact Statement (EIS) and Floodplain Assessment and Statement of Findings for the Kenneth G. Ward (Lynden) and Sumas Land Ports of Entry (LPOE) Modernization and Expansion Projects in Lynden and Sumas, Washington
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
NOA; public notice of ROD for the Final EIS and Floodplain Assessment and Statement of Findings.
Notice of Availability (NOA) for the Record of Decision (ROD) on the Final Environmental Impact Statement (EIS) and Floodplain Assessment and Statement of Findings for the Kenneth G. Ward (Lynden) and Sumas Land Ports of Entry (LPOE) Modernization and Expansion Projects in Lynden and Sumas, Washington
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
98
as of
08/14/2026 at 12:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2024-30597 as it appeared on Public Inspection on
12/31/2024 at 8:45 am.
It was viewed
0
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2024-30597 (90 FR 107)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Public Buildings Service (PBS), United States (U.S.) General Services Administration (GSA).
ACTION:
NOA; public notice of ROD for the Final EIS and Floodplain Assessment and Statement of Findings.
SUMMARY:
GSA issued a ROD for the Modernization and Expansion of the Lynden and Sumas LPOEs in Lynden and Sumas, Washington on December 27, 2024 (Identification Number: EISX-023-00-010-1728643103). The ROD was prepared in accordance with the National Environmental Policy Act (NEPA) of 1969 and the GSA PBS NEPA Desk Guide.
GSA is planning to modernize and expand the Lynden and Sumas LPOEs. The existing 4.8-acre Lynden LPOE serves as the port of entry for people and vehicles connecting Lynden, Washington to Aldergrove, British Columbia, Canada. The Lynden LPOE currently operates 16 hours per day, 7 days per week and processes privately owned vehicles (POVs), buses, pedestrians, and permitted commercial traffic. The existing 4.0-acre Sumas LPOE serves as the port of entry for people and vehicles connecting Sumas, Washington, to Abbotsford, British Columbia, Canada. The Sumas LPOE operates 24 hours per day, 7 days per week and processes POVs, buses, pedestrians, and commercial traffic.
The purpose of these projects is for GSA to support the U.S. Department of Homeland Security's Customs and Border Protection (CBP) mission through modernizing and expanding the Lynden and Sumas LPOEs. Accomplishing this purpose would increase the functionality, capacity, operational efficiency, effectiveness, security, sustainability, and safety of the Lynden and Sumas LPOEs. The projects are generally needed to update the current facilities at the Lynden and Sumas LPOEs, which no longer function adequately and cannot meet CBP current operational needs or Program of Requirements.
The existing Lynden and Sumas LPOEs have not undergone major improvements since their initial construction in the late 1980s and do not have sufficient space for modernization and expansion. Both facilities also have configuration and space issues that cause congestion, delays in processing times, and safety and security issues for inspection personnel. Additionally, these facilities do not have the ability to incorporate new technologies as they become available. The projects at the Lynden and Sumas LPOEs are analyzed jointly in this Final EIS due to their proximity (approximately 10 miles) to one another. Operational changes at the Lynden and Sumas LPOEs could impact each other, especially during construction.
GSA prepared a Final EIS to assess the potential impacts of these expansion and modernization projects. On August 8, 2023, GSA published a Notice of Intent for the EIS and underwent a 30-day scoping period (88 FR 53486). The Draft EIS, which considered two action alternatives and a No Action Alternative for the Lynden LPOE and three action alternatives and a No Action Alternative for the Sumas LPOE, was made available for a 45-day public comment period from August 12, 2024 to September 26, 2024. The Final EIS was issued on November 15, 2024 (89 FR 90292); starting a 30-day waiting period that ended on December 16, 2024.
One comment from U.S. Environmental Protection Agency (USEPA), Region 10 was received during the Final EIS 30-day waiting period from November 15, 2024 to December 16, 2024. The USEPA indicated that GSA addressed all the USEPA comments on the Draft EIS related to information on measures to protect water resources, improve air quality, and sustainable building design to adapt to a changing climate. No other comments were received during the Final EIS 30-day waiting period.
GSA's Preferred Alternatives and Environmentally Preferable Alternatives
GSA considered the findings in the Final EIS, stakeholder input, public comments, and tenant needs at the LPOEs to determine the preferred alternatives, including the environmentally preferable alternatives, which are discussed below.
Lynden LPOE
GSA's preferred alternative for the Lynden LPOE is to implement Lynden LPOE Alternative 3 (North-South Oriented LPOE Expansion) as described in the Final EIS. GSA has selected this alternative because it would match the orientation of the existing LPOE and facilitate more efficient traffic flow. GSA has also identified Lynden LPOE Alternative 3 as the environmentally preferable alternative.
Lynden LPOE Alternative 3 (North-South Oriented LPOE Expansion) would involve potential acquisition of primarily agricultural land to the west of the LPOE, site preparation, and construction to modernize and expand the LPOE. The maximum proposed limits of disturbance for Lynden LPOE Alternative 3 would be approximately 10.3 acres.
Sumas LPOE
GSA's preferred alternative for the Sumas LPOE is to implement Sumas LPOE Alternative 4 (Multi-Story Construction LPOE Expansion) as described in the Final EIS. GSA has selected this alternative because the operational space within the Main Building would be consolidated, and the building would use a smaller footprint within the LPOE allowing more space for other LPOE functions and increasing LPOE operational efficiency. This alternative would also add a pedestrian bridge, further increasing employee safety. GSA has also identified Sumas LPOE Alternative 4 as the environmentally preferable alternative.
Sumas LPOE Alternative 4 (Multi-Story Construction LPOE Expansion) would involve potential acquisition of land south and east of the LPOE, site preparation, and construction to modernize and expand the LPOE. The maximum proposed limits of disturbance for Sumas LPOE Alternative 4 would be approximately 12.9 acres.
Lynden LPOE and Sumas LPOE Construction Sequencing Options
The Final EIS evaluated two construction sequencing options, which could be implemented under the preferred action alternatives selected. Construction sequencing options are still being evaluated and will be determined during the design-build phase.
Under the Concurrent Construction Option, both ports would remain open during construction. Pedestrian and POV access would be maintained through the ports but limits on the number of open processing lanes and shifting of POVs to commercial owned vehicle (COV) lanes for limited times may be necessary. COVs may be detoured at times to other ports to permit adequate space for continued POV processing. Under the Sequential Construction Option, all traffic, pedestrians, POVs, and COVs would be detoured from the Lynden LPOE during the majority of its construction. Once the Lynden LPOE was reopened, construction that impacts traffic would begin on the Sumas LPOE. The Sumas LPOE would remain open to pedestrians and POVs during construction to the greatest extent possible. COVs would be detoured from the Sumas LPOE to other LPOEs during portions of the construction period.
Anamarie Crawley,