This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Comments on the collection of information are due May 12, 2025.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
75
as of
08/11/2026 at 10:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2025-06242 as it appeared on Public Inspection on
04/10/2025 at 8:45 am.
It was viewed
2
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2025-06242 (90 FR 15457)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Notice of information collection and request for comments.
SUMMARY:
In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on a renewal of currently approved information collection, FERC-725D (Facilities Design, Connections and Maintenance Reliability Standards). This notice for the transfer of FAC-003-5 (725M) and FAC-008-5 (725A) to 725D.
DATES:
Comments on the collection of information are due May 12, 2025.
ADDRESSES:
Send written comments on FERC-725D to OMB through
www.reginfo.gov/public/do/PRAMain.
Attention: Federal Energy Regulatory Commission Desk Officer. Please identify the OMB Control Number (1902-0247) in the subject line of your comments. Comments should be sent within 30 days of publication of this notice to
www.reginfo.gov/public/do/PRAMain.
Please submit copies of your comments to the Commission. You may submit copies of your comments (identified by Docket No. IC25-8-000) by one of the following methods: Electronic filing through
https://www.ferc.gov,
is preferred.
Electronic Filing:
Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format.
For those unable to file electronically, comments may be filed by USPS mail or by other delivery methods:
○
Mail via U.S. Postal Service Only:
Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426.
○
All other delivery methods:
Federal Energy Regulatory Commission, Secretary of the Commission, 12225 Wilkins Avenue, Rockville, MD 20852.
Instructions:
OMB submissions must be formatted and filed in accordance with submission guidelines at
www.reginfo.gov/public/do/PRAMain.
Using the search function under the “Currently Under Review” field, select Federal Energy Regulatory Commission; click “submit,” and select “comment” to the right of the subject collection.
Docket:
Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at
https://www.ferc.gov/ferc-online/overview.
FOR FURTHER INFORMATION CONTACT:
Kayla Williams may be reached by email at
DataClearance@FERC.gov,
telephone at (202) 502-6468.
SUPPLEMENTARY INFORMATION:
Title:
FERC-725D, Facilities Design, Connections and Maintenance Reliability Standards.
OMB Control No.:
1902-0247.
Type of Request:
Three-year approval of the FERC-725D information collection requirements, with changes to the reporting or recordkeeping requirements. (There are adjustments to the estimates to update the totals to add in the FAC-003-5 and FAC-008-5).
Abstract:
On August 8, 2005, The Electricity Modernization Act of 2005, which is Title XII of the Energy Policy Act of 2005 (EPAct 2005), was enacted into law. EPAct 2005 added a new section 215 to the Federal Power Act (FPA), which requires a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO, subject to Commission oversight, or by the Commission independently. In 2006, the Commission certified NERC (now called the North American Electric Reliability Corporation) as the ERO pursuant to section 215 of the FPA. On March 16, 2007 (pursuant to section 215(d) of the FPA), the Commission issued Order No. 693, approving 83 of the 107 initial Reliability Standards filed by NERC. In the intervening years, numerous changes have been made to update, eliminate, or establish various Reliability Standards.
The information collected by FERC-725D is required to implement the statutory provisions of section 215 of the Federal Power Act (FPA) (16 U.S.C. 824c). Pursuant to section 215 of the Federal Power Act (FPA),[1]
in Order 836,[2]
the Commission approved the following standards: FAC-003-5 is set out to maintain a reliable electric transmission system by using a defense-in-depth strategy to manage vegetation located on transmission rights of way (ROW) and minimize encroachments from vegetation located adjacent to the ROW, thus preventing the risk of those vegetation-related outages that could lead to Cascading. FAC-003-5 is applicable to TOs and GOs and NERC has incorporated Applicability Sections 4.2.2 and 4.3.1.2 of FAC-003-5 to replace references to “elements of an IROL under NERC Standard FAC-014 by the Planning Coordinator” with references to facilities:
“Identified by the Planning Coordinator or Transmission Planner, per its Planning Assessment of the Near‐Term Transmission Planning Horizon as a Facility that if lost or degraded are expected to result in instances of instability, Cascading, or uncontrolled separation that adversely impacts the reliability of the Bulk Electric System for a planning event.”
Reliability Standard FAC-008-5 ensures that Facility Ratings used in the reliable planning and operation of the Bulk Electric System (BES) are determined based on technically sound principles. A Facility Rating is essential for the determination of System Operating Limits.
Estimate of Annual Burden[4] and Cost:
The Commission estimates an increase (adjustment) in the annual public reporting burden for the FERC-725D. In an effort to target similar NERC Reliability Standards by family the following manhours associated with two FAC (Facilities) Reliability Standards (FAC-008-5 and FAC-003-5) is being transferred from 725A (1902-0244) to the 725D (1902-0247), where other FAC
( printed page 15458)
standards are collected, as shown below in the table:
Number of
entity 5
Number of
annual
responses
per entity
Total number of responses
Average number of
burden hours
per response 6
Total burden hours
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
Transferred from FERC-725M to FERC-725D
Annual Review and Record Retention
191(TO)
1
191
1.91 hrs.; $134.98/hrs
364.81 hrs.; $25,781.12.
731(GO)
1
731
.48 hrs.; $33.92 hrs
349.41 hrs.; $24,728.14.
Carryover from RD22-2; Exp. 2026
1,393
4
5,572
8 hrs.; $565.36
44,576 hrs. $3,150,185.92.
Total for FAC-003-5
6,494
45,290.22 hrs.; $3,200,659.85.
Number of
entity 7
Number of
annual
responses
per entity
Total number of responses
Average number of
burden hours
per response 8
Total burden hours
(1)
(2)
(1) * (2) = (3)
(4)
(3) * (4) = (5)
Transferred from FERC-725A to FERC-725D
Annual review and record retention
324 (TO)
1
324
200 hrs.; $70.67/hrs
64,800 hrs.; $4,579,416.
1210 (GO)
1
1210
80 hrs.; $70.67/hrs
96,800 hrs.; $6,840,856.
Total for FAC-008-5
1,534
161,600 hrs.; $11,420,272.
Comments:
Comments are invited on: (1) whether the collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden and cost of the collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collection; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of automated collection techniques or other forms of information technology.
4.
Burden is defined as the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. For further explanation of what is included in the information collection burden, refer to 5 Code of Federal Regulations 1320.3.
5.
These values were derived from the NERC Compliance data of April 16, 2024, using only unique United States registered entities.
6.
The estimated hourly cost (salary plus benefits) is a combination based on the Bureau of Labor Statistics (BLS), as of 2024, for 75% of the average of an Electrical Engineer (17-2071) $79.31/hr., 79.31 × .75 = 59.4825 ($59.48-rounded) ($59.48/hour) and 25% of an Information and Record Clerk (43-4199) $44.74/hr., $44.74 × .25% = 11.185 ($11.19 rounded) ($11.19/hour), for a total ($59.48 + $11.19 = $70.67/hour).
7.
These values were derived from the NERC Compliance data of April 16, 2024, using only unique United States registered entities.
8.
The estimated hourly cost (salary plus benefits) is a combination based on the Bureau of Labor Statistics (BLS), as of 2024, for 75% of the average of an Electrical Engineer (17-2071) $79.31/hr., 79.31 × .75 = 59.4825 ($59.48-rounded) ($59.48/hour) and 25% of an Information and Record Clerk (43-4199) $44.74/hr., $44.74 × .25% = 11.185 ($11.19 rounded) ($11.19/hour), for a total ($59.48 + $11.19 = $70.67/hour).