This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Submit comments by October 3, 2025. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Comments are no longer being accepted.
See DATES for details.
4 comments have
been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold,
certain submissions (or portions thereof). Submitted comments may not be
available to be read until the agency has approved them.
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
104
as of
10/07/2026 at 8:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2025-14701 as it appeared on Public Inspection on
08/01/2025 at 8:45 am.
It was viewed
5
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2025-14701 (90 FR 36454)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Draft report; request for comment.
SUMMARY:
The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft report on the Level 3 Probabilistic Risk Assessment (PRA) project; specifically, “Volume 8: Integrated Site Risk, All Hazards, Level 1, Level 2, and Level 3 PRA.”
DATES:
Submit comments by October 3, 2025. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
ADDRESSES:
You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal rulemaking website:
Federal rulemaking website:
Go to
https://www.regulations.gov
and search for Docket ID NRC-2025-0098. Address questions about Docket IDs in
Regulations.gov
to Bridget Curran; telephone: 301-415-1003; email:
Bridget.Curran@nrc.gov.
For technical questions, contact the individual listed in the
For Further Information Contact
section of this document.
Mail comments to:
Office of Administration, Mail Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting comments, see “Obtaining Information and Submitting Comments” in the
SUPPLEMENTARY INFORMATION
section of this document.
FOR FURTHER INFORMATION CONTACT:
Alan Kuritzky, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1552; email:
Alan.Kuritzky@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2025-0098 when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods:
NRC's Agencywide Documents Access and Management System (ADAMS):
You may obtain publicly available documents online in the ADAMS Public Documents collection at
https://www.nrc.gov/reading-rm/adams.html.
To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email to
PDR.Resource@nrc.gov.
For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the “Availability of Documents” section.
NRC's PDR: The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email toPDR.Resource@nrc.gov
or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the Federal rulemaking website (
https://www.regulations.gov). Please include Docket ID NRC-2025-0098 in your comment submission.
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at
https://www.regulations.gov
as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Discussion
As directed in SRM-SECY-11-0089, “Options for Proceeding with Future Level 3 Probabilistic Risk Assessment (PRA) Activities,” the staff is conducting a full-scope multi-unit site Level 3 PRA (Level 3 PRA project) that addresses all internal and external hazards; all plant operating modes; and all reactor units, spent fuel pools (SFPs), and dry cask storage. The reference site for this study contains 2 four-loop Westinghouse pressurized water reactors with large dry containments. The objectives of the Level 3 PRA project are to (1) develop a Level 3 PRA, generally based on current state-of-practice methods, tools, and data, that (a) reflects technical advances since the last NRC-sponsored Level 3 PRAs (NUREG-1150), which were completed over 30 years ago, and (b) addresses scope considerations that were not previously considered (
e.g.,
low-power and shutdown risk, multi-unit risk, other radiological sources); (2) extract new insights to enhance regulatory decision making and to help focus limited NRC resources on issues most directly related to the agency's mission to protect public health and safety; (3) enhance PRA staff capability and expertise and improve documentation practices to make PRA information more accessible, retrievable, and understandable; and (4) demonstrate technical feasibility and evaluate the realistic cost of developing new Level 3 PRAs.
The work performed under this project is being documented as a multi-volume report. The current Level 3 PRA project report (Volume 8) describes the analyses and results for the integrated site risk (ISR) task. The Level 3 PRA project ISR task is a site-specific analysis that consists of the following high-level steps: sitewide dependency assessment; multi-unit (MU) Level 1, Level 2, and Level 3 PRA; and ISR analysis. Multi-unit core damage frequencies (MUCDFs) were developed for all identified multi-unit initiating events (MUIEs). The total MUCDF was approximately 10 percent of the total single-unit core damage frequency, with seismic events being the largest
( printed page 36455)
contributors to MU risk. Due to computational challenges, MU Level 2 and Level 3 analyses were limited to two MUIEs: weather-related losses of offsite power and a large seismic event. The study found that MU consequences for these MUIEs were small compared to the single-unit results. For the final ISR step, a single illustrative scenario was identified that involved potential sitewide dependencies between the reactors and the spent fuel pools and was risk-significant to both the spent fuel pools and the reactors: a large seismic event. Risk results for the illustrative ISR scenario are reported for several consequence metrics, including individual latent cancer fatality risk, collective total effective dose risk, and economic cost. Regardless of the consequence metric, the risk estimated for the illustrative ISR scenario was calculated to be low as compared to the MU and single-source (
i.e.,
single-unit reactor or SFP) results.
III. Availability of Documents
The documents identified in the following table are available to interested persons through ADAMS, as indicated.
Document description
ADAMS
accession No.
SRM-SECY-11-0089, “Options for Proceeding with Future Level 3 Probabilistic Risk Assessment (PRA) Activities,” dated September 21, 2011
ML112640419
Level 3 PRA Project, Volume 8: Integrated Site Risk, All Hazards, Level 1, Level 2, and Level 3 PRA (draft for public comment), published August 2025
ML25149A043
Dated: July 31, 2025.
For the Nuclear Regulatory Commission.
Latonia Enos-Sylla,
Acting Chief, Probability Risk Assessment Branch, Division of Risk Analysis, Office of Nuclear Regulatory Research.
4 comments have been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold, certain submissions (or portions thereof). Submitted comments may not be available to be read until the agency has approved them.