This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA-Financed Housing; Extension of HUD Compliance Dates
Public Comments
Enhanced Content - Public Comments
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
FR-6271-N-08 Rescission of Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA Financed Housing
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
1,261
as of
08/17/2026 at 2:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2025-03758 as it appeared on Public Inspection on
03/07/2025 at 8:45 am.
It was viewed
86
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2025-03758 (90 FR 11622)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
( printed page 11622)
AGENCY:
Department of Housing and Urban Development (HUD).
ACTION:
Notice; extension of compliance dates.
SUMMARY:
On April 26, 2024, HUD and the U.S. Department of Agriculture published the “Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA-Financed Housing” Notice (Final Determination) in the
Federal Register
. The Final Determination provides compliance dates for HUD programs covered by the Final Determination. This notice delays compliance dates by six months over the published compliance dates for covered projects in the following programs: Federal Housing Administration-Insured (FHA-Insured) Multifamily, FHA-Insured Single Family, Public Housing Capital Fund, and Competitive Grants (Choice Neighborhoods, Section 202, Section 811). This notice delays the compliance date for Section 8 Project Based Vouchers (PBV) until April, 2026.
DATES:
Applicable March 10, 2025.
FOR FURTHER INFORMATION CONTACT:
Lauren Hayes, Office of Environment and Energy, Department of Housing and Urban Development, 451 7th Street SW, Room 7272, Washington, DC 20410; email
energyaction@hud.gov; telephone number 202-402-4270 (this is not a toll-free number). HUD welcomes and is prepared to receive calls from individuals who are deaf or hard of hearing, as well as individuals with speech or communication disabilities. To learn more about how to make an accessible telephone call, please visit:
https://www.fcc.gov/consumers/guides/telecommunications-relay-service-trs.
SUPPLEMENTARY INFORMATION:
I. Background
On April 26, 2024, HUD and the U.S. Department of Agriculture published the Final Determination (89 FR 33112), which adopted the 2021 edition of the International Energy Conservation Code (IECC) and the 2019 edition of ANSI/ASHRAE/IES Standard 90.1: Energy Standard for Buildings, Except Low-Rise Residential Buildings (ASHRAE 90.1) as the minimum energy standards for new construction of buildings in programs covered by section 109 of the Cranston-Gonzalez National Affordable Housing Act of 1990 (42 U.S.C. 12709), as amended by the Energy Independence and Security Act of 2007 (EISA) (Pub. L. 110-140).
In Section VI of the Final Determination, the Departments provided Table 32, which lists compliance dates for the updated energy efficiency standards, also available with further guidance for HUD programs at
https://www.hudexchange.info/programs/minimum-energy-standards/.
II. Delay of Compliance Dates
HUD is delaying the compliance dates for the Final Determination's dates that have not yet passed. The compliance dates for the following programs are extended by six months: Federal Housing Administration-Insured (FHA-Insured) Multifamily, FHA-Insured Single Family, Public Housing Capital Fund, and Competitive Grants (Choice Neighborhoods, Section 202, Section 811). The compliance date for Section 8 Project Based Vouchers is extended until April 1, 2026.
The six month delay will provide additional time for the administration to review questions of fact, law and policy supporting the Final Determination and determine the need for HUD to develop further technical assistance. Additionally, the delay for Section 8 Project Based Vouchers will allow time for HUD to seek comment and publish further guidance on compliance for Section 8 PBV. HUD is not amending the compliance date for the HOME Investment Partnerships Program (HOME) and the Housing Trust Fund (HTF) Program, which has already passed. As stated on HUD Exchange, if HOME and HTF projects receive layered funding with other HUD funds covered by this notice as listed in the table below, the later compliance date applies. HUD confirms that HOME and HTF projects with funding from a program covered by this compliance date extension do not have to comply with the Final Determination until the new extended date. See
https://www.hudexchange.info/programs/minimum-energy-standards/
for more information. Program participants who may have difficulty meeting compliance dates that have already passed should contact HUD.
The updated compliance dates are as follows:
Program
Initiation event
Compliance date
HOME and HTF (If HOME/HTF funding is layered with other HUD funds, the later program compliance date applies)
Participating Jurisdiction (PJ) or HTF Grantee Funding Commitment
180 days after effective date: November 28, 2024.
Federal Housing Administration-Insured (FHA-Insured) Multifamily
Pre-application Submitted to HUD
18 months after effective date: November 28, 2025.
FHA-Insured Single Family
Building Permit Application
24 months after effective date: May 28, 2026.
Public Housing Capital Fund
HUD approvals of development proposals for new Capital Fund or mixed financed projects
18 months after effective date: November 28, 2025.
Next published NOFO after six months from the date of publication of this notice.
All programs, persistent poverty rural areas
Based on program-specific event, above
24 months after effective date: May 28, 2026.
Rental Assistance Demonstration (RAD)
N/A
Already effective by
Federal Register
Notice July 27, 2023.
III. Findings and Certifications
Environmental Impact
This notice provides updated compliance deadlines for the Final Determination. A Finding of No Significant Impact was prepared on the preliminary determination that preceded the Final Determination and remained applicable to the Final Determination. Accordingly, under 24 CFR 50.19(c)(4) this notice is categorically excluded from environmental review under the National Environmental Policy Act of 1969 (42 U.S.C. 4321).